IGF::OT::IGF TASK ORDER NNC16TA02T FOR PREPARATIONS TO INTEGRATE WJ38-15 TURBINE ENGINE WITH COMBINED CYCLE ENGINE LARGE-SCALE INLET FOR MODE TRANSITION EXPERIMENTS (CCE-LIMX). NASA IS INTERESTED IN CONCEPTS AND TECHNOLOGIES WHICH WILL ENABLE A TURBINE-BASED COMBINED CYCLE (TBCC) HYPERSONIC FLIGHT VEHICLE. TO THAT END, PHASE 4 OF THE CCE-LIMX WOULD INVOLVE AN INTEGRATED INLET TEST WITH AN OPERATING TURBINE ENGINE. NASA CURRENTLY POSSESSES A WI WJ38-15 TURBINE ENGINE THAT WAS SPECIFICALLY MODIFIED TO BE SUITED TO THIS APPLICATION. IN CONJUNCTION WITH NASA, WI MODIFIED THEIR WJ38 SUBSONIC ENGINE TO EXPAND ITS OPERATING CAPABILITIES AND MAKE IT SUITABLE FOR TESTING AT MACH 3. THE ENGINE HAS BEEN FITTED WITH A DISTORTION TOLERANT FAN STAGE (THAT EMPLOYS GOVERNMENT TECHNOLOGY), AN ALTERED BYPASS DUCT, HIGH-TEMPERATURE LINERS, AN OIL MIST LUBRICATED FRONT BEARING, AND AN AFTERBURNER. NASA GLENN RESEARCH CENTER (GRC) ALSO POSSESSES A SINGLE EXPANSION RAMP NOZZLE (SERN) DESIGNED TO OPERATE WITH THE ENGINE FOR CCE-LIMX TESTING. THE TASK ORDER IS FOR: 1) A CYCLE DECK EXECUTABLE, COMPATIBLE WITH THE DSPACE SYSTEM TO BE USED IN PHASE 3 OF THE COMBINED CYCLE ENGINE LARGE-SCALE INLET MODE TRANSITION EXPERIMENT (CCE-LIMX), TO CALCULATE PERFORMANCE OUTPUTS FOR THE WJ38-15 ENGINE AT VARIOUS TUNNEL AND INLET CONDITIONS, 2) THE REDESIGN, FABRICATION, AND INSTALLATION OF AN OIL MIST LUBRICATED REAR BEARING ON THE WJ38-15 ENGINE, CURRENTLY AT THE GRC 10X10 SUPERSONIC WIND TUNNEL (SWT) FACILITY, REPLACING THE CURRENT GREASE-PACKED BEARING, 3) DELIVERY OF A CONTROL SYSTEM, FUEL SYSTEM, AND IGNITION SYSTEM WITH CONTROL PANELS, CONTROL VALVES, FUEL PUMPS, IGNITION SYSTEM, BLEED VALVES, AND BYPASS VALVES, AND 4) TECHNICAL SUPPORT FOR THE INSTALLATION OF THE WJ38-15 INTO THE NASA GRC 10X10 SWT FOR PHASE 4 OF CCE-LIMX, AND TECHNICAL SUPPORT DURING PHASE 4 OF CCE-LIMX TESTING, AND TECHNICAL SUPPORT INCLUDING NECESSARY CORRESPONDENCE, DOCUMENTATION, AND ANALYSIS FOR THE DESIGN OF THE CCE STRONGBACK AND CCE INTEGRATED NOZZLE.
$3,265,857
| Recipient | WILLIAMS INTERNATIONAL CO., L.L.C. UEI UHYUBXQZQ2A4 |
|---|---|
| Award ID | NNC16TA02T |
| Award amount | $3,265,857 |
| Award type | DELIVERY ORDER |
| Awarding agency | National Aeronautics and Space Administration — National Aeronautics and Space Administration |
| NAICS | 336412 — AIRCRAFT ENGINE AND ENGINE PARTS MANUFACTURING |
| PSC | AR12 |
| Start date | Jul 12, 2016 |
| End date | Jun 30, 2022 |
| Place of performance | WALLED LAKE, MI |
| Record updated | Apr 22, 2022 |
View the official award record
More awards won by WILLIAMS INTERNATIONAL CO., L.L.C.
FIRST ON-RAMP FOR EGLIN WIDE AGILE ACQUISITION CONTRACT (EWAAC) VEHICLE.
Department of Defense · $46,000,000,000 · Feb 25, 2022
SUPERSONIC EXPENDABLE TURBINE ENGINE (ETE) TECHNOLOGIES
Department of Defense · $10,373,187 · Jan 25, 2019
RISK REDUCTION FOR FLIGHT CAPABLE HIGH MACH EXPENDABLE TURBINE PROPULSION
Department of Defense · $5,332,886 · Sep 15, 2023
ADVANCED ENGINE SUSTAINMENT TECHNOLOGIES (AEST)
Department of Defense · $4,578,000 · Oct 25, 2018
ENGINEERING SERVICES
Department of Defense · $1,272,263 · Sep 28, 2022
Our catalog shows awards of $250K+ active within the last 5 years. Need older history or smaller awards? Tell us what you need — we expand by request.
Awards tell you who won. Bids tell you what's next. BidCatch scans 100+ federal, state, and local sources every night and sends the new opportunities matching your trade — before they're awarded to someone else. Free for 14 days, then $49.99/month.
Search open bids