Contracts expiring soon — NAICS 541712 · Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology)
When a federal contract hits its end date, the agency usually buys the same thing again — and the rebid is open to anyone. These are the Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology) contracts coming up for renewal, soonest first.
367 contracts on the radar — page 7 of 8
FMS PORT SECURITY SYSTEM ENHANCEMENT
ASTRIX TECHNOLOGY, LLC:1204486 [25-004764]- BUDGET ANALYST
AIRBASE TECHNOLOGIES I: CIVIL ENGINEERING MATERIALS & PROCESSES, FIRE & EMERGENCY SERVICES, AND AIRBASE ENERGY & UTILITIES
EFAST PA 25-001-CS ARP BUSINESS PROCESS AND COMPUTER SYSTEMS SERVICES
EXPANSION OF CIVIL SIGNAL MONITORING
HIGH FIDELITY TARGET INFORMATION VERIFICATION
DEVCOM CBC CALL 04 LABORATORY OPERATIONS SUPPORT
SEARCH AND RESCUE SATELLITE-AIDED TRACKING UNITED STATES MISSION CONTROL CENTER OPERATIONS AND MAINTENANCE SUPPORT
DISSEMINATION AND IMPLEMENTATION (D&I) RESEARCH TO IMPROVE THE EQUITY OF LIFESTYLE CHANGE INTERVENTIONS (LCIS)
FY25 HF SONAR PACKAGE FOR COLUMBIA CLASS SUBMARINES
SONAR TACTICAL DECISION AID (STDA) SUPPORT FOR VICTORIA CLASS
FIRES TEST AND EVALUATION INSTRUMENTATION PHASE 3
ENVIRONMENTAL EPIDEMIOLOGY AND HEALTH SCIENCE RESEARCH: TASK ORDER - GULF STUDY - COHORT MAINTENANCE, DATA MANAGEMENT, AND SCIENTIFIC RESEARCH
ASTRIX TECHNOLOGY, LLC:1204486 [26-001291] SCIENTIFIC SUPPORT SERVICES FOR NIDCD
CONTROLLED CORRESPONDENCE AND PROGRAM SUPPORT SERVICES FOR NIAAA
COST ESTIMATING SERVICES
PLANNING OF THE NIEHS MICROPLASTICS AND PREGNANCY (MAP) STUDY
GATE 318738 REHAB FORT WADSWORTH WATER, WASTEWATER & STORMWATER UTILITY SYSTEMS (CMR)
COST ANALYSIS SUPPORT SERVICES
EARNED VALUE MANAGEMENT (EVM) AND SCHEDULING SERVICES
VACCINE AND TREATMENT EVALUATION UNITS (VTEU) PROTOCOL DEVELOPMENT AND IMPLEMENTATION TASK AREA B-C PHASE II THERAPEUTIC TRIAL FOR TRICHURIS TRICHIURA.
MID-RANGE CAPABILITY VTWIN UPGRADE KITS AND TECHNICAL SUPPORT
INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACCOMMODATION OF THE IRIS OBSERVATORY ONTO THE LAUNCH VEHICLE. THE CONTRACTOR'S PHASE B PRELIMINARY DESIGN EFFORTS SHALL DEVELOP THE CSR AND SITE VISIT CONCEPTS INTO A PRELIMINARY DESIGN AND DEFINITION OF THE IRIS MISSION, INCLUDING ITS MISSION OPERATIONS CENTER (MOC) AND SCIENCE OPERATIONS CENTER (SOC). THE PRELIMINARY DESIGN REVIEW (PDR) SHALL BE HELD IN ACCORDANCE WITH NPR 7120.5D, NPR 7123.1A, AND GSFC STD 1001B. THE CONTRACTOR'S EFFORTS IN PHASE B SHALL FORM THE BASIS FOR FINAL ATION OF THE REMAINDER OF THE IRIS DEVELOPMENT AND OPERATIONAL PHASES (C, D, E AND F). DETAILED COST AND SCHEDULE ESTIMATES SHALL BE PREPARED AND SUBMITTED DURING PHASE B, WHICH DEFINES THE CONTRACTOR'S UPDATED BUDGET FOR PHASE B AND THE PLANNED BUDGETS FOR PHASE C, D, E AND F WORK. PERIODIC TECHNICAL AND PROGRAMMATIC INTERCHANGE MEETINGS AT BOTH THE CONTRACTOR'S FACILITY AND AT GSFC SHALL BE REQUIRED TO COORDINATE EFFORTS BETWEEN THE CONTRACTOR AND THE EXPLORERS PROJECTS OFFICE. THESE MAY BE CONDUCTED AS FACE-TO-FACE MEETINGS OR TELECONFERENCES, AS REQUIRED.
IGF::OT::IGF "GLOBAL ECOSYSTEM DYNAMICS INVESTIGATION LIDAR (GEDI)" PRINCIPAL INVESTIGATOR (PI)SUPPORT FOR THE GLOBAL ECOSYSTEM DYNAMICS INVESTIGATION (GEDI) LIDAR INVESTIGATION. THE GEDI LIDAR INVESTIGATION WILL REQUIRE A LASER-BASED SYSTEM DEVELOPED AT NASA GODDARD SPACE FLIGHT CENTER (GSFC) TO OBSERVE THE STRUCTURE OF FOREST CANOPY. THE PROJECT WILL USE A LASER-BASED SYSTEM TO STUDY A RANGE OF CLIMATES, INCLUDING THE OBSERVATION OF THE FOREST CANOPY STRUCTURE OVER THE TROPICS, AND THE TUNDRA IN HIGH NORTHERN LATITUDES. THIS DATA WILL HELP SCIENTISTS BETTER UNDERSTAND THE CHANGES IN NATURAL CARBON STORAGE WITHIN THE CARBON CYCLE FROM BOTH HUMAN-INFLUENCED ACTIVITIES AND NATURAL CLIMATE VARIATIONS.
IGF::OT::IGF LAUNCH VEHICLE/STAGES ADAPTER
SINGLE AWARD TO AGAINST GSA OASIS SB R POOL 5B FOR HWIL MISSILE TO ACQUIRE SOFTWARE/SYSTEMS/SIMULATION ENGINEERING AND COMPUTER RESOURCE ENGINEERING SUPPORT FOR THE AVIATION AND MISSILE CENTER, S3I DIRECTORATE, HWIL / VIRTUAL SIMULATORS MISSION AREA.
TIME FREQUENCY ENHANCEMENT OF GNSS MONITOR STATIONS
RS3 CONTRACT UNDER W15P7T17D0125 ENTITLED "ENGINEERING SUPPORT FOR C5ISR POSITIONING, NAVIGATION AND TIMING DIVISION"
THIS TASK ORDER SHALL PROVIDE SUPPORT FOR ENGINEERING AND PROGRAMMATIC SUPPORT IN THE DESIGN, DEVELOPMENT, INTEGRATION, TESTING, DOCUMENTATION AND EVALUATION FOR CROSS DOMAIN ELECTRONIC WARFARE SURVIVABILITY CAPABILITIES.
EX-CIS FOR JLCCTC
TI-25 COMMON CONFIGURATION MANAGEMENT MODEL
MULTISPECTRAL AEROSOLS AND TARGET TECHNOLOGIES MATT PROVIDE ASYMMETRIC CAPABILITIES NECESSARY TO PROVIDE WARFIGHTER ASYMMETRY THROUGH THE INTENTIONAL DEGRADATION OF MATERIAL PROPERTIES AND ENEMY READINESS.
1300018I EMORY UNIVERSITY; VTEU; TO 75N93020F00001-17-0111.B1C1D1.0126--TASK AREA B-D WOLBACHIA-INFECTED AEDES AEGYPTI MOSQUITOS IN REDUCING ARBOVIRAL INFECTION BRAZIL
ROCKET TECHNOLOGY ENGINEERING SERVICES
FY26 USNO GATE PERFORMANCE
THIS IS A NEW TASK ORDER UNDER D3I CONTRACT W9113M-16-D-0004. THIS TASK IS IN SUPPORT OF DIRECTED ENERGY SYSTEM INTEGRATION LABORATORY TECHNOLOGIES(DESIL).THIS EFFORT WILL VERIFY THE PERFORMANCE OF HIGH ENERGY LASER (HEL) COMPONENTS.
ADVANCED DIRECTED ENERGY TECHNOLOGIES AT SPACE AND MISSILE DEFENSE COMMAND (ADET-SMDC)
MANUFACTURING ADVANCEMENTS IN COMPONENTS FOR DIRECTED ENERGY (MACDE)
ADVANCED DIRECTED ENERGY TECHNOLOGIES AT SPACE AND MISSILE DEFENSE COMMAND (ADET-SMDC)
SMALL UNMANNED UNDERWATER VEHICLE SENSOR SYSTEM CONFIGURATION
STRIKE SYSTEMS ENGINEERING AND TECHNICAL ASSISTANCE SUPPORT SERVICES
THE CM FIRM SHALL PROVIDE 1215 CALENDAR DAYS OF CONSTRUCTION MANAGEMENT SERVICES. EXACT DATES OF PERFORMANCE HAVE YET TO BE DETERMINED AND ARE DEPENDENT UPON START OF CONSTRUCTION ACTIVITIES. THE CONSTRUCTION CONTRACT PERFORMANCE PERIOD IS 1140 CALE
FY24 HF SONAR DEVELOPMENT PACKAGE
CMR SERVICES FOR MULTIPLE CONSTRUCTION PROJECTS AT MAMMOTH CAVE NATIONAL PARK
PERFORMANCE OF STUDIES IN SUPPORT OF THE CET-RAIDIR PROGRAM.
AUSTRALIA EDGE SWITCH MODERNIZATION EQUIPMENT AND TECHNICAL SUPPORT
HF ARCI SUPPORT, UK
HF ARCI SONAR TESTING AND SUPPORT, CANADA
KOREA EDGE SWITCH MODERNIZATION EQUIPMENT AND TECHNICAL SUPPORT
EXPLOSIVE ORDNANCE DISPOSAL UNDERWATER MINE COUNTERMEASURES SYSTEM
See your codes' radar every morning.
Subscribers get this same radar filtered to their exact NAICS codes in the daily digest — plus every new open bid that matches. Start your 14-day trial →