Contracts expiring soon — NAICS 541710 · Research and Development in the Physical, Engineering, and Life Sciences
When a federal contract hits its end date, the agency usually buys the same thing again — and the rebid is open to anyone. These are the Research and Development in the Physical, Engineering, and Life Sciences contracts coming up for renewal, soonest first.
16 contracts on the radar
MULTI-PROGRAM NATIONAL PHYSICAL RESEARCH INCLUDING RARE EARTHS AND USE OF AMES MPC.
PROVIDE ENGINEERING AND TECHNICAL EXPERTISE IN PLANNING, DEVELOPING, AND MANAGING RAM AND SA PROGRAMS FOR WEAPON SYSTEMS THROUGHOUT THE LIFE CYCLE
FOCAL PLANE PACKAGE MISSION OPERATIONS AND DATA ANALYSIS - SOLAR B PHASE E
SOLAR B X RAY TELESCOPE PHASE E
GAMMA RAY LARGE AREA SPACE TELESCOPE (GLAST). THE CONTRACTOR SHALL BE RESPONSIBLE FOR SUPPORTING NASA REVIEWS&DIRECTED ENGINEERING ANALYSIS, OBSERVATION PLANNING, MISSION SCHEDULING, SATELLITE OPERATIONS, SCIENCE DATA PROCESSING SUPPORT, SPACECRAFT HEALTH/SAFETY/PERFORMANCE ANALYSIS, INSTRUMENT PERFORMANCE SUPPORT ANALYSIS, FLIGHT/GROUND SYSTEM&SOFTWARE, AND ANOMALY RESOLUTION&ANALYSIS.
TAS::80 0124::TAS DESIGN, DEVELOPMENT, TEST&EVALUATION OF PROJECT ORION
THE PRIMARY ACTIVITIES COVERED BY THIS EFFORT SPAN THE MAJOR PHASES OF THE MISSION BEGINNING WITH FORMULATION THROUGH DEVELOPMENT AND TESTING, AND ENDING ONE YEAR AFTER LAUNCH WITH THE INITIATION OF THE JAMES WEBB SPACE TELESCOPE (JWST) SCIENCE PROGRAM. THESE MAJOR ACTIVITIES ARE SEPARATED INTO THE BASELINE PROGRAM AND SPECIAL STUDIES. THE BASELINE PROGRAM INCLUDES: A. MISSION REQUIREMENTS ANALYSIS AND OBSERVATORY/MISSION DESIGN SUPPORT INCLUDING: TRADESTUDY GENERATION, SCIENCE AND OPERATIONS IMPACT ANALYSIS, SCIENCE SYSTEMS ENGINEERING SUPPORT, AND DESIGN REFERENCE MISSION ANALYSIS. B. GROUND SEGMENT DEVELOPMENT, TESTING, MAINTENANCE AND OPERATIONS INCLUDING: OPERATIONS SUPPORT OF SI, FGS, ISIM, AND OBSERVATORY INTEGRATION AND TEST (I&T), MISSION SIMULATIONS, AND DOCUMENTATION MAINTENANCE, AS WELL AS LOW COST OPERATIONS CONCEPTS. C. SCIENCE PROGRAM IMPLEMENTATION INCLUDING: MISSION PLANNING SUPPORT, SCIENCE PROGRAM DEFINITION SUPPORT, PROPOSAL MANAGEMENT AND USER GRANT ADMINISTRATION, OBSERVER ASSISTANCE, SCIENCE COMMUNITY OUTREACH, AND STAFF RESEARCH. D. COMMISSIONING PERIOD AND ROUTINE SCIENCE OPERATIONS INCLUDING: PROPOSAL GENERATION, OBSERVATION PLANNING AND SCHEDULING, OBSERVING AND USER SUPPORT, DATA PROCESSING AND PRODUCT GENERATION, ARCHIVAL AND DATA DISTRIBUTION SERVICES, CALIBRATION ASSISTANCE AND DATA ANALYSIS, AND ENGINEERING OPERATIONS SUPPORT. E. FLIGHT OPERATIONS INCLUDING: SUBSYSTEM (INCLUDING INSTRUMENTS) HEALTH AND SAFETY MONITORING, COMMAND GENERATION AND UPLOAD, SCHEDULE EXECUTION ASSURANCE, TRENDING, AND ANOMALY INVESTIGATION. F. SUPPORT AND EXECUTION OF THE ON-ORBIT COMMISSIONING PROGRAM. G. GENERATION OF PERFORMANCE, SCIENCE RETURN, AND OTHER PERTINENT INFORMATIONAL REPORTS TO THE JWST PROJECT. H. ASTRONOMICAL COMMUNITY AND GENERAL PUBLIC/EDUCATIONAL OUTREACH. EXAMPLES OF SPECIAL PROJECT ACTIVITIES MAY INCLUDE: A. FOLLOW-ON MISSION STUDIES. B. ENGINEERING NECESSARY TO RESPOND TO NEW JWST PROJECT TASKS.
SWIFT ULTRAVIOLET&OPTICAL TELESCOPES X-RAY TELESCOPE, GROUND STATION SYSTEM
EXTREME ULTRAVIOLET VARIABILITY EXPERIMENT (EVE) FOR THE SOLAR DYNAMICS OBSERVATORY(SDO)
OPERATION AND MAINTENANCE LINEAR ACCELLERATOR
BATTELLE MEMORIAL INSTITUTE/PACIFIC NORTHWEST LABORATORY OPERATING AND MANAGING CONTRACT
NEXT GENERATION SPACE TELESCOPE NIRCAM THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO MANAGE AND PERFORM PHASES A THROUGH E OF THE SELECTED NEAR-INFRARED CAMERA (NIRCAM) INSTRUMENT FLIGHT INVESTIGATION. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL THE REQUIREMENTS IN THE CONTRACT ARE MET. THE CONTRACTOR SHALL PERFORM THE FOLLOWING ACTIVITIES WITHIN EACH PHASE: PHASE A: THE CONTRACTOR SHALL DEFINE THE NIRCAM SCIENCE INVESTIGATION, SCIENCE PAYLOAD, AND MISSION OPERATIONS AND DATA SYSTEMS. THE CONTRACTOR SHALL DOCUMENT ITS FINDINGS AND CONCLUSIONS IN A CONCEPT STUDY REPORT THAT IT SHALL PREPARE AND DELIVER TO THE GOVERNMENT. THE CONTRACTOR SHALL DEFINE AND REFINE ITS EDUCATION AND PUBLIC OUTREACH PLAN DURING PHASE A. PHASES B-D: THE CONTRACTOR SHALL DESIGN, ANALYZE, DEVELOP, FABRICATE, CALIBRATE, INTEGRATE, TEST AND DELIVER THE NIRCAM SCIENCE INSTRUMENT TO NATIONAL AERONAUTICS AND SPACE ADMINISTRATION (NASA) GODDARD SPACE FLIGHT CENTER'S (GSFC) JAMES WEBB SPACE TELESCOPE (JWST) PROJECT. THE CONTRACTOR SHALL ALSO PLAN AND PREPARE FOR THE MISSION OPERATIONS PHASE DURING PHASES B-D. THIS SHALL INCLUDE DEVELOPING AN OPERATIONS AND CALIBRATION STRATEGY, DEFINING AND PLANNING THE GUARANTEED TIME OBSERVATIONS (GTO) SCIENCE PROGRAM, PREPARING AND TESTING GROUND SOFTWARE IN COLLABORATION WITH THE SCIENCE AND OPERATIONS CENTER, AND PARTICIPATING IN MISSION SIMULATIONS. THE CONTRACTOR SHALL EXECUTE ITS EDUCATION AND PUBLIC OUTREACH (E/PO) PLAN DURING PHASES B-D. PHASES E: THE CONTRACTOR SHALL PROVIDE THE NECESSARY PERSONNEL, SERVICES, MATERIALS, EQUIPMENT, AND FACILITIES NEEDED TO PERFORM MISSION OPERATIONS AND DATA ANALYSIS (MO&DA) ACTIVITIES. THE CONTRACTOR SHALL DIRECT THE EXECUTION OF ITS GTO SCIENCE PROGRAM DURING PHASE E. THE CONTRACTOR SHALL CONTINUE TO EXECUTE ITS E/PO PLAN DURING PHASE E.
SOLAR DYNAMICS OBSERVATORY PROJECT HELIOSEISMIC AND MAGNETIC IMAGER INVESTIGATION (HMI) PHASE B/C/D/E THE CONTRACTOR SHALL PROVIDE PERSONNEL, MATERIALS, EQUIPMENT, FACILITIES AND RESOURCES NECESSARY FOR DESIGN, ANALYSIS, DEVELOPMENT, FABRICATION, ASSEMBLY, INTEGRATION, TESTING, CALIBRATION, QUALIFICATION AND DELIVERY OF A FLIGHT INSTRUMENT FOR SPACECRAFT INTEGRATION. DURING SPACECRAFT INTEGRATION ACTIVITIES, THE CONTRACTOR SHALL SUPPORT INSTRUMENT INSTALLATION AND INTEGRATION, INTEGRATED SPACECRAFT TESTING AND FLIGHT QUALIFICATION, LAUNCH PROCESSING AND LAUNCH. FOLLOWING LAUNCH, THE CONTRACTOR SHALL PROVIDE THE NECESSARY ENGINEERING AND SCIENCE RESOURCES TO PERFORM INITIAL ON-ORBIT CHECKOUT AND CHARACTERIZATION OF THE INSTRUMENT AND SHALL CONDUCT SCIENCE OPERATIONS FOR THE REMAINING DURATION OF THE MISSION. THE PRINCIPAL HARDWARE DELIVERABLES OF THIS EFFORT ARE THE FLIGHT HARDWARE AND SOFTWARE CONSTITUTING THE FLIGHT INSTRUMENT PACKAGE AND THE NECESSARY SCIENCE PROCESSING AND SCIENCE OPERATIONS GROUND SYSTEMS AND SOFTWARE REQUIRED TO ANALYZE, PROCESS, DISTRIBUTE AND ARCHIVE THE SCIENCE MEASUREMENTS PERFORMED BY THE INSTRUMENT.
FOLLOW ON CONTRACT TO PROVIDE OPERATIONS AND SCIENCE SUPPORT TO THE CXO
TAS::80 0114::TAS THE ATOMOSPHERIC IMAGE ASSEMBLY
NEW TASK ORDER SOLAR ORBITER SUPRATHERMAL ION SPECTROGRAPH UNDER NNN06AA01C AEROSPACE RESEARCH, DEVELOPMENT, AND ENGINEERING SUPPORT (ARDES) CONTRACT
See your codes' radar every morning.
Subscribers get this same radar filtered to their exact NAICS codes in the daily digest — plus every new open bid that matches. Start your 14-day trial →