Contracts expiring soon — NAICS 541370 · Surveying and Mapping (except Geophysical) Services
When a federal contract hits its end date, the agency usually buys the same thing again — and the rebid is open to anyone. These are the Surveying and Mapping (except Geophysical) Services contracts coming up for renewal, soonest first.
456 contracts on the radar — page 8 of 10
THE OBJECTIVE OF THIS EFFORT IS TO CREATE A RESOURCE FOR WHICH SAB IS ABLE TO OBTAIN NEAR, REAL-TIME AND RETROSPECTIVE SATELLITE ANALYSIS BRANCH (SAB) FOR SITUATIONAL AWARENESS. SPECIFICALLY, THIS PROCUREMENT IS FOR SAR AND PROVIDES FOR THE MANNER IN
PAS - INDAGO SURVEY AND FOCUS GROUP DISCUSSION WAVE
INTERACTIVE WAYFINDING MAPS
THE PURPOSE OF THIS CONTRACT IS TO LOCATE, IDENTIFY, MARK AND DIGITIZE IN COMPUTER AIDED DESIGN (CAD) FORMAT THE UNDERGROUND UTILITIES LOCATED ON THE GROUNDS AT BELTSVILLE AGRICULTURAL RESEARCH CENTER (BARC) AND THE THE U.S. NATIONAL ARBORETUM (USNA)
BLM WETLAND MAPPING
NEVADA WETLAND MAPPING
IDAHO AND OREGON WETLAND MAPPING
EAST IDAHO WETLAND MAPPING
ALASKA WETLAND MAPPING
LENTIC MAPPING ARIZONA NORTH
ARIZONA SOUTH LENTIC MAPPING
BLANKET PURCHASE AGREEMENT (BPA) FOR BUREAU OF LAND MANAGEMENT (BLM) GEOSPATIAL TECHNOLOGY AND DATA SUPPORT SERVICES- GEOSPATIAL IMAGING SPECIALIST
2,750,000 SF EPRISMS (FY23)
BLANKET PURCHASE AGREEMENT (BPA) FOR BUREAU OF LAND MANAGEMENT (BLM) GEOSPATIAL TECHNOLOGY AND DATA SUPPORT SERVICES- AIM DATA ARCHITECT SERVICES
BDS PHASE X-MODERNIZATION AND MAINTENANCE
MMIS DATA MAINTENANCE AND CRITICAL MINERALS FRAMEWORK
ARLINGTON NATIONAL CEMETERY ORTHO IMAGERY
NC-FWS ALLIGATOR RIV NWR-AERIAL SURVEYS FOR RED-COCKADED WOODPECKER
SURVEY 21-234
SYCAN CADASTRAL
A-E SURVEYING AND MAPPING SERVICES. HYDROGRAPHIC SURVEYS, LAND SURVEYS, AND HYDRODYNAMIC SURVEYS.
TASK ORDER AGAINST THE 2024 R6 A/E BOUNDARY SURVEYING SERVICES IDIQ FOR REGION 6 OF THE FOREST SERVICE FOR BOUNDARY SURVEYING SERVICES ON THE OKA-WEN NF.
FY 25-4 GIS STAFFING CONTRACT
LEVEE A AND B BOUNDARY SURVEY
HARDSCRABBLE RAIL RIDGE BAR CADASTRAL SURVEY - BOUNDARY SERVICES TASK ORDER, UNDER EXISTING IDIQ, TO RESTORE AND RE-ESTABLISH SURVEY BOUNDARIES DAMAGED OR DESTROYED BY THE 2024 RAIL RIDGE FIRE. THIS PROJECT IS LOCATED IN THE OCHOCO NATIONAL FOREST I
ARCHITECT AND ENGINEER SERVICES FOR AERIAL SURVEY ORTHO AND LIDAR BIG BEND SECTOR
THIS REQUIREMENT IS FOR A NEW FIRM-FIXED PRICE ARCHITECT-ENGINEER (A-E) SERVICES TASK FOR 2026 OR957 BOUNDARY SURVEYING AND POSTING DIXIE-DAIRY-ROSCOE IN WASHINGTON AND MULTNOMAH COUNTIES, OREGON
FY26 - CARTOGRAPHY TECH BPA OC535
THREE AIM GIS DATA TECHNICIANS BASE YEAR
BLANKET PURCHASE AGREEMENT (BPA) FOR BUREAU OF LAND MANAGEMENT (BLM) FOR ONE (1) GIS SPECIALIST AQUATICS
CARTOGRAPHRY TECH
TO PROCURE PROFESSIONAL LAND SURVEYING SERVICES TO SURVEY, MARK & POST/MAINTAIN 11 MILES OF NATIONAL FOREST BOUNDARIES AS WELL AS SEARCH, CONTROL AND MAINTAIN 92 CORNER MONUMENTS AS SHOWN ON THE PROJECT EXHIBITS. ALL WORK IS TO BE COMPLETED IN AC
UPGRADE CURRENT AND FUTURE VBAT OPERATIONS WITH EXTRA SENSOR CAPABILITY.
THE A-E SHALL PROVIDE ENGINEERING SUPPORT FOR THE DESIGN OF THE REPAIR AND REPLACEMENT OF WATER LINES AT TRIPLER ARMY MEDICAL CENTER, OAHU, HAWAII.
HIF BOUNDARY SURVEY
THIS A-E TASK ORDER IS TO PROVIDE ENGINEERING SUPPORT FOR THE DESIGN OF THE REPAIR AND REPLACEMENT OF WATER LINES AT TRIPLER ARMY MEDICAL CENTER, OAHU, HAWAII
CMP, CNT2, SURVEYS CONSTRUCTION (F)
BOUNDARY SURVEY
WESTERN MINES LIDAR SURVEY
ARCHITECT AND ENGINEER SERVICES FOR PROPERTY BOUNDARY DETERMINATION GROUP A DRT-1 AND DRT-2, MAVERICK COUNTY, TEXAS
BAR BURDOIN AND ROWENA BOUNDARY LINE MAINTENANCE - BOUNDARY SERVICES TASK ORDER UNDER R6 A-E BOUNDARY SURVEY SERVICES IDIQ, TO MAINTAIN AND POST BOUNDARY LINES AND CORNERS ASSOCIATED WITH THE COLUMBIA RIVER GORGE NATIONAL SCENIC AREA. (KLICKITAT COUN
ARCHITECT AND ENGINEER SERVICES FOR PROPERTY BOUNDARY DETERMINATION GROUP A BBF PLUS, WEBB COUNTY, TEXAS
PHOTOGRAMMETRIC & MAPPING A&E SVC
NOS/OCS/HSD HYDROGRAPHIC SURVEY SERVICES IN ACCORDANCE WITH THE HYDROGRAPHIC SURVEY ACT IN THUNDER BAY NATIONAL MARINE SANCTUARY (TBNMS)
THE CONTRACTOR SHALL CREATE HIGH RESOLUTION LAND COVER DATA FOR THE TIJUANA RIVER NATIONAL ESTUARINE RESEARCH RESERVE (NERR) WATERSHED, APPROVED VIA OR-FY26-03939, IN ACCORDANCE WITH THE SOW AND DTL IN SUPPORT OF THE OCM.
ISR SERVICES AT OIR LOT 4 SITES 8 AND 9 TO INCLUDE ISR LAND-BASED FAMILIARIZATION TRAINING, ISR LAND-BASED MISSION COORDINATOR, SITE SURVEY, PRE-DEPLOYMENT, DEPLOYMENT, AND POST-DEPLOYMENT SUPPORT FOR UP TO 36 MONTHS (BASE AND THREE OPTION PERIODS).
MINIMUM GUARANTEE
EASTSIDE FOREST HEALTH BOUNDARY LINE SURVEY 2026 - BOUNDARY SERVICES TASK ORDER, R6 A-E BOUNDARY SURVEY SERVICES IDIQ, TO MARK AND POST BOUNDARY LINES AND CORNERS ASSOCIATED WITH THE COLUMBIA RIVER GORGE NATIONAL SCENIC AREA (0622) EASTSIDE FOREST HE
SUGAR LOAF - RAIL RIDGE CADASTRAL SURVEY - BOUNDARY SERVICES TASK ORDER, UNDER EXISTING IDIQ, TO MAINTAIN, MARK AND POST BOUNDARY LINES AND CORNERS ASSOCIATED WITH THE OCHOCO NATIONAL FOREST
DARLENE CADASTRAL SURVEY, BOUNDARY SERVICES TASK ORDER, UNDER EXISTING IDIQ, TO MAINTAIN, MARK AND POST BOUNDARY LINES AND CORNERS ASSOCIATED WITH THE DESCHUTES NATIONAL FOREST (0601) DARLENE FIRE REHAB PROJECT LOCATED ON THE CRESCENT RANGER DISTRICT
See your codes' radar every morning.
Subscribers get this same radar filtered to their exact NAICS codes in the daily digest — plus every new open bid that matches. Start your 14-day trial →