Contracts expiring soon — NAICS 481212 · Nonscheduled Chartered Freight Air Transportation
When a federal contract hits its end date, the agency usually buys the same thing again — and the rebid is open to anyone. These are the Nonscheduled Chartered Freight Air Transportation contracts coming up for renewal, soonest first.
128 contracts on the radar — page 3 of 3
FINALIZE THE MISSION DESIGN, EXECUTE LONG LEAD PROCUREMENTS TO SUPPORT THE AGGRESSIVE SCHEDULE, AND DELIVER ALL BASE MILESTONES AND PRODUCTS.
FINALIZE THE MISSION DESIGN, EXECUTE LONG LEAD PROCUREMENTS TO SUPPORT THE AGGRESSIVE SCHEDULE, AND DELIVER ALL BASE MILESTONES AND PRODUCTS.
FLIGHT AND PAYLOAD INTEGRATION SERVICES FOR THE T0251 IN-SPACE COATING DEVELOPMENT UTILIZING ATOMIC LAYER DEPOSITION (ALD) REQUIREMENT
COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS)
VOLATILES INVESTIGATING POLAR EXPLORATION ROVER (VIPER) DELIVERY
NATIONAL SECURITY SPACE LAUNCH PHASE 3 LANE 1
COMMERCIAL LUNAR PAYLOAD SERVICES (CLPS) TASK ORDER CS-3
PROVIDE 24 HOURS/365 DAYS AIR READINESS, AIR CARGO TRANSPORTATION TO TRANSPORT SNS ASSETS WITHIN THE PACIFIC OCEAN AREA, PACIFIC RIM ISLANDS, AND OTHER U.S. INTERESTS WITHIN THE PACIFIC OCEAN AREA. AIR CARGO TRANSPORTATION SERVICES SUPPORT INCLUDES
NATIONAL SECURITY SPACE LAUNCH (NSSL) PHASE 3 LANE 2 LAUNCH SERVICES
CALL WHEN NEEDED HELICOPTER FLIGHT SERVICES IN SUPPORT OF THE DEPARTMENT OF THE INTERIOR/NATIONAL PARK SERVICE AT OLYMPIC NATIONAL PARK, WA
KALA GENERAL AIR FREIGHT SERVICES
NATIONAL SECURITY SPACE LAUNCH PHASE 2
VA VENTURES DRONE DELIVERY SERVICE
NATIONAL SECURITY SPACE LAUNCH PHASE 2
FLIGHT AND PAYLOAD INTEGRATION SERVICES FOR 60 STUDENT PAYLOADS IN SUPPORT OF THE FLIGHT OPPORTUNITIES TECHRISE STUDENT CHALLENGE 2026-2027
CLPS TASK ORDER CP-11 CLPS PAYLOADS AND RESEARCH INVESTIGATIONS ON THE SURFACE OF THE MOON
FLIGHT AND PAYLOAD INTERGRATION SERVICES FOR T0437 DEMONS (DEPLOYABLE MEMBRANE OPTICAL COMMUNICATION SYSTEM) SUBORBITAL TECHNOLOGY DEMONSTRATION (DEMONS SUBORBITAL) PAYLOAD
PHASE 3 LANE 1 LAUNCH SERVICE TASK ORDER (LSTO) FOR SDA-3
NATIONAL SECURITY SPACE LAUNCH (NSSL) PHASE 3 LANE 2 LAUNCH SERVICES
PHASE 3 LANE 1 LAUNCH SERVICE TASK ORDER (LSTO) FOR SDA-4
NATIONAL SECURITY SPACE LAUNCH (NSSL) PHASE 3 LANE 2 LAUNCH SERVICES
NATIONAL SECURITY SPACE LAUNCH PHASE 2
PHASE 3 LANE 1 LAUNCH SERVICE TASK ORDER (LSTO) FOR NTO-4
PROPOSAL PREPARATION COSTS FOR PHASE 2 ADDITIONAL PRE-PRICED MISSION UNIQUE SERVICES PROPOSAL 23-10607
NATIONAL SECURITY SPACE LAUNCH PHASE 2
INTEGRATION AND FLIGHT OF THE T0428 JUNO ROTATING DETONATION ROCKET ENGINE
INTEGRATION AND FLIGHT OF THE T0426 COMMERCIAL ORBITAL SYSTEM FOR MICROGRAVITY IN-SPACE CRYSTALLIZATION (COSMIC) PAYLOAD.
MINIMUM GUARANTEED
← PrevPage 3 / 3
See your codes' radar every morning.
Subscribers get this same radar filtered to their exact NAICS codes in the daily digest — plus every new open bid that matches. Start your 14-day trial →