Contracts expiring soon — NAICS 238210 · Electrical Contractors and Other Wiring Installation Contractors
When a federal contract hits its end date, the agency usually buys the same thing again — and the rebid is open to anyone. These are the Electrical Contractors and Other Wiring Installation Contractors contracts coming up for renewal, soonest first.
830 contracts on the radar — page 7 of 17
PROJECT TITLE: OUTSIDE INFRASTRUCTURE FOR FORMER DOE BUILDING PROJECT LOCATION: KIRTLAND AFB
BASE YEAR
BPA CALL ORDER FOR INSTALLATIONS, DEINSTALLATIONS, AND REINSTALLATIONS OF TELEMATICS EQUIPMENT
REPAIR WORK
ACQUISITION OF FEMALE ALBERGUE ELECTRICAL RECONFIGURATION AND GENERATOR INSTALLATION PROJECT, PANAMA
CAMPUS ARC FLASH ASSESSMENT FOR 2026. THIS ASSESSMENT WILL BE TO REVIEW AND UPDATE THE 2022 ARC FLASH ASSESSMENT AND MAKE ANY NECESSARY CHANGES.
CAPE COD NATIONAL SEASHORE - BALANCE THREE PHASE POWER AT BIO LAB
MAINTENANCE, SUPPLIES, AND SERVICES SUPPORT FOR PHYSICAL ACCESS CONTROL SYSTEM, INTRUSION DETECTION SYSTEM, AND CCTV
REFER TO SECTION J FOR THE STATEMENT OF WORK, DRAWINGS, SPECIFICATIONS, AND ALL OTHER SUPPORTING ATTACHMENTS.
USM-SF FIRE SPRINKLER INSPECTIONS
TASK ORDER UNDER KIK IDIQ 693JJ322D000009 FOR ITS UPGRADES IN FHWA ATLANTA. THIS ORDER IS A RESULT OF KIK TECHNOLOGIES' QUOTE #RFTO K0421 AND AWARDS $417,972.16 FOR A POP OF 8/26/24 TO 4/25/25.
MANCHESTER BUILDING (PORT ORCHARD, WA) AUTOMATION AND SEAWATER MONITORING SYSTEM
THIS UNILATERAL AWARD IS FOR THE CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT COOPERSVILLE, MI (CPV) ARSR WHICH INCLUDES A FULL POWER SYSTEMS STUDY OF THE FACILITY. JCN: 21000077
B5280 REPLACE TRANSFER SWITCH
CRITICAL POWER DISTRIBUTION SYSTEM (CPDS) INSTALLATION AT SAN JAUN, PR (ZSU) CERAP ARTCC
EG FUNDED. EG SITE SURVEY TRAVEL, REPORT AND DESIGN FUNDING FOR OMAHA, NE (EDI) ALS JCN: 236045
TO-05 SECURITY SYSTEMS EQUIPMENT UPGRADES
FIRE ALARM SYSTEM - MAINT & TESTING
CONSTRUCTION COST OF THE UPS AND UPS ANCILLARY EQUIPMENT REMOVAL AND INSTALLATION AT CLEVELAND, OH (CLEA) ASR WHICH INCLUDES A FULL POWER SYSTEMS STUDY OF THE FACILITY. JCN: 21002951
PENDLETON BEND/WILBUR D MILLS
MC DEAN WILL SUPPLY THE MATERIALS, LABOR, AND EQUIPMENT NECESSARY TO INSTALL TWO CRITICAL POWER PANELS AND TWO GOVERNMENT-FURNISHED EQUIPMENT (GFE) STATIC AUTOMATIC TRANSFER SWITCHES, IN ACCORDANCE WITH THE ZLA ARTCC STATEMENT OF WORK (SOW) FOR THE Z
PREVENTIVE MANITEANCE SERVICES FOR BAS
REPLACE TU DISTRICT FENCE AND GATE
GENERATOR AND ATS
NON PERSONAL SERVICES TASK ORDER TO PROVIDE THE BUREAU OF COUNTERTERRORISM CT SUPPORT SERVICES THAT SHALL SUPPORT THE BUREAU OF COUNTERTERRORISM.
INSTALLATION SERVICES FOR SECURITY CAMERAS
CABLE DROPS INSTALLATION SERVICES- BPA CALL/ORDER PERIOD 1
THIS REQUIREMENT IS FOR THE BUILDING MANAGEMENT SYSTEM (BMS) MIGRATION INSTALLATION LOCATED AT THE ICE FACILITY IN BATAVIA, NY.
CABLE TV AND WI-FI SERVICES AND MAINTENANCE CONTRACT
MAINTENANCE
NYH ELECTRICAL SYSTEM ITM
EATON CONTROLS MAINTENANCE RE-ACQUISITION
UNIVERSAL POWER SUPPLY
C115789 - BLDG 101, F MODULE, INTEGRATED PHYSIOLOGICAL INITIATIVE SUITE - DATA CABLE INSTALLATION
8511885018!INSTALLATION OF CABLE FOR TV
FREESTATE TASK ORDER - PHASE 4
REPLACE VIVARIUM LIGHTING CONTROLS
SEE RFP AND STATEMENT OF WORK ATTACHED.
THIS REQUIREMENT IS FOR THE TRAFFIC SIGNAL PREVENTIVE MAINTENANCE AND EMERGENCY REPAIR CONTRACT AT ABERDEEN PROVING GROUND, MARYLAND.
IIJA FUNDS. EG INSTALL, FULL POWER SYSTEM STUDY AND ERMS FUNDING AT CHELSEA, OK (QAF) ATCBI JCN:23007870
PROVIDE SEMI-ANNUAL PREVENTIVE MAINTENANCE, EMERGENCY REPAIR SERVICES, ANNUAL ADVANTAGE EXTENDED SERVICE COVERAGE CERTIFICATION INSPECTION, LOAD BANK TESTING, BATTERY REPLACEMENT, CONSUMABLE PARTS REPLACEMENT, AND FLUID SAMPLING AND TESTING SERVICES
REPLACE WALL HUNG FANS B1600
THE CONTRACTOR SHALL PROVIDE ALL SUPERVISION, MATERIAL, LABOR, PARTS AND EQUIPMENT NECESSARY, IN SUPPORT OF A PROJECT TO REPLACE WAVE-OFF LIGHT FIXTURES ON THE AIRFIELD @ MCAS MIRAMAR, SAN DIEGO, CA.
DOT CCTV CABLING AND ELECTRICAL LABOR (DOTHQ)
ELECTRICAL UPGRADE
BLDG. 12 PUMP POWER
LORAN TOWER LIGHT MONITORING SERVICES AT MULTIPLE USCG LORAN-C TOWER SITES NATIONWIDE
BRIDGE-FIRE ALARM MAINTENANCE
THE PURPOSE OF THIS PR IS TO BUILD0OUT THE IT INFRASTRUCTURE FOR FAA OFFICES ON THE 7TH AND 8TH FLOORS FOR THE MOVE TO THE DOT HEADQUARTERS EAST BUILDING. THIS PR OUTLINES FAA'S REQUEST TO HAVE KIK TECHNOLOGIES PROCURE AND INSTALL CABLE INFRASTR
THE PURPOSE OF THIS NEW TASK ORDER IS FOR THE RENEWAL COVERAGE OF TMETRICS. THIS AMENDMENT ADDS ADDITIONAL FUNDS BASED OFF THE APPROVED QUOTE RECEIVED. TMETRICS APPLICATION PLATFORM SUPPORTS CONTACT CENTER SYSTEM AND PROVIDES MAINTENANCE, HARDWARE
See your codes' radar every morning.
Subscribers get this same radar filtered to their exact NAICS codes in the daily digest — plus every new open bid that matches. Start your 14-day trial →