Contracts expiring soon — NAICS 237310 · Highway, Street, and Bridge Construction
When a federal contract hits its end date, the agency usually buys the same thing again — and the rebid is open to anyone. These are the Highway, Street, and Bridge Construction contracts coming up for renewal, soonest first.
814 contracts on the radar — page 6 of 17
DEMOLITION AND DISPOSAL OF EXISTING PAVEMENT. RE-PAVING AND STRIPING OF PARKING AREA AND ASSOCIATED WORK.
POST HURRICANE HELENE ROAD REPAIRS TO PROVIDE FOR SAFE COMMERCIAL TIMBER SALE ACCESS ACROSS THREE FOREST SERVICE SYSTEM ROADS LOCATED ON THE NANTAHALA RANGER DISTRICT, OF THE NANTAHALA NATIONAL FOREST, OF THE NATIONAL FOREST'S IN NORTH CAROLINA.
ROAD REPAIR AND REHABILITATION ON THE PISGAH RANGER DISTRICT
REPAIR AND REHABILITATION OF ROADS ON THE GRANDFATHER RANGER DISTRICT.
THE PURPOSE OF THIS PROJECT IS TO REPAIR THE ASPHALT PARKING LOT PB29000. WORK WILL CONSIST OF A FULL DEPTH REPAIR WITH LIME STABILIZATION, STRIPING, SIDEWALK REPLACEMENT, AND CURB REPLACEMENT.
ATL ARSR GRAVEL INSTALLATION & BLDG. IMPROVEMENTS
REHABILITATION WORK IS ASSOCIATED WITH THE REY AND THOMAS FIRE. WORK TO INCLUDE PAVING A ROAD AND PAVING PARKING LOTS TO RESTORE THEM TO DESIRED CONDITIONS. RESTORATION FUNDS (RIRI) TO BE USED FOR THE REPAIRS.
0304 Q2 CON ENG FSR 516 AND 618 GUARDRAIL NEW OUT
FY26-008289 1171945 114 STREAM CROSSING, MP 7.1 RECONSTRUCT MULTIPLE SECTIONS OF NFSRS 114 AND 132. RECONSTRUCT NFSR 114 STREAM CROSSING AT MP 7.1 TO MEET AOP REQUIREMENTS. THIS PROJECT WILL REPAIR MULTIPLE SECTIONS OF NATIONAL FOREST DEVELOPMENT RO
PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RAILING REP
PROJECT PR ER DOT PRMNT RPR(21) THE PROJECT CONSISTS OF REPAIRING LANDSLIDE AND WASHOUT DAMAGES CAUSED BY HURRICANES IRMA AND MARIA ON PR-128 HWY-133 (KM. 51.3), HWY-134 (KM. 51.63), HWY-135 (KM. 51.71), HWY-136 (KM. 51.77), HWY-137 (KM. 51.83), AND
REPAVE PALM CIRCLE SECTION 01 FORT SHAFTER
PAVING SCHOFIELD BARRACKS LOCATION: MATTHEWS AVENUE
SUF-MAUDE LAKE EROSION CONTROL
EMERGENCY REPAIRS TO THE DAM SLOPE, PRINCIPAL SPILLWAY, TOE DRAIN AND DRAWDOWN STRUCTURE.
REPAIR NORTH PARKING LOTS NEAR BUILDING 120 AND 150
1158405 ROAD 149 080901 SO CON AR2022-1-FS ROAD 149 AOP 698087 RPT FY26-016802 THIS PROJECT WILL REPAIR MULTIPLE SECTIONS OF NATIONAL FOREST DEVELOPMENT ROAD 149 ON THE ODEN RANGER DISTRICT. THE ROADWAY WAS SEVERELY DAMAGED IN 2022 BY A HEAVY RAINS
FY26-008300 080901 SO CON AR2022-1-FS ROAD 51 729402
FY26-008352 AR2023-1-FS ROAD 6035 REPAIR
DORR RUN OHV TRAIL SYSTEM ON THE ATHENS RANGER DISTRICT
ANNUAL HIGHWAY MAINTENANCE - MORA
CLIN 0002 - OPTION 1 FABRIC SHELTER
PROJECT NP NATR BMS FY25(1) & NP NATR BMS FY26(1) THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE MAINTENANCE REPAIRS ON 17 BRIDGES ON THE NATCHEZ TRACE PARKWAY. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, CRACK CLEANING AND
ROAD REPAIR AND REHABILITATION ON THE APPALACHIAN RANGER DISTRICT
1171945 RECONSTRUCT MULTIPLE SECTIONS OF NFSRS 114 AND 132. RECONSTRUCT NFSR 114 STREAM CROSSING AT MP 7.1 TO MEET AOP REQUIREMENTS. THIS PROJECT WILL REPAIR MULTIPLE SECTIONS OF NATIONAL FOREST DEVELOPMENT ROADS 114, 132 AND RECONSTRUCT A STREAM CRO
1158639 ROAD 147-2.7 AND 4.7 RPT FY26-016803
WEEKS BROOK BRIDGE RAILING REPAIR, FRANKLIN FALLS DAM, SANBORNTON, NH
THE PURPOSE OF THIS ACTION IS TO REPLACE ACTIVE VEHICLE BARRIER (AVBS) SYSTEMS AT HENRY GATE ACCESS CONTROL POINT (ACP), LOCATED ON HENRY DRIVE AT FT RILEY, KANSAS.
ROAD MAINTENANCE SERVICES FOR THE TOMBIGBEE RANGER DISTRICT
REPAIR TAXILANE, FOXTROT
WON 1615342 -- HI422M REPAIR HELO PARKING AREA (ASPHALT PAVEMENT) SOUTHEAST OF H101, MARINE CORPS BASE HAWAII (MCBH), KANEOHE BAY HAWAII
THE CONTRACTOR SHALL DESIGN AND BUILD THE HELIPAD AT MARI NAVAL BASE IN CYPRUS AS OUTLINED IN THE PERFORMANCE TECHNICAL STATEMENT.
ACTIVE MANAGEMENT ROAD MAINTENANCE FOR THE MISSISSIPPI BLUFFS RANGER DISTRICT. WORK WILL INCLUDE BLADING AND SHAPING THE ROADWAY AND PLACEMENT OF AGGREGATE SURFACING.
ACTIVE MANAGEMENT ROAD MAINTENANCE FOR THE MISSISSIPPI BLUFFS RANGER DISTRICT. WORK WILL INCLUDE BLADING AND SHAPING THE ROADWAY AND PLACEMENT OF AGGREGATE SURFACING.
ACTIVE MANAGEMENT ROAD MAINTENANCE FOR THE HIDDEN SPRINGS RANGER DISTRICT. WORK WILL INCLUDE BLADING AND SHAPING THE ROADWAY AND PLACEMENT OF AGGREGATE SURFACING.
FORT SAM HOUSTON NATIONAL CEMETERY PHASE 3 EXPANSION & IMPROVEMENTS ADDITIONAL ROAD REPAIRS
THE DEPARTMENT OF THE INTERIOR, NATIONAL PARK SERVICE (NPS) AT WHISKEYTOWN NATIONAL RECREATION AREA (WHIS) HAS A REQUIREMENT FOR ROAD STRIPING. THE PROJECT IS LOCATED AT WHISKEYTOWN NATIONAL RECREATION AREA, SHASTA COUNTY, CALIFORNIA.
PAVEMENT CRACK REPAIR AND SEAL COATING, THOMASTON DAM, THOMASTON, CT
PROJECT DC NP ROCR 503(1), 24(2) THE PROJECT CONSISTS OF ROADWAY REPAIRS ON WATERSIDE DRIVE FROM THE SOUTHERN INTERSECTION WITH ROCK CREEK AND POTOMAC PARKWAY TO MASSACHUSETTS AVENUE NW, AND PINEY BRANCH PARKWAY FROM ARKANSAS AVENUE TO BEACH DRIVE
B843 STAIR AND RAMP REPAIR. TO UNDER HAFB PAVING IDIQ CONTRACT, FA820123D0005. CONTRACTOR SHALL FURNISH ALL MATERIALS, LABOR, TOOLS, EQUIPMENT, TRANSPORTATION, MANAGEMENT, OTHER SERVICES, ETC. NECESSARY FOR SUCCESSFUL COMPLETION OF REQUIREMENTS.
ROADWAY REPAIRS ON PERIMETER ROAD (MCCONVILLE ROAD). REPAIRS ALSO INCLUDE DRAINAGE, SIGNAGE, STRIPING AND PEDESTRIAN FACILITIES.
CURRENT LOW WATER CROSSING FAILED TO SUPPORT PASSAGE OF GROUNDS EQUIPMENT DUE TO APPARENT STRUCTURAL DEGRADATION AND POSSIBLE SOIL INSTABILITY. REPAIR/REPLACEMENT NEEDED.
MAF ASPHALT
566956 LVN REPAIR BURGER KING AND SHOPPETTE PARKING AREAS
MILL AND OVERLAY B706 MILL AND OVERLAY STRATEGIC RD RECONSTRUCT SIJAN AVE MILL AND OVERLAY B1552 REPAIR RUNNING TRAIL, IKE
TRAFFIC LIGHT
FY26-008360 ROADS C004, AND C006 RECONSTRUCTION UTILIZING THE OUACHITA ROAD CONSTRUCTION MATOC. THIS TASK ORDER INCORPORATES THE MANDATORY CONTRACT CLAUSE FAR 52.222-90, ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS, AS REQUIRED BY EXECUTIVE
STEEL TOWER ROAD CULVERT REPAIR
PROJECT NC ERFO FS NFNC811 2020-1(1): THE PROJECT CONSISTS OF THE REPAIR OF A FILL SLOPE FAILURE ON TUNI GAP ROAD (RTE 440). THE WORK INCLUDES GRADING, DRAINAGE, GEOFOAM LIGHTWEIGHT FILL EMBANKMENT, AGGREGATE SURFACE COURSE, AND OTHER MISCELLANEOU
081000 FOREST-CON-CULVERT REPLACEMENT/DRIVER CREEK ERFO 730176
See your codes' radar every morning.
Subscribers get this same radar filtered to their exact NAICS codes in the daily digest — plus every new open bid that matches. Start your 14-day trial →