Contracts expiring soon — NAICS 237130 · Power and Communication Line and Related Structures Construction
When a federal contract hits its end date, the agency usually buys the same thing again — and the rebid is open to anyone. These are the Power and Communication Line and Related Structures Construction contracts coming up for renewal, soonest first.
228 contracts on the radar — page 4 of 5
REHABILITATE UNSAFE AND FAILING ELECTRICAL SYSTEM FOR SETTLEMENT, KALAUPAPA NATIONAL HISTORICAL PARK, KALA-217676
WINSLOW, AZ - (INW) RCAG TOWER REPLACEMENT IN WINSLOW, AZ IN ACCORDANCE WITH THE SOW AND DRAWINGS.
TOWER SITE WORK
DESIGN AND CONSTRUCTION OF NEC PERMANENT POWER INFRASTRUCTURE AT U.S. EMBASSY BRASILIA, BRAZIL.
FAIRBANKS GUYED ANTENNA TOWER INSPECTION
PUERTO RICO - QSH RCAG (EL YUNQUE, PR) AND SJU ASR (SAN JUAN, PR) TOWER REPLACEMENT PROJECTS IN ACCORDANCE WITH THE SOW AND DRAWINGS.
PO FOR BASE PLUS FOUR OPTION YEARS SITE LEASE AT ROUNDTOP MTN., WITH BASE YEAR FULLY FUNDED. INCLUDE THE FOLLOWING ON PO: THIS IS A BASE PLUS FOUR OPTION PERIOD SITE LEASE AND UTILITIES WITH AMERICAN TOWERS, LLC AT SITE #8241 (ROUNDTOP T2)
PORTLAND, ME - (PWM) RTR COMMUNICATIONS FACILITY & ANTENNA REPLACEMENT IN PORTLAND, ME IN ACCORDANCE WITH THE SOW AND DRAWINGS.
CHAIN-LINK SNOW GATES - CARRINGTON, EDGELEY, AND JAMESTOWN SUBSTATIONS
70-FT MONOPOLE FOUNDATION, HURON MAINTENANCE FACILITY, SD
FARGO SUBSTATION - 69KV BUS FOUNDATION REMOVALS AND REPLACEMENTS AND ROLLING GATE ADDITION, NORTH DAKOTA
EROSION DITCH REPAIRS AND BARBED WIRE FENCE - WESSINGTON SPRINGS SWITCHING STATION, SD
PWCL0132 MAINSITE REPAIR AND REPLACE POWER FOR FH CKT30
LUBBOCK, TX - RTRB & RTRC TOWER REPLACEMENTS AT LUBB CSA IN LUBBOCK, TX IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
WICHITA, KS - ICTD RTR TOWER REPLACEMENTS (4 TOWERS) AT ICTD IN WICHITA, KS IN ACCORDANCE WITH THE SPECIFICATIONS AND DRAWINGS.
DESIGN AND DESIGN DEVELOPMENT OF MULTI-SITE PHOTOVOLTAIC (PV) AND BATTERY ENERGY STORAGE SYSTEM (BESS) PROJECTS
REQUIREMENTS FOR ANALYSIS, DESIGN, PROCUREMENT, AND CONSTRUCTION OF ONE NEW 40 FOOT SELF-SUPPORTING WITH FOUNDATIONS COMMUNICATION ANTENNA TOWER AND REPLACEMENT OF EXISTING 40 FOOT SELF-SUPPORTING TOWER AND ASSOCIATED WORK
NIST RADIO TOWER INSPECTION, MAINTENANCE, REPAIR AND MODIFICATION
ONEIDA COMMUNICATIONS INC:1108330 [26-002066]
REPAIR WALL AND REPLACE ROOFING, SIDING, AND HVAC, SERVICE BUILDING, BONESTEEL SUBSTATION, SD
MIDLAND REPEATER - EROSION AND FENCE REPAIR PROJECT, SOUTH DAKOTA
SIDNEY SUBSTATION BREAKER REPLACEMENT; SD566 SD662 SD862 BREAKER REPLACEMENTS: DEMOLITION AND SITE DEVELOPMENT, FOUNDATIONS AND PLATFORMS FOR SUBSTATION ELECTRICAL EQUIPMENT, INSTALLATION OF THREE (3) GOVERNMENT-FURNISHED POWER CIRCUIT BREAKERS, INST
REPLACE RESCUE 21 COMMUNICATIONS TOWER IN SAIPAN
TRACY BACKUP GENERATORS CIRCUIT #2 & #3
NATIONWIDE ANTENNA PREVENTIVE MAINTENANCE
TASK ORDER 1 FOR IDIQ NUMBER 1305M226D0041
TITLE: FY27, STVP, WALLEN,$26,850.00, TUCMTNTOWER REQUESTOR: MICHAEL C CROSS AFT#: 2027-ST-0023 POP DATES: 10/15/2026 TO 09/30/2027
ALCOVA-BOYSEN THERMOPOLIS-WORLAND TAP OPGW
ALCOVA-NORTH CODY BREAKER FOUNDATIONS REPLACEMENT
ANTENNA SUPPORT TOWER
42A-01172-0P,REPL 20KV LINE RG204/15-16, GRAFENWOEHR
REPLACE EXISTING FIBER LOOP 1 (FOTS) AT MSP AIRPORT IN MINNEAPOLIS, MN
BERESFORD SUBSTATION, STAGE 11, SOUTH DAKOTA
FY24 CALICO PEAK LEASE BASE PLUS FOUR OPTION YEARS
ATC LEASING EQUIPMENT
REQUIREMENT: THE CONTRACTOR MUST DEMOLISH ALL OLD TOWERS, INCLUDING FOUNDATIONS AND OLD THREE (4) ANTENNA TOWERS.
NORTH CODY MOI 954 SWITCH REPLACEMENT - WESTERN AREA POWER ADMINISTRATION (WAPA) ROCKY MOUNTAIN REGION HAS A REQUIREMENT WITH THE PRINCIPLAL COMPONENTS OF WORK TO INCLUDE REPLACING ONE (1) 115-KV, 1200-AMP MOTOR-OPERATED INTERRUPTER (ALSO REFERRED TO
REPAIR FIRE ALARM SYSTEM, GRAFENWOEHR
CAMP BUEHRING MICROGRID
PA5 E-2D ELECTRICAL INFRASTRUCTURE IN ACCORDANCE WITH THE ATTACHED SCOPE OF WORK (PARTS 2-6) AND WAGE DETERMINATION IN SECTION J.
INSTALL EMERGENCY GENERATOR AT MORELL OPERATIONS CENTER, CAPE CANAVERAL SPACE FORCE STATION, FL
REBUILD OF THE LIBERTY TO VAN BUREN PORTION OF SOUTHWESTERNS VAN BUREN TO WELEETKA 161KV TRANSMISSION LINE
DBB CONSTRUCTION AND REPAIRS SUBSTATION A AT JMTC ROCK ISLAND ARSENAL, IL
SAN ANTONIO, TX - SATA/SAT (SAN ANTONIO) RCAG BUILDING REFURBISHMENT PROJECT AND FULL SITE DEMOLITION IN ACCORDANCE WITH THE SOW AND DRAWINGS.
VOYA 306890 - KETTLE FALLS POR DESIGN BU
X001 DB CONSTRUCTION - MACC TO (CS: ARON KO: GENE) P-1301 MICROG
FCI EL RENO - REMOVE AND REPLACE EXISTING TRANSFORMERS - PROJECT 26Z5AX6 - EO 14398
TASK ORDER ON OUTSIDE CABLE PLANT IDIQ - PROVIDE FIBER OPTIC AND COPPER TELECOMMUNICATIONS CABLE CONNECTIVITY TO GATES 5 AND 15 (WO 4320), BRIDGE 4 (WO 4328).
RAMEY ARC MICROGRID ERCIP
REVITALIZE POWER SYSTEMS AT THE VEHICLE ASSEMBLY BUILDING (VAB) TOWER C
See your codes' radar every morning.
Subscribers get this same radar filtered to their exact NAICS codes in the daily digest — plus every new open bid that matches. Start your 14-day trial →