Department of Agriculture — Procurement Forecast
What Department of Agriculture plans to buy, in its own published words — anticipated contract actions with estimated values and timelines, mirrored live from the agency's public forecast. Planning-grade data; entries can be revised or cancelled.
The general picture
What they plan to buy — top trades
Which offices are planning
When they expect to award
How far along each plan is
Every planned action, soonest first
(AP-FNS-0108) OM SNAP Policy Wiki (SPW) ToolAwarded
(AP-FNS-0108) OM SNAP Policy Wiki (SPW) Tool. The United States Department of Agriculture (USDA) Food Nutrition and Consumer Services (FNCS) Food and Nutrition Service (FNS) Office of Information Technology (OIT) seeks to procure IT support for the operations and maintenance (OM) of the Supplemental…
FY26 GSDGAMB Remedy Support ServicesAwarded
Item Description GSD/GAMB Remedy Support Services POP 8/1/2022 - 08/31/2026 (current contract is expiring and up for compete this year These support services will ensure that OCIO CEC Enterprise Application systems supported by OCIO CEC GSD GAMB are up to date through the careful deployment of new s…
URGENT Contract expires 4-30-26 OPERATIONS AND MAINTENANCE SUPPORT SERVICES AT THE SOUTH ATLANTIC AREA RESEARCH FACILITIES U.S. HORTICULTURAL RESEARCH LABORATORY Fort Pierce Florida IAS REQ 1164687 12405B22D0002Awarded
The Contractor shall provide all labor supervision equipment and materials except those specified as Government- furnished to provide facility operations maintenance administrative security energy conservation programs and safety support services to the USDA ARS SEA locations. Operations and mainten…
This RPT2.0 report was previously approved. Contracting Guard Service for Ames USDA End User Shawn Murphy Co Conner Tees.Awarded
This RPT2.0 report was previously approved. Contracting Guard Service for Ames USDA End User Shawn Murphy Co Conner Tees.
LMPRS MARS help desk operations and maintenance support services 5 months extensionAwarded
IT AND TELECOM - END USER AS A SERVICE CONFERENCING AV HELPDESK DESKSIDE SUPPORT WORKSPACE PRINTERS COLLABORATION AND PRODUCTIVITY TOOLS
GISB Program Analyst TestingAwarded
Contractor support for Government Employees Services Division Government Insurance Services Branch to assist with quality assurance testing (QAT) customer user acceptance testing (CUAT) and training.
FY26 End Of Life Computer Replacement for NCAH Description Purchasing a mixture of laptops desktops andor tablets to meet the needs of the NCAH customers to replace computer hardware that has met the 5 year lifecycle per OMB M-16-02.Awarded
FY26 End Of Life Computer Replacement for NCAH Description Purchasing a mixture of laptops desktops and/or tablets to meet the needs of the NCAH customers to replace computer hardware that has met the 5 year lifecycle per OMB M-16-02.
Natural Resources Conservation Service Financial software migrationAwarded
Specialized Business Analysis and Financial Management Expertise (Financial Management Modernization Initiative ProTracts
The purpose of the award of NFC Data Archiving Storage Scanning is to provide an online web-based archive and retrieval system for line data feeds and legacy microfiche and microfilm.Awarded
NFC Data Archiving Storage Scanning -The scope of this contract is to provide full-service data archival storage and retrieval services including automated receipt and intake of line data feed reports scanning and indexing of paper documents and conversion of legacy microfiche and microfilm. All dig…
Biorepository Transfer Support - Ordering period 1 CLIN 1001 and CLIN 1002 POP extensionadditional fundsAwarded
Biorepository Transfer Support - Ordering period 1 CLIN 1001 and CLIN 1002 POP extension/additional funds. For BRT contract 12639524D0072 please modify existing Task Order 12639525F0772/P00001 for ordering period (9/1/25-8/31/26) for CLIN 1001 and CLIN 1002 to extend 2 months from JULY 1ST 2026 to A…
Fire Alarm InspectionAwarded
Fire Alarm Inspection The fire alarm systems will require service and annual inspections required per NFPA 72. The Inspection Technicians shall be NICET certified and confident at operating and repairing Simplex fire protection equipment. Contractor shall have required software and training to under…
Modification to 1232SA25F0456 BLDG 17 PENTHOUSE CHILLER REPLACEMENTAwarded
Modification to 1232SA25F0456 BLDG 17 PENTHOUSE CHILLER REPLACEMENT OF 2 2.5 INCH WELL WATER REGULATING VALVES
LANDSCAPING AND MAINTENANCE - CAMPUS WIDE - Salinas CAAwarded
LANDSCAPING AND MAINTENANCE - CAMPUS WIDE - Salinas CA
Task order to Guidehouse Digital LLC for INTEGRATION AND DEVELOPMENT SUPPORT SERVICES Funding for OY1 BARDAC0BDAwarded
SP2-FMA-Purchase IT Labor for FEMA Pivot OMBackground Information (NFIP) works through private insurance companies and the NFIP Direct a direct servicing agent to sell NFIP flood insurance policies to individuals and pay claims to individuals when a flood loss occurs. In order to sell and service po…
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CHEESE BLEND AMER SKM LVS-12/2 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CHEESE BLND AMER SKMYEL REGSLC LVS-6/5LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CHEESE PROCESS REG LVS-6/5 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CHEESE BLEND AMER SKM LVS-12/2 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CHEESE BLND AMER SKMYEL REGSLC LVS-6/5LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CHEESE PROCESS REG LVS-6/5 LB
Davidson River to Brevard Sewer Construction ProjectAwarded
This project will replace the existing Schenck Job Corps pump station and existing force main to connect The Davidson River Campground and Pisgah Ranger District facilities north of US 276 to the City of Brevard Wastewater Collection System. This infrastructure is failing and incurring significant s…
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
POTATO BULK FOR PROCESS FRZ
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
POTATO FOR PROCESS INTO DEHY PRD-BULK
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
SWEET POTATO BULK FRESH PROC
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CHEESE BLEND AMER SKM LVS-12/2 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CHEESE BLND AMER SKMYEL REGSLC LVS-6/5LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CHEESE PROCESS REG LVS-6/5 LB
USDA FAS Unified Data SolutionAwarded
Trade and Foreign Agriculture Affairs (TFAA) is looking to Modernize their business processes and move into the cloud. The work required is to review analyze architect and modernize FAS portfolio data from fragmented and duplicative to a unified cloud-based solution that supports analytics and futur…
Tonto National Forest North Zone Toilet PumpingEvaluation Stage
The intent of this FY26 contract is to provide vault toilet septic collection services for the North Zone of the Tonto National Forest including the Payson Ranger District Tonto Basin Ranger District Pleasant Valley Ranger District.
Tonto National Forest South Zone Toilet PumpingEvaluation Stage
The intent of this contract is to provide septic collection services for the North Zone of the Tonto National Forest including the Cave Creek Ranger District Globe Basin Ranger District Mesa Ranger District.
Upper Long Creek Heritage SurveyDrafting Solicitation
Heritage surveys of the Upper Long Creek Planning area to include Pedestrian Survey Site and Isolate Recordation Site Flagging and Survey Report Writing.
2026 Kern River Ranger District Office HVAC ReplacementDrafting Solicitation
The intent of this contract is to replace the existing failed Heating Ventilation and Air Conditioning System (HVAC) with a modern appropriately sized system capable of being serviced and maintained by local HVAC professionals for the Sequoia National Forest Kern River Ranger District Office buildin…
0813-DISASTER-Master Drainage plan - NFGTEvaluation Stage
Contract to have the National Forest and Grasslands in Texas identify all water sheds blue line crossings and culvert crossing for all districts.
0813-Heavy RM-Inspection ContractEvaluation Stage
To request services of contractor to supply inspectors for the National Forest and Grasslands in Texas to inspect the heavy maintenance contract on the Sam Houston Davy Crockett and Sabine National Forest.
Crowley Holdings-Remove and replace boilercooling towerreheat coils.Evaluation Stage
The equipment has exceeded its useful lifespan. It is deteriorating and experiencing structural failures which require ongoing maintenance to ensure it remains serviceable. Every component of the HVAC system is essential for the cotton classing facilitys core operations making reliable equipment cru…
GAOA Sequoia NF Toilet Installation ProjectDrafting Solicitation
This project involves the fabrication transportation and installation of pre-cast concrete vault toilet buildings. The project also involves removing old vault toilets. Contractor shall pump out clean and remove the existing vault and toilets.
USDA Tanium Licenses and SME Support RenewalAwarded
Renewal of existing Tanium Software licenses with incidental SME support for CPOC. This is a base plus one option year (OY). Prior award was an 8a direct award but this will be set aside for SDVOSB competition and as such qualify for automatic release from the 8a program.
GAOA Chilao Campground Complex Water System RehabilitationDrafting Solicitation
The contract will provide water line replacements for approx 4 miles of water system line and associated features within a high use campground area as well as a critical fire station. The contract will also provide for associated road repaving to damaged asphalt roads for first responder use as well…
Feasibility Study on Consolidating Wildland Fire Management OperationsDrafting Solicitation
Conduct a comprehensive and objective feasibility study evaluating the consolidation of federal wildland fire management functions as directed by Congressional appropriations language. The study shall assess operational financial organizational infrastructure and stakeholder impact of consolidating …
FNS Account Management Agent (AMA) software - Sterling Control Center and ConnectDirectCancelled
The procurement is for software required to run the Account Management Agent (AMA). The AMA application is migrating from Treasury Bureau of the Fiscal Service data center to USDA cloud hosting and this is one of four pieces of software required for the AMA to function.
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
PEACH FREESTONE DICED FRZ CUP-96/4.4 OZ
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
PEACHES FREESTONE SLICES FRZ CTN-12/2 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
PEACHES FREESTONE SLICES FRZ CTN-20 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
MIXED BERRY FRZ CUP-96/4.OZ
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
STRAWBERRIES WHOLE UNSWEETENED FRZ 12/1 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
STRAWBERRY FRZ CUP-96/4.5 OZ
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
STRAWBERRY SLICES FRZ CTN-30 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
STRAWBERRY SLICES UNSWT IQF CTN 6/5 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
STRAWBERRY WHOLE UNSWT IQF CTN-6/5 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
APRICOT HALVES CAN 24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
APRICOTS DICED FRZ CUP-96/4.5 OZ
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
APRICOTS DICED PEELED EX LT CAN 6/10
Idaho Panhandle Rappel Base FacilitiesEvaluation Stage
To purchase 2- 36x60 temporary modular buildings. 1 building being an office type building with a minimum of 5 offices a common area for additional desk space and 2 bathrooms. The other building being more of a multipurpose/training building with a small kitchen 2 bathrooms and an open common area. …
Audit remediation support for FMMIEvaluation Stage
Provide SAP level expertise to NRCS specific interfaces and conservation system development that will interface with the Financial System.
Durkee and Town Gulch post-fire recovery- range fence constructionDrafting Solicitation
About twenty miles of fire damaged fence clean up and disposal right of way clearing (fence-line preparation) and range fence re-construction (barbed- 3 to 4 wire) and about 3/4 mile of aspen buck and pole fence construction.
Khufu - Hybrid capture genotypingDrafting Solicitation
per 96-well plate. Includes DNA extraction Library prep enrichment pooling Sequencing and variant calling at the sample volume panel size and sequence coverage indicated in the quote header. Deliverables are 1. Genotype calls and imputation in hapmap and vcf format 2. Allele frequency calls
USDA C3ai (placed by OCP)Drafting Solicitation
The project aims to enhance FSISs riskbased decision-making by improving the usefulness of risk indicators through expanded context from unstructured data and real-time SME feedback. It seeks to deliver more targeted and actionable intervention recommendations to FSIS personnel by leveraging LLMdriv…
Professional Librarian Services IPDICSBCSU for National Agricultural LibraryAwarded
The contract will provide for two reference librarians for the Customer Service Unit. The staff will provide daily references service coverage for patron touchpoints including service desk chat service NALs online Ask-a-Question form email telephone calls and on-site researcher consultation as neede…
NBAF - Repair Wedge Barrier Actuator ComponentsAwarded
Provide all plant labor supervision materials tools equipment transportation and supervision necessary to get six (6) Global GRAB Technologies SW1900-E Electric Wedge Barrier back to a fully functioning state. Tasks include but are not limited to actuator and misc. parts replacement function testing…
0803 SO Gravel BPADrafting Solicitation
To establish Blanket Purchase Agreements for contractors that are technically capable with relevant experience within the past 3 years that involve delivering and spreading aggregate. Other criteria are realistic and reasonable prices The BPAs will be for the Chattahoochee Forest with a ordering per…
Monongahela National Forest Lake Sherwood Dam RepairsEvaluation Stage
Lake Sherwood dam gate rehabilitation. Currently the 24-inch diameter sluice gate and outlet controls are inoperable due to misalignment of the stem guide/support system including the waterline guide support and need to be repaired.
Archeological inventory and documentationDrafting Solicitation
A contract for archeological inventory of the Haycamp Mesa vegetation management project area comprising 27816 acres to comply with Section 106 of the National Historic Preservation Act. This contract requires the contractor to inventory the project area identify map and document archeological resou…
GAOA Mendenhall Glacier Deferred Maintenance Phase 1 - ConstructionAwarded
This is an FY25 requisition carryover due to the shutdown. IAS Requisition 1156559 was previously approved under FY25 NRE-3051 by COO SPE and DOGE on 8/14/25. We are at the award stage and requisition was amended to add additional funding. RPT entry was created 4/8/26 as an admin requirement to sati…
Operate and maintain water distribution systemsEvaluation Stage
Water Treatment Operator Contract to operate and maintain 5 MIOX systems.
M6 Road Slide Repair. Mendocino National Forest. Contract number 127EAW26P0008.Awarded
undertake the excavation of the current deteriorated road template and uphill slumps. the contractor must prepare a structural foundation for the repositioned roadway. The construction of the new structural base is to be completed with backfilling performed as necessary to achieve the sub-base level…
Airport Fire Suppression RepairEvaluation Stage
This project will perform road maintenance install drainage features and repair damage caused by Suppression efforts of the Airport fire.
GWJ Recreation Helene Recovery Supply ProcurementDrafting Solicitation
The purpose of this project is to streamline an acquisition plan to support recreation site restoration following Hurricane Helene. These minor site features/campground furniture/infrastructure (fire rings picnic tables etc.) are necessary for the operation of overnight sites and day use areas. The …
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CORN CREAM STYLE CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CORN CREAM STYLE CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CORN FRZ CTN 12/2.5 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CORN FRZ CTN-30 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CORN WHOLE KERNEL CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CORN WHOLE KERNEL CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CORN WHOLE KERNEL(LIQ) CAN-6/10
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
MIXED VEGETABLES FRZ CTN-6/5LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
PEAS CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
PEAS CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
PEAS CAN-6/10
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
PEAS GREEN FRZ 12/1 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
PEAS GREEN FRZ 12/1 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
PEAS GREEN FRZ CTN-12/2.5 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
PEAS GREEN FRZ CTN-30 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
POTATOES WHT SLICES CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
POTATOES WHT SLICES CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
TOMATO DICED CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
TOMATO DICED CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
TOMATO DICED CAN-6/10
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
VEG MIX CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
VEG MIX CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CARROTS DICED FRZ 12/1 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CARROTS DICED FRZ 12/1 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CARROTS DICED FRZ CTN-12/2 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CARROTS FRZ CTN-30 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CARROTS CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CARROTS CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CARROTS CAN-6/10
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
BEANS GREEN CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
BEANS GREEN CAN-24/300
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
BEANS GREEN CAN-6/10
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
BEANS GREEN FRZ CTN-12/2 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
BEANS GREEN FRZ CTN-30 LB
FNS Account Management Agent (AMA) software - WebSphereAwarded
The procurement is for software required to run the Account Management Agent (AMA). The AMA application is migrating from Treasury Bureau of the Fiscal Service data center to USDA cloud hosting and this is one of four pieces of software required for the AMA to function.
Project Package for York Chiller Replacement and BARC Cooling Tower Rebuild for Building 001Evaluation Stage
The work is needed to replace a York chiller that has lost efficiency has many refrigerant and oil leaks. The BAC Cooling towers are at a stage where they need a total rebuild. The roof mounted exhaust fan needs to be replaced and integrated with a newly installed refrigerant monitoring system and t…
Dripping Springs Fry Creek and Observatory Campground RenovationsEvaluation Stage
This project will replace all picnic tables fire rings paint buildings replace water line and install barriers for resource protection.
Enoree Ranger District Trail Bridge and Boardwalk RepairsEvaluation Stage
Hurricane Helene caused a significant amount of damage to the boardwalks and trail bridges on the Enoree Passage section of the Palmetto Trail system. These damages have been assessed and will need to be addressed in order to restore access to the trail and ensure public safety.
LMPRSMARS Operations and MaintenanceDrafting Solicitation
The Livestock Mandatory Price Reporting System (LMPRS) is a data collection and reporting system that was developed in response to the Livestock Mandatory Reporting Act of 1999 (Act) Mandatory Price Reporting Act of 2010 authorizing the Dairy Product Price - Electronic Mandatory Reporting Program. T…
HIA FR 3303-2.6 over Brevoort River Bridge ReplacementEvaluation Stage
Replacement of existing bridge on Dam Road (FR3303) at milepost 2.6 at Brevoort River. Contract awarded Contract No. 12445526C0002.
GAOA Renovate Laguna CampgroundEvaluation Stage
Repave campground loop and access road.
Middle Fork 26-2 Willamette Complex Suppression Repair SouthDrafting Solicitation
This project is designed to complete road maintenance in accordance with the Willamette complex suppression repair plan. The work included will be road grading rolling ditch cleaning and rock placement.
Middle Fork 26-1 Willamette Complex Suppression Repair NorthDrafting Solicitation
Road maintenance activities in relation to wildfire suppression activites. Activities include grading rolling ditch cleaning and rock placement.
Lone Rock Fuel BreakDrafting Solicitation
Land management Service contract. The purpose of the project is to create a fuel break on National Forest lands and reduce excess fuel loads now and into the future as well as helping reduce further insect and disease outbreaks from trees weakened by wildfire that occurred in the area. The timely re…
1240LT26Q003 BRIDGEPORT WAREHOUSE SNOW DAMAGE MITIGATION AND REPAIRDrafting Solicitation
1240LT26Q003 BRIDGEPORT WAREHOUSE SNOW DAMAGE MITIGATION AND REPAIR
Los Alamos Canyon Aquatic Organism Passage InstallationEvaluation Stage
Project replaces a low water crossing with a Bridge (AOP)
Trabuco Aquatic Organism Passage Installation (AOP).Evaluation Stage
This project is to replace a low water crossing with an AOP bridge.
Houma LabOffice BuildingDrafting Solicitation
To build a new sugarcane lab and office building at the Houma USDA site. The new building will house offices laboratories and conference/meeting spaces. The Lab/Office Building will complement the Sugarcane Greenhouse which is presently under construction on the same site. The new Lab/Office Buildin…
Farm Production and Conservation IT Service DeskDrafting Solicitation
Farm Production and Conservation IT Service Desk
FY26 Lake Fire Sawmill Liebre Reforestation ReleaseEvaluation Stage
This contract is for providing hand release of planted and natural seedlings on 661 acres within the Lake Fire and Sawmill LIebre Reforestation Project on the Los Angeles Gateway RD of the Angeles NF. Hand release consists of hand grubbing all competing vegetation within 5 feet of each seedling cutt…
Southwest Region Tree Cooler ProcurementDrafting Solicitation
This contract would purchase 9 tree coolers with transformers and deliver them to forest locations throughout the southwest region. New tree coolers will be placed in both Arizona and New Mexico. The delivery will include any specialty permitting as well as leveling them once the tree coolers have a…
Angeles National Forest Forest Wide Road MaintenanceDrafting Solicitation
Repairs to widespread damage on forest service roads within the Angeles National Forest during the 2022-2023 Atmospheric Rivers. Project is funded through ARA. Road repairs will restore access to forest lands for public as well as for emergency response needs.
0419 GAOA CONST Causey Reservoir Boat Ramp and Skull Crack Parking LotEvaluation Stage
Construction of new parking lot and emergency boat ramp at causey reservoir
Planned consolidated replacement of 18 Wildland FireRecreationTimber UTVsATVs at end of the useful lifecycle. Replacements for existing fleet assets.Drafting Solicitation
Consolidated procurement of planned replacement assets (18 units) in support of Wildland Firefighting activities. Obtain quality machines at quantity discounts to specification requirements for each asset. Used to haul firefighting/recreation/timber personnel/cargo to remote locations extract injure…
Fleet Support ServicesAwarded
The purpose of this requirement is to provide fleet contract support services to enable NRCS fleet optimization NRCS telematics and the FPAC vehicle sharing program. The contractor assists with a variety of fleet programs to include telematics vehicle allocation methodology (VAM) studies fleet reduc…
Ultra-low temperature freezers and storage racksAwarded
This requirement is for four ultralow freezers capable of extreme temperatures for the proper storage of research samples as well as some storage racks made specifically for this type of storage.
LMR EnhancementsEvaluation Stage
Programming enhancements to the LMR data collection application and database to accommodate necessary changes for accurate reporting of existing commodities and addition of new commodities and/or transaction types
2026 Road Maintenance-NorthDrafting Solicitation
THE OBJECT OF THIS WORK IS TO RESTORE THE APPROPRIATE TRAVEL CONDITIONS TO THE ROAD AND MAXIMUM POSSIBLE FUNCTION TO DRAINAGE FEATURES AND STRUCTURES. GRADING DITCH PULLING CULVERT CLEANING AND BRUSHING.
2026 ROAD MAINTENANCE-SOUTHDrafting Solicitation
THE OBJECT OF THIS WORK IS TO RESTORE THE APPROPRIATE TRAVEL CONDITIONS TO THE ROAD AND MAXIMUM POSSIBLE FUNCTION TO DRAINAGE FEATURES AND STRUCTURES. GRADING DITCH PULLING CULVERT CLEANING AND BRUSHING.
Fruit Fly Shipping Boxes for Waimananlo Fruit Fly Facility Waimanalo HawaiiEvaluation Stage
The United States Department of Agriculture (USDA) Animal Plant Health Inspection Service (APHIS) Plant Protection and Quarantine (PPQ) in Waimanalo Hawaii requires shipping boxes and inserts for emergency and preventative Medfly Projects.
CA NRI Grazing Land On-Site Data Collection - Southern CaliforniaAwarded
Natural Resources Inventory (NRI) field work for BLM segments in Southern California. BLM is mandated to doing NRI data collection on federal land and the Chief-signed reimbursable agreement for NRCS to perform that collection on their behalf. The NRI Program serves as the federal governments princi…
Canyon Lakes Toilet Cleaning ContractEvaluation Stage
Cleaning and sanitation of Toilet facilities on Canyon Lakes to Standards.
Sugar Creek Timber Sale road repairDrafting Solicitation
This project is intended to repair three (3) roads that were damaged in 2023 due to heavy rainfall and winds from Hurricane Helene. These roads repairs are needed to provide safe commercial haul for timber sale products. Repairs include road reconstruction cut and fill slope stabilization roadside b…
Skidmore Day Use ImprovementsEvaluation Stage
Moratorium Exception Great American Outdoors Act Approved Skidmore River Access Point Improvements. Construct and improve the Skidmore River Access Point picnic area to include increased parking new day use sites and drainage construction.
MARS enhancementsEvaluation Stage
Programming enhancements to the MARS data collection application and database to accommodate necessary changes for accurate reporting of existing commodities and addition of new commodities and/or transaction types
Renovate and Repair Burned facilities in Falcon Group Campground Bluejay and El Cariso Campgrounds multiple picnic areas trails and roads.Evaluation Stage
This project is funded from Burned Area Recovery (BAR) funds and will replace barriers repave roads and renovate damaged campground and Recreation sites in the Airport Fire burned area.
Solvent Storage Building Envelope Steam Tunnel RepairsDrafting Solicitation
This project will implement building envelope repairs at the Main Laboratory and Solvents Storage Building and replace two failing steam tunnel expansion joints at the Eastern Regional Research Center. The work is based on deficiencies identified in the AE site investigation dated 02/11/2025 and inc…
Aggregate Placement on high Use Active management RdsDrafting Solicitation
Placing aggregate on timber haul roads to facilitate safe and efficient haul
Perimeter Security Enhancement Parking Lot 9 12th Street USDA Headquarters Jamie L. Whitten Building Washington D.C. 20250Evaluation Stage
Provide a Level 4 perimeter security enhancement for the Jamie L. Whitten Building at Lot 9 updating the original construction documents drawings and specifications as necessary following determination of areas requiring demolition and sink hole remediation by continuing construction where the origi…
FY26 Landmark Call OrderAwarded
FY26 Landmark Development - to deploy a common platform based on commercial software to modernize FPAC Managed Common Modules and Agency Modules includes Palantir base licensing as well as licensing to support integration with producer and partners. FPAC Palantir High Front End (FPACPH FE) is a Soft…
North Dakota Easement SurveysDrafting Solicitation
Land surveys to verify acres for WRE contracts .
Shade Systems for USDA ARS U.S. Meat Animal Research Center (USMARC)Awarded
U.S. Meat Animal Research Center has a requirement to extend inspect and retract NetPro Protective Canopy shade systems covering feedlot pens and sheep pens to aid in mitigating the effects of the heat of the summer months.
FY26 AvaCassville Hazardous Fuels ReductionDrafting Solicitation
This project aims to solicit bids for a hazardous fuels reduction treatment on the Ava and Cassville units of the Ava/Cassville/Willow Springs Ranger District of the Mark Twain National Forest. Work will include removing invasive eastern redcedar trees from woodlands and glades as well as dispersing…
Renovate AxTaam Maamtash CampgroundCancelled
This project will replace picnic tables fire rings install new water system and well and improve camping sites.
Repaving multiple campgrounds.Evaluation Stage
Great American Outdoors Act funding repaving multiple campgrounds to include striping handicap parking and camping spurs.
Single Award GSA-MAS BPA - Application Sustainment and Production Support OperationsAwarded
Single Award GSA-MAS BPA - Application Sustainment and Production Support Operations
Grey Towers Hazardous Tree IDIQ Contract max ceiling up to the SAT.Evaluation Stage
Grey Towers hazardous tree trimming and or removal IDIQ contract
Hurricane Helene Disaster Recovery Support Services for the U.S. Forest Service (USFS) George Washington Jefferson National ForestDrafting Solicitation
The U.S. Forest Service (USFS) George Washington Jefferson National Forest seeks comprehensive damage/recovery assessment services and associated program management support to create a robust recovery framework to effectively prioritize track deconflict and coordinate disaster recovery and restorati…
New Bases and Repeaters for ZETRON SystemsAwarded
ZETRON CCV-Packages Qty 20 30W Repeaters DC Qty 2 30W Repeaters AC VHF Control Stations Qty 4 DC Qty 3 AC Qty 9 UHF Base Stations Crossband Repeat Bases Qty 2 UHF DC Qty 1 UHF AC Crossband No-Repeat Bases Qty 3 UHF DC Qty 1 UHF AC.
Retirement Processing for the National Finance Center.Awarded
Process annuity retirement cases and non-annuity retirement cases in accordance with established procedures. Triage and proofread incoming mail related to annuity retirement cases to ensure accuracy and completeness. Sort match and distribute bi-weekly retirement output to the appropriate offices. P…
Illumina NextSeq2000 Service Support PlanAwarded
The U.S. Meat Animal Research Center utilizes Illumina NGS sequencing reagents and supplies to support research projects throughout the USDA. Without this service contract the instrument will not be operable if a problem arises.
FY26 Q3 Task Order with Illumina Inc. for Whole Genome kits and suppliesAwarded
FY26 Q3 Task Order with Illumina Inc. off of Department-wide contract (1232SA25D0004) for Whole Genome kits and supplies on positive samples
FY25 Boilers and hot water tankAwarded
Replacement of boiler system (3 hot water boilers boiler circulation pumps and hot water system pumps) and a domestic hot water heater at the USDA-ARS EIDMRU Lab in Marshfield WI.
Miseq i100s to perform Whole Genome Sequencing (WGS) on all foodborne pathogens isolated and confirmed from FSIS inspected productsAwarded
Purchase Miseq i100s (7 instruments) to perform Whole Genome Sequencing (WGS) on all foodborne pathogens isolated and confirmed from FSIS inspected products (existing equipment is no longer supported by manufacturer)
NBAF - Installation of Elevated Service and Storage Platforms ConstructionAwarded
The firm shall provide all services as stipulated in this Task Order for Construction of Elevated Service and Storage Platforms at the USDA ARS National Bio and Agro Defense Facility (NBAF) to meet current ARS Standards (including ARS 242.1M) and to meet research and operational needs as detailed be…
GAOA Beaverhead Deerlodge National Forest Birch Creek CCC Camp RestorationAwarded
This contract will complete needed restoration work including but not limited to reroofing residing replacing trim and replacing sheathing at 6 structures at the Historic Birch Creek Civilian Conservation Corps Camp.
Angell JCC Gym and Admin Electrical DeficienciesAwarded
Replace outdated inoperable and non-compliant electrical equipment serving multiple buildings at the Angell Job Corps CCC modify service serving gymnasium.
DDIR Road 18 BridgeEvaluation Stage
AR2023-1-FS DDIR Road 18 Bridge Construction
DDIR Road 38 and 514Evaluation Stage
AR2023-1-FS Road 38 and 514 Reconstruction
DDIRs Roads 147 and 149Evaluation Stage
AR2022-1-FS DDIRs 147-2.7 and 147-4.7 AR2022-1-FS DDIR 149-5.6
DDIRs Roads 114 132Drafting Solicitation
AR2022-1-FS DDIR114-7.1 AR2023-1-FS DDIRs 114-4.6 AND 114-12.18 AR2023-1-FS DDIRs 132 (ALL)
Gibbs Wash Bridge Replacement and Roadway RealignmentDrafting Solicitation
Replace Gibbs Wash Bridge on NFSRoad 39 Coronado NF Santa Catalina District and realign roadway and approaches to bridge. This is a replacement of a deficient bridge on a critical road used for a multitude of commercial and recreational access.
Waldron City Lake Road ReconstructionEvaluation Stage
Reconstruct Waldron City Lake Road
Plot Combine-HarvesterAwarded
A new plot combine will be utilized by USDA-ARS Grain Legume Genetics and Physiology to facilitate the harvest and data collection of advanced legume breeding lines. This information will be used to develop improved legume varieties to ensure USA bred legumes remain competitive in a global market an…
(PAS DME) Software Delivery Services and SupportDrafting Solicitation
The complete set of requirements was not available to the contractor during the original task order award. The task order will be modified to incorporate the additional time and funds to complete the requirements.
Kootenai National Forest Hand Tree Planting ADC Installation and MaintenanceAwarded
The Kootenai National Forest (KNF) needs to obtain high quality tree planting shrub/native planting animal damage control (ADC) installation maintenance and removal and associated services to ensure maximum stock survival and achieve prompt reforestation on site-specific lands administered within th…
Critical Housing Deferred Maintenance - LowmanAwarded
This project remodels 6 housing units on the Lowman District of the Boise National Forest. Work includes replacing windows water heaters furnaces washer dryers and repairing flooring drywall and tile and creating a making one bunkhouse accessible. The REQ was created and solicited prior to the RPT r…
Mt. Hull Thin PileAwarded
Thinning and piling on 1140 acres. 590 acres was optional and is now fully funded.
The United States Department of Agriculture (USDA) Farm Production and Conservation (FPAC) agency has a requirement for a contractor to provide Platform Support Services.Evaluation Stage
The United States Department of Agriculture (USDA) Farm Production and Conservation (FPAC) agency has a requirement for a contractor to provide Platform Support Services. Atlassian SharePoint/O365 and FPAC Web Environment Platform (FWEP)
Critical Housing Deferred Maintenance - Idaho CityAwarded
This project remodels 9 housing units on the Idaho City district of the Boise National Forest. Work includes replacing windows water heater furnaces and removing and replacing flooring siding sidewalks and making 1 unit fully accessible. The REQ was created and solicited prior to the RPT requirement…
Sallisaw 13 GI Sallisaw 19 GIDrafting Solicitation
Two separate Geologic Investigation Reports (GIR) for the dam rehabilitation design for Sallisaw Creek Site 13 and 19 in Adair County Oklahoma. The GIs including drilling coring developing boring logs producing geologic investigation reports (GIR) and packaging and transporting sampled material and …
Barracks Repairs and RetrofittingAwarded
Repairs to facilities at two administrative sites on the Stanislaus National Forest - reroofing siding repair repainting and restaining. (Already submitted rollover from FY25 ready for award)
Region 3 Roads Multiple Award Task Order ContractEvaluation Stage
The USDA Forest Service (R3) 5-year Indefinite Delivery Indefinite Quantity (IDIQ) Multiple-Award Task Order Contracts (MATOC) for road and bridge construction and related services. Road Work includes repair and construction of native surface gravel or paved roads and road repair and reconstruction.…
Angeles National Forest Gate RepairsEvaluation Stage
Contract for repairs and replacements of Forest Service gates on various roads and at recreation sites. Gates were damaged and in some cases washed out during storms and are in need of repairs for safety of forest visitors as well as resource and investment protection.
NBAF - Repair Steam system (Traps and valves)Drafting Solicitation
Attic stock is need for these critical components of the high pressure steam system so the facility has the needed components on hand to rapidly respond to component failures and perform timely scheduled preventative maintenance.
NBAF - Repair Bioseal Damper RebuildEvaluation Stage
Attic stock is need for these critical biocontainment components so the facility has the needed components on hand to rapidly respond to component failures and perform timely scheduled preventative maintenance.
NBAF-Repair EDS backflow preventers and controls UPSEvaluation Stage
The work is required to ensure utilities are properly backchecked at locations on the effluent decontamination and thermal tissue autoclave systems preventing backwards contamination
NBAF- FitFinish MMA and Specialty Coatings Repair and SealingDrafting Solicitation
This work is required to address repairs associated with damage or touchups to Fit and Finish MMA and Specialty Coatings and sealing. The damages vary by type and are due to issues such as liquid nitrogen exposure material tools and equipment movements general wear and other items identified as nece…
Los Padres Monterey Strategic FuelbreakDrafting Solicitation
Monterey Strategic Community Fuelbreak Improvement Project Fuels reduction and modification fuels removal timber stand improvement and related work across approximately 542 acres. The purpose of this project is to re-establish and maintain historic fuelbreaks at strategic locations in proximity to c…
SUDDEN OAK DEATH DISEASE TREATMENT (SOD)Evaluation Stage
SUDDEN OAK DEATH DISEASE TREATMENT (SOD)
Truck-mounted geotechnical drillEvaluation Stage
This equipment shall be used for soil sampling foundation testing monitoring well installation and subsurface exploration work. The drill machine shall be capable of performing auger borings in unconsolidated formations with hollow-stem augers. The drill shall have the capability of productively usi…
Cloud Security PlatformDrafting Solicitation
New SaaS tool that would be implemented to provide full visibility into cloud Assets Threats Vulnerabilities Cloud configuration data security Identity Posture an Exposure Management.
INFOR CLOUDESUITE SaaS BASE 40Ys SUBSCRIPTIONDrafting Solicitation
INFOR CLOUDSUITE - Infor CloudSuite SaaS Base 4OYs Subscription POC SCOTT FARRIS END USER CHARLES WALLACE
Region 5 FAM SCBA Program GearEvaluation Stage
Region 5 FAM SCBA Program SCBA Gear - MASK CLINDER AND BREATHER W/QC CONNECTION.
Keller Peak Lookouts Line Fire Hazmat CleanupEvaluation Stage
During the Line Fire in 2024 the Keller Peak Lookout burned. The Keller Peak tower greatly added to forest safety by housing volunteer lookouts supporting a camera based smoke detection program and being the location for one of the main radio repeaters for the forest. The resulting mess and debris w…
Bumblebee Stewardship IRSCEvaluation Stage
This project is within the Big Meadow High Risk Fireshed and has been developed to restore forest resilience in the Wildland Urban Interface. It includes 2229 acres of hazardous fuels reduction and 11.9 MMBF of timber harvest including maintenance and reconstruction of National Forest system roads. …
Underground Loose Conveyor replacementEvaluation Stage
No-commitment Supply and installation of new conveyor components including belts idlers pulleys structures and associated hardware. Work includes removal of existing conveyors installation of new system alignment tensioning testing and commissioning to restore full operational capability. The underg…
Payette National Forest Tree Cooler Deferred MaintenanceDrafting Solicitation
Replacement of various components including roofs trim repair windows addition of insulation roof extensions electrical reroutes and drainage as part of deferrec maintenance for two tree coolers
NBAF - MorseWatchmans TrueTouch Upgrade InstallationDrafting Solicitation
Upgrading 17 existing boxes and purchasing 13 additional boxes for containment lab spaces.
TS Zeta Multiple Trail Bridges Replacement Project - Phase 2Drafting Solicitation
This action is intended to amend and add funds to TS Zeta Multiple Trail Bridges Replacement Project Phase 2 No-commit (1162134). An updated checklist with the funding documents will be uploaded to IAS towards 1162134.
ARS Azure Application MigrationsEvaluation Stage
The United States Department of Agriculture (USDA) Agriculture Research Service (ARS) Office of the Chief Information Officer (OCIO) requires contractor assistance for migrating ARS applications into the ARS Azure Applications government cloud.
OPEM Property Real Property Management Divisions USDA Lease Contracting Quality Assurance ProgramEvaluation Stage
To ensure compliance with federal regulations oversee lease acquisition processes and procedures and provide ongoing training on trending issues through continued Compliance Review and Oversight. The objective of the compliance review and required corrective actions is to provide risk management ass…
Groundwater Transfer and Injection Project (GTIP) Phase 2Drafting Solicitation
Technical expertise is needed to provide advice and counsel to the Groundwater Transfer and Injection Project (GTIP) Phase 2 team at Agricultural Research Service (ARS) National Sedimentation Laboratory (NSL) collaborators and stakeholders in selecting appropriate sites and creating a most probable …
National Resources Inventory (NRI) Wyoming Federal USDA-BLM and Non-Federal On-Site Private Grazing Land (OPGL) Data CollectionDrafting Solicitation
The Natural Resources Conservation Service (NRCS) an agency of the United States Department of Agriculture is mandated to assess the status condition and trends of soil water and related resources on the Nations Non-Federal lands. To accomplish this task the NRCS will award one contract that require…
08-CON-ARA M2 Snake Creek Slide RepairEvaluation Stage
The purpose of this Task Order is to provide a survey preliminary and final engineering report geotechnical engineering investigation and analysis and civil engineering design for the Forest Service concerning permanent road repairs on the 3 sites on the M2 Road Mendocino National Forest.
Exterior Stucco Repair and Painting at Wooton Hall Bldg B001Drafting Solicitation
Repair exterior stucco that is cracking and falling off in places.
Replace 3 Roof Mounted Air Handling Units Repair one Air Handling Unit and Repair one Chiller B-1Drafting Solicitation
During the Ice Storm of 2026 the facility lost power and 4 air handling units were damaged. All four are water based heating and cooling systems. Three of these units (roof mounted) need to be totally replaced and one on the inside of the building can be repaired. Likewise the roof mounted chiller n…
Craggy SIR Site Prep Phase 2Evaluation Stage
Manual site prep for reforestation by cutting and piling fire killed trees and brush.
PCIT Contract (GSA Delivery Order)Evaluation Stage
PCIT Contract (GSA Delivery Order)
Lincoln Springs Stewardship Integrated Resource Service ContractDrafting Solicitation
The project includes the Lincoln Springs FANEC and encompasses approximately 2855 acres and includes a combination of commercial harvest non-commercial harvest vegetation treatments and prescribed fire with the primary objective of hazardous fuels reduction across all treatment units. This project a…
Two Pass-through Autoclaves for Third Floor North Building 20. NCAH Ames IADrafting Solicitation
The USDA National Centers for Animal Health 1920 Dayton Avenue Ames IA 50010 has two (2) pass-through autoclaves serving The Diagnostic Virology Laboratory (DVL) on the third floor main consolidated laboratory facility (building 20) that need to be replaced with new autoclaves including removal and …
Nacimiento Engine Bay and Barracks DesignDrafting Solicitation
This project supports the design for the engine bay and barracks lost during the Dolan fire in 2020. The new facilities will be constructed at an existing administrative site King City determined to be best suited for long-term fire operations
Grizzly Flats Engine Bay and Barracks DesignDrafting Solicitation
This project supports the design for the Grizzly Flats Engine Bay and Barracks lost in the 2021 Caldor fire.
Active Management Forest Road One Eighty-Two RelocationDrafting Solicitation
This HIGH PRIORITY construction contract is to relocate a 0.75 mile segment of FR182 to adjacent uplands and existing roads. A 1500 section within the 0.75 mile segment has continually sunk into a wetland/bog that drains into a popular lake. This project will address a major road safety concern as w…
Red Hat OpenShift Platform Plus Base plus 4.Awarded
RedHat OpenShift system is required to currently support the Maximo Asset Procurement Inventory and Work Management system and will be utilized as the platform for future system implementations and ongoing system efficiency gains. There are also additional Cyber Security features that will be availa…
Multi-Trade Facilities Construction Repair and Remodel (IDIQ)Evaluation Stage
Intermountain Region Facilities MATOC
Establish a 5-year IDIQ contract for Helicopter CAS for wildlife damage managementAwarded
Establish a 5-year IDIQ contract for Helicopter CAS for wildlife damage management
Air filter replacement for the Phoenix Rearing FacilityAwarded
Phoenix Rearing Facility is part of a federally appropriated program that aligns with the Congressional Findings in Specialty Crops Competitiveness Act (7 U.S.C. 1621 et seg.) The facility provides sterile insects for the California Nut Industry. In order to run optimally and provide clean air for t…
BAS upgrade - Chemical WingDrafting Solicitation
Repair of the pneumatic lab controls with digital controls and standardizing all labs.
Oka Wen Cle Elum RD Stampede Pass Heritage SurveysDrafting Solicitation
Heritage Surveys within the CERD Stampede Pass Planning area
Relocate Cedar Creek Rifle RangeEvaluation Stage
Construct a new rifle range on Snake Ridge Rd (FSR 743C). Range includes shelter with eight (8) firing positions backstop parking and site drainage. Project will also demolish and remediate the old Cedar Creek Rifle Range.
WRRD Saw Work and Hand PilingDrafting Solicitation
Hand cutting with chainsaws and hand piling for hazardous fuels reduction.
WRRD Prescribed Fire SupportDrafting Solicitation
Prescribed fire burn support utilizing Two-Person Crew Module Engine Module Five-Person Crew Module Water Delivery System and Two-Person Crew Module Water Tender Module Five-Person Chainsaw Crew Module
Meeks Mesa Campground ConstructionEvaluation Stage
This project includes the construction of a campground and trailhead.
CA SiteMinder- FPAC increaseEvaluation Stage
FPAC will issue communications to approximately 4 million Producers at the end of May directing them to log in to the Landmark application to view and update their crop acreage reporting. These users will authenticate through eAuth which will consume both Broadcom SiteMinder and SailPoint external u…
Sailpoint-FPAC increaseEvaluation Stage
FPAC will issue communications to approximately 4 million Producers at the end of May directing them to log in to the Landmark application to view and update their crop acreage reporting. These users will authenticate through eAuth which will consume both Broadcom SiteMinder and SailPoint external u…
Nature TrailAdministrative Road Repairs at Glen Alton Recreation AreaEvaluation Stage
Repairs to administrative roadway/nature trail located at the Glen Alton recreation area on the Eastern Divide Ranger District George Washington Jefferson National Forests. Road/trail will need extensive repairs to roadway/trail tread to include the installation/clearing of culverts re-ditching of r…
CGAHR Administrative Support -Drafting Solicitation
he CGAHR facility currently has four vacant Program Support Assistant positionsroles that have historically provided dedicated administrative support to each research unitas well as a vacant Secretary position that supports the Center Directors Office. The absence of these positions represents a sig…
Survey Supply Procurement Program ServiceNow Development and SupportDrafting Solicitation
Plant Protection and Quarantine Program procurement of services to support the development and support of the SSPP application on the ServiceNow platform.
Service contract to treat dead and dying trees in the Modoc NFDrafting Solicitation
Service contract to treat dead and dying trees. Cut material will be piled.
Lost Creek Vegetation Management Heritage SurveysDrafting Solicitation
Lost Creek Vegetation Management Heritage Surveys
GAOA Southern Sierra Zone Pavement Striping and SignageDrafting Solicitation
Sequoia NF road pavement striping and safety signage improvements throughout the forest.
Hurricane Helene Boundary Maintenance Phase I Statement of WorkDrafting Solicitation
1.) Paint/post approximately 54.6 miles of boundary line between Forest Service and private lands adhering to USFS Land Surveying Standards.
HIF-CON GAOA Monocle Lake Recreation AccessAwarded
Repaving of existing access road to Monocle Lake Campground Day Use Boat Landing and Campground Roads.
Lake Powhatan WWTP Disaster Recovery Decommissioning and Sewer ConnectionDrafting Solicitation
The existing wastewater plant damamged by Hurricane Helene will be decommissioned and the Lake Powhatan Recreation Area will be connected to municipal sewer by the construction of and new force main and upgrade of the existing pump station. This project will improve user satisfaction mitigate the li…
WRRD Saw Contract (cutting and piling)Evaluation Stage
Cutting and piling of mixed conifer and brush. Fuels Reduction Treatment
WRRD Prescribed BurningEvaluation Stage
Prescribed burning to include hand pile underburn swamper/jackpot timber sale
INF Forest Wide Facilities contractEvaluation Stage
To repair quarters and facilities that have gone without maintenance on the forest due to lack of facilities personal to maintain.
NFSR 99 Table Rock Road Recreation Site Repairs Brown Mountain Overlook RepairsDrafting Solicitation
Repairs to Table Rock that sustained damage during Hurricane Helene
080109 RHELM-NFSR 553500 Resurface and ReconstructionDrafting Solicitation
Preparation milling portions patching and resurfacing of NFSR 553 for 5.008 miles and NFSR 500 for 2.625 miles for a total of 7.633 miles on the National Forests in Alabama to support upcoming timber sales.
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CHEESE BLEND AMER SKM LVS-12/2 LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CHEESE BLND AMER SKMYEL REGSLC LVS-6/5LB
Procurement of commodities and services for market support FNS nutrition assistance FAS humanitarian food aid and disaster programs.
CHEESE PROCESS REG LVS-6/5 LB
Sierra Vista Scenic Byway Stripping Brushing Rehabilitation Project.Evaluation Stage
The Work consist of Rehabilitation of asphalt surface paving and fog seal brushing and stripping the Sierra Vista Scenic Byway.
NAL Roof ReplacementDrafting Solicitation
NAL roof leaks would continue if not properly addressed. If the leaks persist they can expand in size and can start to compromise the roof. There would be continued damage to the penthouse which could result in damage to the HVAC equipment.
RD-FSA Financial Management Improvement ProjectEvaluation Stage
The target end state objective of this project is to replace RD and FSAs aging funds management and financial management general ledger function from PFCS PLAS and ECMS systems with USDAs central financial and funds management system FMMI.
North Umpqua Ranger District Planting Contract Fiscal Year 2027Drafting Solicitation
Tree planting contract for the North Umpqua Ranger District in the 2027 fiscal year.
NCAH-NBAF COOP SiteDrafting Solicitation
The goal of this project is to perform a study that evaluates any and all risks associated with foreign animal and zoonotic diseases associated with the current containment capabilities at NCAH and identifies recommended solution(s) to mitigate the risks identified thereby enabling NCAH to become a …
This is for 5 year IDIQ single award for BSE Sample collection servicesAwarded
Contracting Officer needs a RPT number to issue the award but this IAS REQ 1161523 was entered prior to the RPT process requirement.
ServiceNow Platform Support Services - Option Year 1 ServiceNow Service Delivery Modernization ContinuationEvaluation Stage
ServiceNow Platform Support Services-CIO and DISC ACIO requested acceleration of Service Desk consolidation for OCIO along with Mission Area Onboarding to SDM to complete the effort by end of 2026 calendar year. ROM 2-month engagement
The project objective is to reduce the frequency of flooding within the City of Aliceville. Federal Objectives require water resources investments to reflect national priorities encourage economic development and protect the environment byAwarded
The project objective is to reduce the frequency of flooding within the City of Aliceville. Federal Objectives require water resources investments to reflect national priorities encourage economic development and protect the environment by
LOUISIANA CANEY DISTRICT Road Mnt Services AND ConstructionEvaluation Stage
LOUISIANA CANEY DISTRICT Road Mnt Services AND Construction
LOUISIANA CATAHOULA DISTRICT Road Mnt Services AND ConstructionEvaluation Stage
LOUISIANA CATAHOULA DISTRICT Road Mnt Services AND Construction
LOUISIANA KISATCHIE DISTRICT Road Mnt Services AND ConstructionEvaluation Stage
LOUISIANA KISATCHIE DISTRICT Road Mnt Services AND Construction
LOUISIANA WINN DISTRICT Road Mnt Services AND ConstructionEvaluation Stage
LOUISIANA WINN DISTRICT Road Mnt Services AND Construction
IBM Maximo Application Suite System Licensing Procurement Base 4 POP 01 May 2026 - 30 Apr 2027Awarded
To support NBAFs mission an IBM Maximo AppPoints Software Subscription is requested for the continued system use in support of Maximo as the Asset Procurement Inventory and Work Management system for NBAF. If another product other than Maximo or on a different licensing model were used we would have…
Application Sustainment - Production Support OperationsEvaluation Stage
USDA RD Technology Office under the guidance of the Assistant Chief Information Officer (ACIO) is responsible for developing maintaining and operating a portfolio of IT systems. The United States Department of Agriculture (USDA) Rural Development (RD) Business Center has a need for contractor techno…
Rainbow Springs Permanent Road RepairsDrafting Solicitation
Roadway repairs to permanently reconstruct NFSR 437 was critically damaged during Hurricane Helene
Construct FSR 376 1067 AOPsDrafting Solicitation
This project includes the replacement of failed stream crossings on FSRs 376 1067 on the Enoree Ranger District. Replacement structures will be bottomless aluminum box culverts with full-length headwalls and will meet HL-93 design loading criteria. Both AOPs will ensure flood capacity and aquatic or…
Re-procure Janitorial Services for AMS CT Program in Memphis TNEvaluation Stage
Re-Procure Janitorial Services at the USDA AMS Cotton and Tobacco Program Memphis complex located at 3275 Appling Road Memphis TN 38133. Services will begin upon expiration of Contract 12639526C0009. CS has been awaiting direction on re-procurement (going 8(a) or open market) since December 2025.
12ga 3in 00 buckshot non-toxicAwarded
12ga 3in 00 buckshot non-toxic
Infoblox RenewalAwarded
Infoblox Renewal
IMPLAN Licenses for FPAC AgenciesAwarded
IMPLAN Licenses for FPAC Agencies - 10 licenses - 12 months
Showing the 250 soonest of 2,519 planned actions.