UCB SHALL BE DIRECTLY RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE SPAN-BE INSTRUMENT

DEFINITIVE CONTRACT won by REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE · work in BERKELEY, CA
$1,998,850
RecipientREGENTS OF THE UNIVERSITY OF CALIFORNIA, THE UEI GS3YEVSS12N6
Award ID80GSFC21CA004
Award amount$1,998,850
Award typeDEFINITIVE CONTRACT
Awarding agencyNational Aeronautics and Space Administration — National Aeronautics and Space Administration
NAICS334511 — SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING
PSC1675
Start dateJun 2, 2021
End dateDec 30, 2023
Place of performanceBERKELEY, CA
Record updatedSep 20, 2022

View the official award record

More awards won by REGENTS OF THE UNIVERSITY OF CALIFORNIA, THE

PHASE A THROUGH F - ICON. THIS CONTRACT IS FOR THE UNIVERSITY OF CALIFORNIA (UCB) AT BERKELEY SPACE SCIENCES LABORATORY, THE PRIME CONTRACTUAL INTERFACE FOR NASA FOR THE IONOSPHERIC CONNECTION EXPLORER (LCON) MISSION INVESTIGATION TEAM, THAT COVERS PHASE A OF THE MISSION. THE NASA AO IS NNHIIZDA0020. UNDER THE DIRECTION OF THE PRINCIPAL INVESTIGATOR (PI) DR. THOMAS IMMEL, UCB WILL BE THE PRINCIPAL CONTRACTOR TO NASA FOR ICON. UCB SHALL CONDUCT THE PHASE A CONCEPT STUDY IN ACCORDANCE WITH THE CONCEPT STUDY GUIDELINES. IN PERFORMANCE OF THIS STUDY, THE ICON TEAM SHALL: A. CONDUCT TRADE AND RISK REDUCTION STUDIES B. UPDATE AND REFINE THE EXISTING MISSION COST ESTIMATES AND FINANCIAL PLAN C. INTEGRATE AND DELIVER TO NASA ALL SUBCONTRACTOR AND UCB FINANCIAL REPORTS D. DEVELOP PLAN FOR EARNED VALUE MANAGEMENT TO BE IN PLACE DURING PHASES C AND D E. DEVELOP THE MISSION IMPLEMENTATION PLAN FOR PHASE B/CID, AND E F. DEFME THE RISK MANAGEMENT PLAN AND DEVELOP MITIGATION STRATEGIES G. OUTLINE THE FABRICATION, INTEGRATION, TEST, AND OPERATION OF THE SYSTEM H. DEFINE THE EDUCATION, OUTREACH, TECHNOLOGY, AND SMALL BUSINESS DISADVANTAGED BUSINESS PLANS I. DEVELOP A PRELIMINARY PERFORMANCE ASSURANCE IMPLEMENTATION PLAN (PAIP) J. DEVELOP A PRELIMINARY SYSTEMS ENGINEERING MANAGEMENT PLAN K. DOCUMENT THE RESULTS OF THE STUDIES IN THE PHASE A CONCEPT STUDY REPORT AND L. PRESENT THE ICON CONCEPT TO THE NASA ASSOCIATE ADMINISTRATOR.
National Aeronautics and Space Administration · $182,059,179 · Jan 11, 2012
THE COMPTON SPECTROMETER AND IMAGER (COSI)
National Aeronautics and Space Administration · $165,564,175 · Mar 23, 2021
GLOBAL LYMAN-ALPHA IMAGERS OF THE DYNAMIC EXOSPHERE (GLIDE) INSTRUMENT PROGRAM DEVELOPMENT (PHASE B) SUPPORT.
National Aeronautics and Space Administration · $79,191,369 · Feb 10, 2021
ESCAPE AND PLASMA ACCELERATION AND DYNAMICS EXPLORERS (ESCAPADE) MISSION -.PHASE A CONCEPT STUDY.
National Aeronautics and Space Administration · $53,386,291 · Aug 21, 2019
LOGICS: LEARNING-DRIVEN ORACLE-GUIDED COMPOSITIONAL SYMBIOTIC DESIGN OF CYBER-PHYSICAL SYSTEMS
Department of Defense · $8,809,577 · Sep 29, 2020

Our catalog shows awards of $250K+ active within the last 5 years. Need older history or smaller awards? Tell us what you need — we expand by request.

Awards tell you who won. Bids tell you what's next. BidCatch scans 100+ federal, state, and local sources every night and sends the new opportunities matching your trade — before they're awarded to someone else. Free for 14 days, then $49.99/month.

Search open bids