THIS EFFORT IS FOR WORK PERFORMED DURING PHASE B THROUGH F OF THE TRANSITING EXOPLANET SURVEY SATELLITE (TESS) MISSION. THE SPECIFIC REQUIREMENTS FOR EACH OF THESE PHASES ARE PRESENTED IN INDIVIDUAL SECTIONS BELOW. THE EFFORT ALSO INCLUDES TASKS TO: DESIGN, ANALYZE, VALIDATE, DEVELOP, FABRICATE, ASSEMBLE, INTEGRATE, TEST, AND DELIVER THE TESS SPACECRAFT; INTEGRATE, TEST, AND OPERATE THE TESS OBSERVATORY; AND DEVELOP, TEST, OPERATE, AND SUSTAIN THE ASSOCIATED MISSION OPERATIONS CENTER (MOC). THE CONTRACTOR IS RESPONSIBLE FOR THE DEVELOPMENT OF THE SPACECRAFT AND CAMERA ACCOMMODATION STRUCTURE, INCLUDING THE SUNSHADE. THE TESS INSTRUMENT, CONSISTING OF THE CAMERA STRUCTURE ASSEMBLY, DATA HANDLING UNIT AND HARNESS, WILL BE PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INTEGRATION ACTIVITIES BETWEEN THE INSTRUMENT AND THE SPACECRAFT WITH INSTRUMENT PERSONNEL SUPPORT. THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, MATERIALS, FACILITIES AND RESOURCES NECESSARY TO CONDUCT THESE ACTIVITIES.

DEFINITIVE CONTRACT won by NORTHROP GRUMMAN SYSTEMS CORPORATION · work in STERLING, VA
$103,452,107
RecipientNORTHROP GRUMMAN SYSTEMS CORPORATION UEI Q11ZHUFBW741
Award IDNNG14FC04C
Award amount$103,452,107
Award typeDEFINITIVE CONTRACT
Awarding agencyNational Aeronautics and Space Administration — National Aeronautics and Space Administration
NAICS336414 — GUIDED MISSILE AND SPACE VEHICLE MANUFACTURING
PSC1810
Set-asideUnrestricted
Start dateMar 24, 2014
End dateSep 30, 2027
Place of performanceSTERLING, VA
Record updatedJul 31, 2026

View the official award record

More awards won by NORTHROP GRUMMAN SYSTEMS CORPORATION

COMPUTER,RADAR DATA
Department of Defense · $8,772,830,701 · Sep 23, 2019
E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7)
Department of Defense · $8,506,847,160 · Feb 15, 2018
E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-2)
Department of Defense · $5,378,327,771 · May 13, 2013
FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
National Aeronautics and Space Administration · $4,458,196,320 · Apr 17, 2006
THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
National Aeronautics and Space Administration · $4,346,435,437 · Oct 1, 2003