THE CONTRACTOR SHALL PROVIDE ALL PERSONNEL, FACILITIES, EQUIPMENT, MATERIAL, AND SERVICES NECESSARY TO DESIGN, DEVELOP, MANUFACTURE, INTEGRATE, TEST, AND DELIVER THE HARDWARE, DOCUMENTATION, AND SERVICES SPECIFIED HEREIN. THE CONTRACTOR SHALL ALSO PROVIDE SUPPORT, AS REQUIRED, FOR PRE-DELIVERY MISSION INTEGRATION ACTIVITIES, SUCH AS NPP MISSION OPERATIONS REVIEW AND JPSS DELTA-PDR. DOCUMENTATION AND OTHER TASKS SHOULD BE IN ACCORDANCE WITH THE REQUIREMENTS OF THIS SOW AND THE APPLICABLE DOCUMENTATION REFERENCED IN SECTION 2.3 HEREIN. COMPLIANCE WITH THE REQUIREMENTS STATED HEREIN, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.

DEFINITIVE CONTRACT won by NORTHROP GRUMMAN SYSTEMS CORPORATION · work in AZUSA, CA
$611,992,541
RecipientNORTHROP GRUMMAN SYSTEMS CORPORATION UEI U6V4EWXNS1D8
Award IDNNG11XA04C
Award amount$611,992,541
Award typeDEFINITIVE CONTRACT
Awarding agencyNational Aeronautics and Space Administration — National Aeronautics and Space Administration
NAICS334511 — SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING
PSC1820
Set-asideUnrestricted
Start dateSep 13, 2011
End dateMar 1, 2029
Place of performanceAZUSA, CA
Record updatedSep 22, 2026

View the official award record

More awards won by NORTHROP GRUMMAN SYSTEMS CORPORATION

COMPUTER,RADAR DATA
Department of Defense · $8,772,830,701 · Sep 23, 2019
E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-7)
Department of Defense · $8,506,847,160 · Feb 15, 2018
E-2D ADVANCED HAWKEYE AIRCRAFT (FRP-2)
Department of Defense · $5,378,327,771 · May 13, 2013
FIRST DDT AND E, ARES I-X, AND FLIGHT TESTS. FIRST STAGE WILL BE A FIVE SEGMENT, SOLID ROCKET BOOSTER DERIVED FROM THE SPACE SHUTTLE PROGRAM (SSP) SOLID ROCKET BOOSTER (SRB)/REUSABLE SOLID ROCKET MOTOR (RSRM). THE CONTRACTOR SHALL FURNISH THE NECESSARY MANAGEMENT, ENGINEERING, LABOR, FACILITIES, TOOLS, EQUIPMENT, AND MATERIALS REQUIRED FOR FIRST STAGE DEVELOPMENT, QUALIFICATION, CERTIFICATION AND ACCEPTANCE PROGRAM. ACTIVITIES INCLUDE: REDESIGN AND TESTING OF THE MOTOR TO INCORPORATE THE FIFTH SEGMENT AND PRODUCTION OF FIVE FULL SCALE GROUND STATIC TEST MOTORS: TWO DEVELOPMENT MOTORS (DMS)-AND THREE QUALIFICATION MOTORS (QMS); STRUCTURAL TEST ARTICLE (STA), GROUND VIBRATION TEST MOTORS (GVTMS) AND OTHER DEVELOPMENT TESTING; REDESIGN OF THE AVIONICS, DECELERATION, SEPARATION, AND FLIGHT TERMINATION SYSTEM (FTS) SUBSYSTEMS; ARES I-X: SIMULATED ARES I OUTER MOLD LINE/MASS PROPERTIES USING MODIFIED SRB/RSRM; AND THREE FLIGHT TEST VEHICLES. TAS::80 0124::TAS
National Aeronautics and Space Administration · $4,458,196,320 · Apr 17, 2006
THE JAMES WEBB SPACE TELESCOPE (JWST) PHASE 2 OBSERVATORY CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE SPACECRAFT, THE OPTICAL TELESCOPE ELEMENT (OTE), PORTIONS OF THE INTEGRATED SCIENCE INSTRUMENT MODULE (ISIM), OBSERVATORY AND SYSTEM INTEGRATION AND TEST (I&T), OBSERVATORY VERIFICATION, OBSERVATORY COMMISSIONING, ASSOCIATED SYSTEMS ENGINEERING, AND THE GROUND AND LAUNCH SUPPORT EQUIPMENT NECESSARY TO DEVELOP AND LAUNCH THE JWST OBSERVATORY.
National Aeronautics and Space Administration · $4,346,435,437 · Oct 1, 2003

Our catalog shows awards with a value or ceiling of $250K+ active within the last 5 years. Need older history or smaller awards? Tell us what you need — we expand by request.

Awards tell you who won. Bids tell you what's next. BidCatch scans 100+ federal, state, and local sources every night and sends the new opportunities matching your trade — before they're awarded to someone else. $0 today for 14 days (card required), then $49.99/month.

Search open bids