NASA HAS INVESTED SIGNIFICANT TIME AND MONEY IN DEVELOPING HIGH-TEMPERATURE TECHNOLOGIES FOR VENUS SURFACE EXPLORATION. DUE TO THE HARSH ENVIRONMENT OUTSIDE AN INSULATED LANDER BODY (~462OC, 92 BAR PRESSURE, CO2 ATMOSPHERE), CONVENTIONAL, HIGH-TRL COMPONENTS AND MATERIALS WILL NOT SURVIVE, EVEN FOR A SHORT DURATION MISSION LASTING ONLY A FEW HOURS..TO MEET THIS NEED, OZARK IC HAS WORKED WITH NASA'S JFET-R INTEGRATED CIRCUIT TECHNOLOGY (UNDER LICENSE SINCE 2016) TO PROVIDE SENSING AND ACTUATION SOLUTIONS THAT CAN SURVIVE IN THIS HARSH ENVIRONMENT. HONEYBEE ROBOTICS (HBR) HAS BUILT AND TESTED SEVERAL MOTOR, SENSOR AND GEARBOX PROTOTYPES FOR A VENUS ROCK SAMPLING DRILL. THE DRILL INCLUDES TWO BLDC MOTORS TO DRIVE THE AUGER AND PERCUSSION MECHANISMS AND A STEPPER MOTOR TO DRIVE THE DRILL FEED STAGE...IN PHASE I OF THIS EFFORT, OZARK IC SHOWED, THROUGH A LABORATORY DEMONSTRATION, THAT NASA'S JFET-R TECHNOLOGY CAN CONTINUOUSLY RUN A STEPPER MOTOR FOR OVER 1,000 HOURS OF OPERATION AT 470OC. IN PARALLEL, HONEYBEE ROBOTICS DEMONSTRATED THAT ITS TRL-6 LEVEL VENUS MOTORS ARE CAPABLE OF BEING USED IN A STEPPER CONFIGURATION TO ACHIEVE THE REQUIRED AUGER NEEDS FOR A VENUS DRILL..WHAT REMAINS FOR PHASE 2 IS TO FABRICATE A COMBINED MOTOR CONTROL CHIPSET, ASSEMBLE MODULES, AND DEMONSTRATE THE COMBINED MOTOR AND ELECTRONICS OPERATING TOGETHER AT THE VENUS SURFACE TEMPERATURE. THE MOTOR AND DRIVE ELECTRONICS WILL THEN BE TESTED AT VENUS TEMPERATURE AND CHARACTERISTIC MEASUREMENTS INCLUDING POWER AND TORQUE WILL BE MONITORED USING HBR'S HIGH TEMPERATURE MOTOR CHARACTERIZATION SYSTEM. 500 HOURS OF OPERATION IS TARGETED FOR THIS EFFORT..
$754,517
| Recipient | OZARK INTEGRATED CIRCUITS INC UEI C3JNF19C7DK8 |
|---|---|
| Award ID | 80NSSC19C0185 |
| Award amount | $754,517 |
| Award type | DEFINITIVE CONTRACT |
| Awarding agency | National Aeronautics and Space Administration — National Aeronautics and Space Administration |
| NAICS | 541715 — RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY) |
| PSC | AR11 |
| Start date | Jul 29, 2019 |
| End date | Aug 1, 2022 |
| Place of performance | FAYETTEVILLE, AR |
| Record updated | Jun 3, 2026 |
View the official award record
More awards won by OZARK INTEGRATED CIRCUITS INC
THE HIGH OPERATIONAL TEMPERATURE SENSORS (HOTS)PROGRAM WILL DEVELOP A TECHNOLOGY FOR HIGH-BANDWIDTH, HIGH-DYNAMIC-RANGE SENSING AT HIGH TEMPERATURE.
Department of Defense · $5,588,096 · Mar 1, 2024
SYSTEM INTEGRATION OF NON-VOLATILE FERROELECTRIC MEMORY FOR HIGH TEMPERATURE APPLICATIONS
Department of Defense · $1,759,884 · Apr 3, 2024
DARPA SMALL BUSINESS INNOVATION RESEARCH (SBIR) PHASE II EFFORT ENTITLED, "HIGH-TEMPERATURE INSTRUMENTATION FOR THE ADVANCEMENT OF HYPERSONIC ENGINE DEVELOPMENT"
Department of Defense · $1,740,422 · May 7, 2021
SBIR/STTR PHASE II R&D
Department of Defense · $1,494,380 · Oct 3, 2023
NEW DARPA SBIR II TITLED "HIGH FIDELITY ANALOG INTEGRATION TECHNIQUES FOR HIGH TEMPERATURE APPLICATIONS"
Department of Defense · $1,492,065 · Jun 2, 2022
Our catalog shows awards of $250K+ active within the last 5 years. Need older history or smaller awards? Tell us what you need — we expand by request.
Awards tell you who won. Bids tell you what's next. BidCatch scans 100+ federal, state, and local sources every night and sends the new opportunities matching your trade — before they're awarded to someone else. Free for 14 days, then $49.99/month.
Search open bids