IGF::OT::IGF BAA - NEXT SPACE TECHNOLOGIES FOR EXPLORATION PARTNERSHIPS (NEXTSTEP) PROPOSAL - HABITATION. NASA HAS INCREASINGLY EMBRACED PUBLIC-PRIVATE PARTNERSHIPS FOR ACHIEVING ITS STRATEGIC GOALS AND OBJECTIVES FOR EXPANDING THE FRONTIERS OF KNOWLEDGE, CAPABILITY, AND OPPORTUNITIES IN SPACE. THE NEXT STEP FOR HUMAN SPACEFLIGHT IS THE DEVELOPMENT OF DEEP SPACE EXPLORATION CAPABILITIES TO SUPPORT MORE EXTENSIVE MISSIONS IN THE PROVING GROUND AROUND AND BEYOND CISLUNAR SPACE. AN IMPORTANT PART OF NASAS STRATEGY IS TO STIMULATE THE COMMERCIAL SPACE INDUSTRY WHILE LEVERAGING THOSE SAME COMMERCIAL CAPABILITIES THROUGH FUTURE CONTRACTS AND PUBLIC-PRIVATE PARTNERSHIPS TO DELIVER MISSION CAPABILITIES. NASAS ACTIVITIES IN ENABLING THE PIONEERING OF SPACE ARE BEING DRIVEN BY A SET OF GUIDING PRINCIPLES: IMPLEMENTABLE IN THE NEAR-TERM WITH THE BUYING POWER OF CURRENT BUDGETS AND IN THE LONGER TERM WITH BUDGETS COMMENSURATE WITH ECONOMIC GROWTH; EXPLORATION ENABLES SCIENCE AND SCIENCE ENABLES EXPLORATION APPLICATION OF HIGH TECHNOLOGY READINESS LEVEL (TRL) TECHNOLOGIES FOR NEAR TERM MISSIONS, WHILE FOCUSING SUSTAINED INVESTMENTS ON TECHNOLOGIES AND CAPABILITIES TO ADDRESS CHALLENGES OF FUTURE MISSIONS; NEAR-TERM MISSION OPPORTUNITIES WITH A DEFINED CADENCE OF COMPELLING AND INTEGRATED HUMAN AND ROBOTIC MISSIONS PROVIDING FOR AN INCREMENTAL BUILDUP OF CAPABILITIES FOR MORE COMPLEX MISSIONS OVER TIME; OPPORTUNITIES FOR U.S. COMMERCIAL BUSINESS TO FURTHER ENHANCE THE EXPERIENCE AND BUSINESS BASE MULTI-USE, EVOLVABLE SPACE INFRASTRUCTURE, MINIMIZING UNIQUE MAJOR DEVELOPMENTS; SUBSTANTIAL INTERNATIONAL AND COMMERCIAL PARTICIPATION, LEVERAGING CURRENT INTERNATIONAL SPACE STATION AND OTHER PARTNERSHIPS. THE CONTRACTOR SHALL DEVELOP A SIMPLE, LOW COST EXPLORATION AUGMENTATION MODULE (EAM) THAT IS AFFORDABLE EARLY ON, THAT ALLOWS VARIOUS TECHNOLOGIES TO BE TESTED OVER TIME, AND THAT IS CAPABLE OF EVOLVING INTO A LONG-DURATION CREW SUPPORT SYSTEM FOR CISLUNAR AND MARS EXPLORATION.

DEFINITIVE CONTRACT won by THE BOEING COMPANY · work in HOUSTON, TX
$25,670,713
RecipientTHE BOEING COMPANY UEI VH1ZJJ9CW9B4
Award IDNNH16CO96C
Award amount$25,670,713
Award typeDEFINITIVE CONTRACT
Awarding agencyNational Aeronautics and Space Administration — National Aeronautics and Space Administration
NAICS541712 — RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)
PSCAR94
Set-asideUnrestricted
Start dateDec 21, 2015
End dateApr 30, 2026
Place of performanceHOUSTON, TX
Record updatedSep 29, 2026

View the official award record

More awards won by THE BOEING COMPANY

INTERNATIONAL SPACE STATION
National Aeronautics and Space Administration · $22,674,726,734 · Nov 15, 1993
USN P-8A FRP II LONG LEAD MATERIAL
Department of Defense · $18,117,317,490 · Aug 14, 2014
RSAF F-15 FLEET MODERNIZATION PROGRAM
Department of Defense · $11,204,226,413 · Mar 8, 2012
PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT.
National Aeronautics and Space Administration · $10,722,778,710 · Sep 1, 2007
F-15, FMS, F-15QA AIR VEHICLE DEVELOPMENT
Department of Defense · $7,359,068,577 · Dec 22, 2017

Our catalog shows awards with a value or ceiling of $250K+ active within the last 5 years. Need older history or smaller awards? Tell us what you need — we expand by request.

Awards tell you who won. Bids tell you what's next. BidCatch scans 100+ federal, state, and local sources every night and sends the new opportunities matching your trade — before they're awarded to someone else. $0 today for 14 days (card required), then $49.99/month.

Search open bids