Category award history
16 category awards to a new vendor (same agency and NAICS code, not this contract's own history) — latest: THE MITRE CORPORATION took Department of Transportation 541330 work from WSP USA INC (Mar 17, 2026).
Agencies buying from WSP USA INC
What WSP USA INC has provided
Awards
ENGINEERING SERVICES NECESSARY FOR THE PREPARATION OF PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E) AND OTHER SUPPORTING DOCUMENTS FOR PROJECT: NP CATO 10(5), 11(2)RESURFACING AND REHABILITATION OF FOXVILLE DEERFIELD ROAD (RTE. 0011) AND PARK CENTRA
Department of Transportation · $750,955 · Feb 17, 2021
ENGINEERING SERVICES NECESSARY FOR THE PREPARATION OF PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E) AND OTHER SUPPORTING DOCUMENTS FOR PROJECT: NP-GRSM 11(4)GATLINBURG TUNNEL (STRUCTURE 5460-085P)IN ACCORDANCE WITH THE ATTACHED STATEMENT OF WORK.
Department of Transportation · $715,583 · Feb 16, 2021
OR DOT 18(2), OR-58: FIX-IT CORRIDOR CULVERTS ENGINEERING SUPPORT DURING ADVERTISEMENT AND CONSTRUCTION
Department of Transportation · $351,030 · Feb 16, 2021
ID FS ERFO 2017(1)-29(1), STODDARD PACK BRIDGE REPLACEMENT PROVIDE CONSTRUCTION SUPPORT
Department of Transportation · $803,837 · Jan 27, 2021
ENGINEERING SERVICES NECESSARY FOR THE PREPARATION OF THE PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E) AND OTHER SUPPORTING DOCUMENTS FOR PROJECT: NP ROCR 503(1) 24(2) TO REHABILITATE WATERSIDE DRIVE AND PINEY BRANCH PARKWAY, LOCATED IN ROCK CREEK
Department of Transportation · $1,267,551 · Sep 9, 2020
WFL RESEARCH 2020(13), INTEGRATING PUBLIC HEALTH IN PUBLIC LAND TRANSPORTATION PLANNING RESEARCH STUDY ON INTEGRATING PUBLIC HEALTH IN PUBLIC LAND TRANSPORTATION PLANNING TWO SEPARATE STUDIES
Department of Transportation · $497,759 · Aug 27, 2020
OR DOT CRGNSA 100(4), HISTORIC COLUMBIA RIVER HIGHWAY STATE TRAIL, MITCHELL POINT CROSSING ENGINEERING SUPPORT DURING ADVERTISEMENT AND CONSTRUCTION
Department of Transportation · $281,589 · Aug 27, 2020
WFL RESEARCH 2020(11), TARGETED MAINTENANCE ON LOW VOLUME ROADS RESEARCH STUDY ON BUILDING RESILIENCY THROUGH MAINTENANCE ACTIVITIES LOW VOLUME ROADS AND PUBLIC LANDS ROADWAYS AND APPLYING FHWAS VULNERABILITY ASSESSMENT AND ADAPTATION FRAMEWORK TO
Department of Transportation · $614,899 · Aug 7, 2020
ID FS ERFO 2017(1)-29(1), STODDARD BRIDGE INTERMEDIATE THROUGH FINAL DESIGN PHASES
Department of Transportation · $986,640 · Jun 23, 2020
ENGINEERING SERVICES NECESSARY FOR THE PREPARATION OF THE PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E) AND OTHER SUPPORTING DOCUMENTS FOR PROJECT: MHN_GT, DSCR_STRTHMR, FP_MG750TRX - FORT MONROE PROJECTS - FORT LEE, MAHONE GATE U.S. RICHMOND SUPPL
Department of Transportation · $2,683,340 · Apr 13, 2020
SERVICES FOR WORK ASSOCIATED WITH PROJECT: NP-NAMA 11(7), 506(2) FOR ALL ENGINEERING SERVICES NECESSARY FOR THE PREPARATION OF THE PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E) AND OTHER SUPPORTING DOCUMENTS IN ACCORDANCE WITH THE ATTACHED STATEMENT
Department of Transportation · $514,362 · Mar 16, 2020
OR DOT 18(2), OR-58: FIX-IT CORRIDOR CULVERTS INTERMEDIATE DESIGN PHASES.
Department of Transportation · $1,749,708 · Oct 21, 2019
WA HRD 2018(1), FISH PASSAGE MONITORING PROTOCOL EVALUATION DEVELOP AN ASSESSMENT AND MONITORING PROTOCOL FOR FISH PASSAGE CULVERTS.
Department of Transportation · $1,042,496 · Aug 29, 2018