THE BOEING COMPANY

Federal contract awards won by THE BOEING COMPANY (UEI SML4NN2CT556), 2007–2026 — public record from USAspending.

Showing awards with a value or ceiling of $250K+ active within the last 5 years. Need older history or smaller awards? Tell us what you need — we expand by request.

25
awards
4,017
expiring in 12 months
3
agencies

Teaming snapshot

teams under 4 primes · primes 299 subs.

From subcontract reports primes file with USAspending/FSRS.

How their work has changed

Their work has changed a lot over the last two years.

Biggest change: Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology) (541712) went from 31% of their contracts to 9%.

Industry (NAICS)2 years beforeLast 2 years
Research and Development in the Physical, Engineering, and Life Sciences (except Biotechnology) (541712)31%9%
Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology) (541715)8%26%
Engineering Services (541330)12%22%
Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing (334511)8%0%
Other Electronic Component Manufacturing (334419)8%0%

Share of their contracts in each industry code: the last 24 months compared with the 24 months before, as of Nov 20, 2026. Shown only for companies with at least 5 contracts in each period.

Where their reported work happens

StateReported subawards
CA215
AL155
FL45
TX42
GA37
OH27
MI27
NY18
MN17
VA16
IL14
AZ13

Place of performance on subcontract reports filed with USAspending/FSRS.

Category award history

37 category awards to a new vendor (same agency and NAICS code, not this contract's own history) — latest: JO-KELL INC. took Department of Defense 336419 work from THE BOEING COMPANY (Sep 14, 2026).

Awards

AVENGER ENGINEERING SERVICES
Department of Defense · $2,348,241 · Jun 7, 2026
SPARES
Department of Defense · $495,259 · Feb 4, 2026
AVENGER ENGINEERING SERVICES
Department of Defense · $3,050,178 · May 13, 2025
PEO MISSILES AND SPACE AVENGER SOFTWARE SUSTAINMENT ACTIVITIES
Department of Defense · $3,115,100 · Jul 3, 2024
SYSTEMS ENGINEERING AND INTEGRATION SERVICES
Department of Defense · $189,766,597 · May 3, 2024
CABLE ASSEMBLY,SPEC TO SUPPORT AVENGER WEAPON SYSTEM
Department of Defense · No current value reported · Apr 19, 2024
GLIDE BREAKER PHASE 2
Department of Defense · $70,554,525 · Sep 8, 2023
GROUND-BASED MIDCOURSE DEFENSE READINESS
Department of Defense · $271,113,598 · Jun 27, 2023
ELEMENT SYSTEM ENGINEERING
Department of Defense · $540,896,584 · Sep 1, 2022
AVENGER ENGINEERING SERVICES
Department of Defense · $432,700 · Aug 27, 2021
AVENGER ENGINEERING SERVICES
Department of Defense · $4,973,021 · Aug 4, 2021
AVENGER ENGINEERING SERVICE
Department of Defense · $3,883,537 · Aug 11, 2020
AVENGER ENGINEERING SERVICE
Department of Defense · $337,262 · Dec 12, 2019
SPACE LAUNCH SYSTEM (SLS) STAGES PRODUCTION AND EVOLUTION CONTRACT (SPEC)
National Aeronautics and Space Administration · $3,888,250,097 · Oct 16, 2019
GBI/AUR PROGRAM MANAGEMENT/SYSTEMS ENG
Department of Defense · $5,018,451,126 · Mar 18, 2019
SYSTEMS ENGINEERING AND INTEGRATION SERVICES
Department of Defense · $409,235,355 · Dec 21, 2018
IGF::CT::IGF
Department of Defense · $23,700,000 · Oct 31, 2018
IGF::CL,CT::IGF
Department of Defense · $8,810,728 · Jul 24, 2017
INTERIM CRYOGENIC PROPULSION STAGE FOR SLS
National Aeronautics and Space Administration · $1,539,113,847 · Oct 1, 2012
PROVIDE DEVELOPMENTAL HARDWARE AND TEST ARTICLES, AND MANUFACTURE AND ASSEMBLE ARES I UPPER STAGES. THE UPPER STAGE (US) ELEMENT IS AN INTEGRAL PART OF THE ARES I LAUNCH VEHICLE AND PROVIDES THE SECOND STAGE OF FLIGHT. THE US ELEMENT IS RESPONSIBLE FOR THE ROLL CONTROL DURING THE FIRST STAGE BURN AND SEPARATION; AND WILL PROVIDE THE GUIDANCE AND NAVIGATION, COMMAND AND DATA HANDLING, AND OTHER AVIONICS FUNCTIONS FOR THE ARES I DURING ALL PHASES OF THE ASCENT FLIGHT. THE US ELEMENT IS A NEW DESIGN THAT EMPHASIZES SAFETY, OPERABILITY, AND MINIMUM LIFE CYCLE COST. THE OVERALL DESIGN, DEVELOPMENT, TEST AND EVALUATION (DDT&E), PRODUCTION, AND SUSTAINING ENGINEERING EFFORTS INCLUDE ACTIVITIES PERFORMED BY THREE ORGANIZATIONS; THE NASA DESIGN TEAM (NDT), THE UPPER STAGE PRODUCTION CONTRACTOR (USPC) AND THE INSTRUMENT UNIT PRODUCTION CONTRACTOR (IUPC). FOR CLARITY, THE USPC WILL BE REFERRED TO AS THE CONTRACTOR THROUGHOUT THIS DOCUMENT. NASA IS RESPONSIBLE FOR THE INTEGRATION OF THE PRIMARY ELEMENTS OF THE ARES I LAUNCH VEHICLE INCLUDING: THE FIRST STAGE, US INCLUDING INSTRUMENT UNIT (IU), AND US ENGINE; AND WILL ALSO INTEGRATE THE ARES I LAUNCH VEHICLE AT THE LAUNCH SITE. NASA IS RESPONSIBLE FOR THE DDT&E, INCLUDING TECHNICAL AND PROGRAMMATIC INTEGRATION OF THE US SUBSYSTEMS AND GOVERNMENT-FURNISHED PROPERTY. NASA WILL LEAD THE EFFORT TO DEVELOP THE REQUIREMENTS AND SPECIFICATIONS OF THE US ELEMENT, THE DEVELOPMENT PLAN AND TESTING REQUIREMENTS, AND ALL DESIGN DOCUMENTATION, INITIAL MANUFACTURING AND ASSEMBLY PROCESS PLANNING, LOGISTICS PLANNING, AND OPERATIONS SUPPORT PLANNING. DEVELOPMENT, QUALIFICATION, AND ACCEPTANCE TESTING WILL BE CONDUCTED BY NASA AND THE CONTRACTOR TO SATISFY REQUIREMENTS AND FOR RISK MITIGATION. NASA IS RESPONSIBLE FOR THE OVERALL UPPER STAGE VERIFICATION AND VALIDATION PROCESS AND WILL REQUIRE SUPPORT FROM THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE MANUFACTURE AND ASSEMBLY OF THE UPPER STAGE TEST FLIGHT AND OPERATIONAL UPPER STAGE UNITS INCLUDING THE INSTALLATION OF UPPER STAGE INSTRUMENT UNIT, THE GOVERNMENT-FURNISHED US ENGINE, BOOSTER SEPARATION MOTORS, AND OTHER GOVERNMENT-FURNISHED PROPERTY. A DESCRIPTION OF THE NASA MANAGED AND PERFORMED EFFORTS IS CONTAINED IN THE US WORK PACKAGES AND WILL BE MADE AVAILABLE TO THE CONTRACTOR TO ENSURE THEIR UNDERSTANDING OF THE ROLES AND RESPONSIBILITIES OF THE NDT, IUPC, AND CONTRACTOR DURING THE DESIGN, DEVELOPMENT, AND OPERATION OF THE US ELEMENT. THE US CONCEPTUAL DESIGN DESCRIBED IN THE USO-CLV-SE-25704 US DESIGN DEFINITION DOCUMENT (DDD) IS THE BASELINE DESIGN FOR THIS CONTRACT. THE CONTRACTORS EARLY ROLE WILL BE TO PROVIDE PRODUCIBILITY ENGINEERING SUPPORT TO NASA VIA THE ESTABLISHED US OFFICE STRUCTURE AND TO PROVIDE INPUTS INTO THE FINAL DESIGN CONFIGURATION, SPECIFICATIONS, AND STANDARDS. NASA WILL TRANSITION THE MANUFACTURING AND ASSEMBLY, LOGISTICS SUPPORT INFRASTRUCTURE, CONFIGURATION MANAGEMENT, AND THE SUSTAINING ENGINEERING FUNCTIONS TO THE CONTRACTOR AT THE KEY POINTS DURING THE DEVELOPMENT AND IMPLEMENTATION OF THE PROGRAM CURRENTLY PLANNED TO OCCUR NO LATER THAN 90 DAYS AFTER THE COMPLETION OF THE FOLLOWING MAJOR MILESTONES: MANUFACTURING AND ASSEMBLY US PRELIMINARY DESIGN REVIEW (PDR) LOGISTICS SUPPORT INFRASTRUCTURE US PDR CONFIGURATION MANAGEMENT US CRITICAL DESIGN REVIEW CDR) SUSTAINING ENGINEERING US DESIGN CERTIFICATION REVIEW (DCR) AFTER THE COMPLETION OF AN ORDERLY TRANSITION OF ROLES AND RESPONSIBILITIES TO THE CONTRACTOR, NASA WILL ASSUME AN INSIGHT ROLE INTO THE CONTRACTORS PRODUCTION, SUSTAINING ENGINEERING, AND OPERATIONS SUPPORT OF THE ARES I US TEST PROGRAM AND FLIGHT HARDWARE. AFTER DCR, THE CONTRACTOR WILL BE RESPONSIBLE FOR SUSTAINING ENGINEERING PER SOW SECTION 4.7, AS NECESSARY TO MAINTAIN AND SUPPORT THE US CONFIGURATION AND FOR PRODUCTION AND OPERATIONS SUPPORT.
National Aeronautics and Space Administration · $10,722,778,710 · Sep 1, 2007