ROCK-N-ROAD CONSTRUCTION, INC.
Federal contract awards won by ROCK-N-ROAD CONSTRUCTION, INC. (UEI LP4KLHJQHD94), 2021–2024 — public record from USAspending.
Showing awards of $250K+ active within the last 5 years. Need older history or smaller awards? Tell us what you need — we expand by request.
20
awards
$38,626,177
total value
1
agency
Agencies buying from ROCK-N-ROAD CONSTRUCTION, INC.
What ROCK-N-ROAD CONSTRUCTION, INC. sells
Awards
GAOA TONGASS DOCKS AND MARINE INFRASTRUCTURE REPAIRS: FALSE ISLAND REMOTE DOCK
Department of Agriculture · $337,200 · Sep 26, 2024
GAOA TONGASS DOCKS AND MARINE INFRASTRUCTURE REPAIRS: KMRD REMOTE DOCK
Department of Agriculture · $835,677 · Sep 26, 2024
GAOA - WORK IS TO IMPROVE THREE CAMPSITES AND ACCESS ROAD DEVELOP ADDITIONAL PARKING INSTALL PAY STATION, 1 VAULT TOILET, 1 DAY USE PICNIC SHELTER AND RELATED AMENITIES, AND REPAIR EXISTING DOCK FACILITIES.
Department of Agriculture · $993,453 · Jun 28, 2024
DEWATERING, EXCAVATION, ROCK EXCAVATION, INSTALLATION OF STRUCTURES, DEVELOPMENT OF QUARRY, BORROW MATERIAL FROM NEARBY QUARRY FOR MATERIAL, HAUL, RECONSTRUCTING STREAMBED AND BANKS WITH INSTREAM ROCK STRUCTURES, BACKFILL, AND SOIL EROSION CONTROL
Department of Agriculture · $314,670 · May 17, 2024
GAOA HOONAH ROAD, AOP IMPROVEMENTS & BRIDGE RECON: 8502 MP 1.986 BRIDGE: HOONAH DOUBLE LANE BRIDGES PHASE TWO. REPLACE THE SINGLE LANE BRIDGE AT 8502 MP 1.986 WITH A LONGER DOUBLE LANE BRIDGE
Department of Agriculture · $2,223,500 · Nov 22, 2023
IIJA/BIL FALSE ISLAND AQUATIC ORGANISM PASSAGE RECONSTRUCTION: : THE PURPOSE OF THIS TASK ORDER FROM THE TONGASS MATOC (AOP) CONSTRUCTION PARENT CONTRACT IS TO REPLACE 2 UNDERSIZED CORRUGATED METAL PIPES WITH AOP DESIGNED STRUCTURES ON NFS ROAD 7540F
Department of Agriculture · $1,026,834 · Sep 28, 2023
BACKLOOP ROAD RECONDITIONING; COMPLETE RECONDITIONING OF 5.15 MILES OF ROADWAY. THIS PROJECT WILL ALSO INVOLVE DEVELOPING A MATERIAL SOURCE, CRUSHING, HAULING, PLACING AND COMPACTION OF SURFACE BASE AGGREGATE AND INSTALLING MULTIPLE NEW CULVERTS.
Department of Agriculture · $674,060 · Sep 25, 2023
GAOA HOONAH ROAD, AOP IMPROVEMENTS & BRIDGE RECON: 8502 MP 3.478 BRIDGE; REMOVAL OF EXISTING BRIDGE AND CONSTRUCTION OF NEW 69' BRIDGE AND ABUTMENTS; RECONSTRUCTION OF ROAD FOR BRIDGE CONSTRUCTION
Department of Agriculture · $894,051 · Aug 22, 2023
AOP CULVERT REPLACEMENT NFSR 2030790 MP 1.08
Department of Agriculture · $298,780 · Aug 7, 2023
TONGASS NATIONAL FOREST - GAOA ROOSEVELT HARBOR DOCK REPAIR
Department of Agriculture · $276,176 · Aug 2, 2023
GAOA PRINCE OF WALES ISLAND POLK ROAD AOP 2100 MP 12.53 IS A NEW CONSTRUCTION CONTRACT ACTION WHICH ENTAILS THE REMOVAL AND DISPOSAL OF AN EXISTING CMP ON ROAD 2100 MP 12.53 AND REPLACE WITH A 60' LENGTH STEEL MODULAR BRIDGE. RECONSTRUCTING THE
Department of Agriculture · $586,039 · Jul 6, 2023
GAOA TONGASS NF DOCK: SITKA AND PETERSBURG MARINE FACILITIES
Department of Agriculture · $687,668 · Jun 22, 2023
GAOA ZAREMBO ISLAND BOAT LAUNCH, ROAD RECONSTRUCTION, AOPS & ST JOHNS BRIDGE- ST JOHNS BRIDGE REPLACEMENT- REPLACE A 80' BRIDGE WITH A 112 ' BRIDGE ON ROAD 6290 AT MP1.1
Department of Agriculture · $1,047,442 · Jun 16, 2023
THE SCOPE OF THIS MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING TYPES OF HIGHWAY, STREET, AND BRIDGE CONSTRUCTION. THE WORK PERFORMED MAY INCLUDE NEW WORK, ADDITIONS, ALTERATIONS, MAINTENANCE, AND REPAIRS.
Department of Agriculture · $25,000,000 · Dec 12, 2022
STANEY CREEK AQUATIC ORGANISM PASSAGE CONSTRUCTION CONSISTS OF REMOVING EXISTING CULVERTS ON ROAD 2050 AT MP 10.36 AND 14.69 AND REPLACE WITH A NEW DESIGNED AQUATIC ORGANISM PASSAGE STRUCTURE AND THE CONSTRUCTION OF A NEW SIMULATED STREAMBED.
Department of Agriculture · $800,340 · Sep 15, 2022
BACK LOOP AQUATIC ORGANISM PASSAGE CONSTRUCTION CONSISTS OF REMOVING EXISTING CULVERT ON ROAD 3030110 AT MP 0.28 AND REPLACE WITH A 49 STEEL BRIDGE AND THE CONSTRUCTION OF A NEW SIMULATED STREAMBED. ALSO, THE REMOVAL OF AN EXISTING CULVERT ON ROAD 30
Department of Agriculture · $804,530 · Sep 15, 2022
HOONAH ERFO AOP STREAM CROSSING IMPROVEMENTS
Department of Agriculture · $413,925 · Aug 15, 2022
GAOA CENTRAL PRINCE OF WALES ROAD IMPROVEMENTS: 2051 MP 1.42 AOP REMOVE EXISTING STRUCTURAL PLATE 15'5 SPAN X 105 RISE AND REPLACE WITH A 60 FEET LONG 4 GIRDER STEEL BRIDGE. RECONSTRUCT STREAM WITH STREAM SIMULATION ROCK FOR AQUATIC PASSAGE.
Department of Agriculture · $412,600 · Jun 21, 2022
THE PETERSBURG RANGER DISTRICT OF THE TONGASS NATIONAL FOREST REHABILITATION OF APPROXIMATELY 0.6 MILES OF STREAM CORRIDOR AND THE ADJOINING FLOODPLAIN ON EAST OHMER CREEK, NORTH AND SOUTH FORKS OF LUMPY CREEK (TRIBUTARIES TO EAST OHMER), AND A SMALL
Department of Agriculture · $405,316 · Sep 10, 2021
REMOVAL OF THE MARINE ACCESS FACILITY; COUVERDEN/HOMESHORE MARINE ACCESS FACILITY BULKHEAD AND A LARGE PORTION OF THE CAUSEWAY. THE END PRODUCT WILL BE A DRIVABLE RAMP FOR EQUIPMENT AND BARGE LOADING
Department of Agriculture · $593,917 · Aug 19, 2021
Researching this competitor? BidCatch doesn't just show you what they won — it sends you the open bids in your trade every morning, before they're awarded. Free for 14 days, then $49.99/month.
Search open bids