REDSTONE DEFENSE SYSTEMS
Federal contract awards won by REDSTONE DEFENSE SYSTEMS (UEI SQVHYKHN43H5), 2013–2018 — public record from USAspending.
Showing awards of $250K+ active within the last 5 years. Need older history or smaller awards? Tell us what you need — we expand by request.
18
awards
$196,053,296
total value
1
agency
Agencies buying from REDSTONE DEFENSE SYSTEMS
What REDSTONE DEFENSE SYSTEMS sells
Awards
ORDER FOR STATEMENT OF WORK RECOVERY OF AIRBASE DENIED ORDNANCE PHASE 2.
Department of Defense · $1,780,667 · Nov 30, 2018
THE PROTOTYPE INTEGRATION FACILITY (PIF) HAS A REQUIREMENT TO ISSUE ORDER 0768 AGAINST CONTRACT W58RGZ-12-D-0089. THIS EFFORT WILL PROVIDE THIRTY (30) ALL UP ROUND BALLASTS, GRADE B (AURBB) AND AN OPTION FOR AN ADDITIONAL TWENTY (20) AURBB.
Department of Defense · $9,561,423 · Aug 15, 2018
THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE 60 KVA GENERATOR KITS IAW DRAWING NUMBER 1071704.
Department of Defense · $15,557,186 · Aug 1, 2018
THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE SIXTEEN (16) CENTER CELL ACCESS PORT (CCAP), AND AN OPTION FOR AN ADDITIONAL TWENTY (20) CENTER CELL ACCESS PORT (CCAP).
Department of Defense · $4,235,930 · Jul 3, 2018
THIS STATEMENT OF WORK (SOW) ADDRESSES THE REQUIREMENTS FOR THE PATRIOT ADVANCED CAPABILITY-3 (PAC-3) MISSILE SEGMENT ENHANCEMENT (MSE) ROUND TRAINER AND PATRIOT T-BOXES. THE CONTRACTOR SHALL BASELINE THE TOOLING RATE ASSEMBLY TECHNICAL DATA PACKAGE (TDP).
Department of Defense · $28,057,140 · Jul 2, 2018
THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, PROVISIONING, KITTING, AND DELIVERY OF MULTIPLE APACHE MISSION ESSENTIAL PACKAGES (MEPS), MODIFICATION KITS AND APACHE PARTS.
Department of Defense · $13,553,193 · May 22, 2018
AVIATION GROUND SUPPORT EQUIPMENT (AGSE) IDENTIFIED IN APPENDIX C IN SUPPORT OF AFGHAN FOREIGN MILITARY SALES (FMS) CASE W5-B-UAQ.
Department of Defense · $27,893,937 · May 22, 2018
PIF CONTRACT
Department of Defense · $7,414,550 · May 2, 2018
THIS SOW DEFINES THE EFFORT REQUIRED FOR THE NON-RECURRING ENGINEERING (NRE), FABRICATION, ASSEMBLY, AND KITTING OF 225 CH-47F AN/AVR-2B A-KITS
Department of Defense · $12,390,526 · Nov 21, 2017
IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE THIRTY (30) PATRIOT DUAL TELEMETRY KITS.
Department of Defense · $3,212,916 · Sep 28, 2017
IGF::OT::IGF, THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE RADBO PRODUCT LEVEL DRAWINGS AND ENGINEERING SUPPORT TO THE DIRECTED ENERGY WEAPONS (DEW) BOARD AND CYBERSECURITY IPT.
Department of Defense · $3,041,030 · May 11, 2017
IGF::OT::IGF, TO 658, OEP 19288, "PROVIDE AVIATION GROUND SUPPORT EQUIPMENT (AGSE) IN SUPPORT OF FOREIGN MILITARY SALES (FMS) CASES LO-B-UCI AND KS-B-ZCV FOR SLOVAKIA AND KOREA."
Department of Defense · $6,312,630 · May 3, 2017
IGF::OT::IGF V-22 OSPREY MISSION COMPUTER OBSOLESCENCE THIS EFFORT IS REQUIRED TO SUPPORT PMA-275 FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, KITTING, DELIVERY, AND INSTALLATION OF MISSION COMPUTER OBSOLESCENCE INITIATIVE (MCOI) RETROFIT KITS AND COMMON AIRCRAFT PORTABLE REPROGRAMMING EQUIPMENT (CAPRE) GBE FILLPORT KITS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS.
Department of Defense · $9,458,884 · Mar 22, 2017
OEP 14746
Department of Defense · $11,348,424 · May 13, 2013
TASK ORDER 0092, $886,486, "NAVO N9 OPS."
Department of Defense · $1,221,187 · Mar 7, 2013
Researching this competitor? BidCatch doesn't just show you what they won — it sends you the open bids in your trade every morning, before they're awarded. Free for 14 days, then $49.99/month.
Search open bids