QUALTECH SYSTEMS, INC.

Federal contract awards won by QUALTECH SYSTEMS, INC. (UEI T2RXVVH2H735), 2019–2025 — public record from USAspending.

Showing awards of $250K+ active within the last 5 years. Need older history or smaller awards? Tell us what you need — we expand by request.

15
awards
$20,144,254
total value
2
agencies

Awards

PHASE II SBIR - FAULT MANAGEMENT ARCHITECTURE FOR DISTRIBUTED SYSTEMS
National Aeronautics and Space Administration · $899,916 · Jul 1, 2025
SBIR PHASE III - ROSETTA - SOFTWARE AND MODEL DEPLOYMENT, DEVELOPMENT AND V&V SUPPORT
National Aeronautics and Space Administration · $500,000 · Sep 4, 2024
SBIR PHASE II - TEAMS FAULT MANAGEMENT EXTENSION FOR STATE-BASED DESIGN AND SIMULATION
National Aeronautics and Space Administration · $899,911 · Jun 10, 2024
RESEARCH AND DEVELOPMENT
Department of Defense · $999,983 · Jul 19, 2023
E014042 SBIR PHASE III ROSETTA SOFTWARE AND MODEL DEPLOYMENT, DEVELOPMENT AND V&V SUPPORT
National Aeronautics and Space Administration · $349,542 · Sep 9, 2022
RESEARCH AND DEVELOPMENT
Department of Defense · $1,999,407 · Sep 16, 2020
ROBUST SYSTEM HEALTH MANAGEMENT FOR DEEP SPACE MISSIONS
National Aeronautics and Space Administration · $4,251,742 · Sep 10, 2020
RESEARCH AND DEVELOPMENT
Department of Defense · $1,999,479 · Aug 10, 2020
TEAMS FAULT MANAGEMENT EXTENSION FOR SYSML
National Aeronautics and Space Administration · $759,449 · Jun 11, 2020
RESEARCH AND DEVELOPMENT
Department of Defense · $999,443 · Sep 20, 2019
QUALTECH SYSTEMS, INC. (QSI), IN COLLABORATION WITH DR. STEPHEN B. JOHNSON, PRESIDENT OF DEPENDABLE SYSTEM TECHNOLOGIES, LLC (DST), PLAN TO DEVELOP TECHNIQUES AND THE CONCOMITANT SOFTWARE MODULES FOR ENABLING MODELING AND VISUALIZATION IN QSI S TEAMS TOOLSET TO REPRESENT THE ENTIRE FM DESIGN AS PART OF A SYSTEM DESIGN. THE MAIN OBJECTIVE OF THE PROPOSED EFFORT IS TO HAVE TEAMS COMPLETE THE CONTROL LOOP IN TERMS OF INCORPORATING THE RESPONSE (THE R IN FDIR) LOOPS AS PART OF ITS DESIGN AND ANALYSES OF FM ARCHITECTURE. THIS WILL INCLUDE IMPROVEMENTS TO ADDRESS FM METRICS FOR FAILURE RESPONSE/RECOVERY, AND WILL BE LINKED TO ONGOING EFFORTS TO IMPLEMENT FM METRICS AND TO OVERALL SYSTEM AUTONOMY, BUT TARGETING SMD SCIENCE MISSIONS AND THEIR UNIQUE GOALS. THE PROPOSED EFFORT WILL RESULT IN A NOVEL CAPABILITY THAT INCORPORATES THE RECOVERY ASPECT OF FDIR WITHIN TEAMS AND ENABLES FM VISUALIZATION OF DESIGN ARCHITECTURES, WHICH THEN LINKS TO A CLEAR AND CONCISE SET OF FM METRICS TO MINIMIZE MISSION RISKS TO DESIRED LEVELS. TEAMS CAN LEVERAGE BUILT-IN MODELING FEATURES FOR PERFORMING FM ARCHITECTURE DESIGN ASSESSMENT, SUCH AS FAULT TREES AND FM METRICS RELATED TO FAILURE DETECTION AND ISOLATION. SWITCHES IN TEAMS MODELS FACILITATE THEIR USE IN MULTIPLE SYSTEM MODES. THIS FEATURE WILL BE LEVERAGED TO ENABLE RECOVERY LOOPS ACROSS MULTIPLE SCENARIOS. THE PROPOSED EFFORT SEEKS TO AID THE VISUALIZATION AND ASSESSMENT OF FM DESIGN FOR SYSTEM(S) IN MULTIPLE USAGE SCENARIOS BY UTILIZING EXISTING CAPABILITIES AND INTRODUCING NEW CAPABILITIES TO TEAMS FOR THE COMPUTATION AND EVOLUTION OF RELEVANT FM ANALYSES. THE ADDED CAPABILITIES INCLUDE INFORMATION INTEGRATION EXTENDING THE SYSTEM MODELING CAPABILITIES AND ASSESSING THE EFFECT OF IMPLEMENTING DIAGNOSTIC DECISIONS ON THE OVERALL FUNCTIONALITY OF THE SYSTEM.
National Aeronautics and Space Administration · $754,972 · Jul 17, 2019

Researching this competitor? BidCatch doesn't just show you what they won — it sends you the open bids in your trade every morning, before they're awarded. Free for 14 days, then $49.99/month.

Search open bids