LOCKHEED MARTIN CORPORATION

Federal contract awards won by LOCKHEED MARTIN CORPORATION (UEI HDHVQ4EF8A89), 1997–2026 — public record from USAspending.

Showing awards of $250K+ active within the last 5 years. Need older history or smaller awards? Tell us what you need — we expand by request.

19
awards
$1,839,331,807
total value
3
agencies

Awards

HABITABLE WORLDS OBSERVATORY SYSTEM TECHNOLOGY DEMONSTRATIONS AND MISSION ARCHITECTURE STUDIES
National Aeronautics and Space Administration · $16,945,134 · May 13, 2026
NOAA/OMAO_PRODUCTION OF UP TO FOUR (4) FULLY MODIFIED C130J AIRCRAFT
Department of Commerce · $333,509,508 · Sep 30, 2024
TECHNOLOGY MATURATION FOR ASTROPHYSICS SPACE TELESCOPES (TECHMAST)
National Aeronautics and Space Administration · $4,959,424 · Sep 20, 2024
KILLERWHALE
Department of Defense · $1,503,873 · Jul 24, 2024
SPACE WIRELESS ON-DEMAND OPTICAL POWER (SWOOP)
Department of Defense · $2,999,690 · Mar 25, 2024
HIGH ENERGY LASER SYSTEM ATMOSPHERIC LIDAL (HELSAL)
Department of Defense · $498,769 · Aug 30, 2022
EO14042 EUVST - PHASE B
Department of Defense · $7,237,214 · Dec 15, 2021
RESEARCH AND DEVELOPMENT OF MARS VACUUM ANNULUS CRYOGENIC SYSTEM (MARVACS)
National Aeronautics and Space Administration · $333,891 · May 20, 2021
MULTI-SLIT SOLAR EXPLORER (MUSE) MISSION PHASE A
National Aeronautics and Space Administration · $105,313,213 · Apr 26, 2021
THE CONTRACTOR SHALL PROVIDE A PROTOFLIGHT HARDWARE UNIT AND SPARE COMPONENTS FOR THE VIPER-NSS MISSION.
National Aeronautics and Space Administration · $2,893,130 · Jun 25, 2020
ANALYSIS OF SECCHI
Department of Defense · $583,296 · Aug 27, 2019
INTERFACE REGION IMAGING SPECTROGRAPH (IRIS). THE CONTRACTOR SHALL REFINE AND EVOLVE THE CONTRACTOR'S COST ESTIMATE FOR PHASES B-F FOR THE INTERFACE REGION IMAGING SPECTROGRAPH (IRIS) MISSION SUBMITTED IN RESPONSE TO NASA ANNOUNCEMENT OF OPPORTUNITY #NNH07ZDA003O FOR THE EXPLORERS PROJECTS DIVISION. THE PRIMARY TASKS IN PHASE B WILL INCLUDE THE GENERATION AND PRESENTATION OF THE SYSTEMS REQUIREMENTS REVIEW (SRR) AND THE PRELIMINARY DESIGN REVIEW (PDR). IN ORDER TO SUPPORT THESE REVIEWS, THE CONCEPT DEFINITION EFFORTS SHALL ENCOMPASS THE WORK REQUIRED TO UPDATE AND REFINE THE PROPOSAL'S SCIENCE INVESTIGATION OBJECTIVES AND PLANS (IF NECESSARY), INSTRUMENT AND SPACECRAFT CONCEPTS AND PERFORMANCE CHARACTERISTICS, AND SCIENCE OPERATIONS AND FLIGHT OPERATIONS PLANS AND CONCEPTS. THESE EFFORTS SHALL IDENTIFY THE CONDITIONS AND CONSTRAINTS NECESSARY FOR THE DEVELOPMENT OF AN INTEGRATED IRIS MISSION APPROACH. THE CONTRACTOR'S MISSION INTEGRATION EFFORTS SHALL INCLUDE CONSIDERATIONS FOR THE ACCOMMODATION OF THE IRIS OBSERVATORY ONTO THE LAUNCH VEHICLE. THE CONTRACTOR'S PHASE B PRELIMINARY DESIGN EFFORTS SHALL DEVELOP THE CSR AND SITE VISIT CONCEPTS INTO A PRELIMINARY DESIGN AND DEFINITION OF THE IRIS MISSION, INCLUDING ITS MISSION OPERATIONS CENTER (MOC) AND SCIENCE OPERATIONS CENTER (SOC). THE PRELIMINARY DESIGN REVIEW (PDR) SHALL BE HELD IN ACCORDANCE WITH NPR 7120.5D, NPR 7123.1A, AND GSFC STD 1001B. THE CONTRACTOR'S EFFORTS IN PHASE B SHALL FORM THE BASIS FOR FINAL ATION OF THE REMAINDER OF THE IRIS DEVELOPMENT AND OPERATIONAL PHASES (C, D, E AND F). DETAILED COST AND SCHEDULE ESTIMATES SHALL BE PREPARED AND SUBMITTED DURING PHASE B, WHICH DEFINES THE CONTRACTOR'S UPDATED BUDGET FOR PHASE B AND THE PLANNED BUDGETS FOR PHASE C, D, E AND F WORK. PERIODIC TECHNICAL AND PROGRAMMATIC INTERCHANGE MEETINGS AT BOTH THE CONTRACTOR'S FACILITY AND AT GSFC SHALL BE REQUIRED TO COORDINATE EFFORTS BETWEEN THE CONTRACTOR AND THE EXPLORERS PROJECTS OFFICE. THESE MAY BE CONDUCTED AS FACE-TO-FACE MEETINGS OR TELECONFERENCES, AS REQUIRED.
National Aeronautics and Space Administration · $198,849,969 · Oct 1, 2009
TAS::80 0114::TAS SOLAR ULTRAVIOLET IMAGER (SUVI) INSTRUMENT. THIS CONTRACT IS FOR THE DESIGN, ANALYZE, DEVELOP, FABRICATE, INTEGRATE, TEST, EVALUATE AND SUPPORT LAUNCH OF THE SOLAR ULTRAVIOLET IMAGER (SUVI) INSTRUMENT, SUPPLY AND MAINTAIN THE INSTRUMENT GROUND SUPPORT EQUIPMENT (GSE), AND SUPPORT THE SATELLITE OPERATIONS CONTROL CENTER (SOCC). THE SUVI IS CLASSIFIED AS A NON-PRIMARY INSTRUMENT ON THE GOES-R SATELLITE AND HAS A RISK CLASSIFICATION OF B. THE SUVI INSTRUMENT PROVIDES A BROADBAND IMAGING IN THE EXTREME ULTRAVIOLET WAVELENGTH RANGE TO MONITOR THE ENTIRE DYNAMIC RANGE OF SOLAR FEATURES, FROM CORONAL HOLES TO FLARES, AS WELL AS THE ESTIMATE OF TEMPERATURE AND EMISSION MEASURE. THESE DATA ARE USED FOR GEOMAGNETIC STORM FORECASTS AND FORECASTS OF SOLAR ENERGETIC PARTICLE EVENTS RELATED TO FLARES. THE CONTRACTOR SHALL PROVIDE THE PERSONNEL, MATERIALS, FACILITIES AND OTHER RESOURCES TO DESIGN, DEVELOP, DELIVER AND SUPPORT UNDER THE BASIC CONTRACT: A) PARTS AND MATERIALS FOR 4 FLIGHT MODELS B) ONE SUVI FLIGHT MODEL (FM) C) THREE SETS OF THE ELECTRICAL SYSTEM TEST EQUIPMENT (ESTE) D) TWO SUVI EMULATORS (SUVIES) E) TWO FLIGHT SOFTWARE DEVELOPMENT ENVIRONMENTS (FSDES) F) ONE GROUND PROCESSING DEVELOPMENT SYSTEM (GPDS) G) SPARES FOR THE FOUR FMS H) ALL ADDITIONAL SUVI MECHANICAL AND ELECTRICAL GROUND SUPPORT EQUIPMENT (MGSE AND EGSE) CALLED OUT ELSEWHERE IN THIS DOCUMENT I) ALL ITEMS AND DOCUMENTS SPECIFIED IN ALL CONTRACT DOCUMENTS
National Aeronautics and Space Administration · $331,119,863 · Sep 24, 2007
FOCAL PLANE PACKAGE MISSION OPERATIONS AND DATA ANALYSIS - SOLAR B PHASE E
National Aeronautics and Space Administration · $64,430,179 · Feb 22, 2007
TAS::80 0114::TAS THE ATOMOSPHERIC IMAGE ASSEMBLY
National Aeronautics and Space Administration · $136,523,034 · Nov 4, 2003
SOLAR X-RAY IMAGER INSTRUMENT
National Aeronautics and Space Administration · $105,608,031 · Jun 15, 1997

Researching this competitor? BidCatch doesn't just show you what they won — it sends you the open bids in your trade every morning, before they're awarded. Free for 14 days, then $49.99/month.

Search open bids