KOMAN SUSTAINABLE SOLUTIONS, LLC
Federal contract awards won by KOMAN SUSTAINABLE SOLUTIONS, LLC (UEI YYHUS62QE615), 2022–2026 — public record from USAspending.
Showing awards of $250K+ active within the last 5 years. Need older history or smaller awards? Tell us what you need — we expand by request.
70
awards
$296,370,908
total value
3
agencies
Agencies buying from KOMAN SUSTAINABLE SOLUTIONS, LLC
What KOMAN SUSTAINABLE SOLUTIONS, LLC sells
238220 — PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS (27)236220 — COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION (23)236210 — INDUSTRIAL BUILDING CONSTRUCTION (8)531120 — LESSORS OF NONRESIDENTIAL BUILDINGS (EXCEPT MINIWAREHOUSES) (6)238990 — ALL OTHER SPECIALTY TRADE CONTRACTORS (2)238160 — ROOFING CONTRACTORS (1)237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION (1)337214 — OFFICE FURNITURE (EXCEPT WOOD) MANUFACTURING (1)541512 — COMPUTER SYSTEMS DESIGN SERVICES (1)
Awards
569262 - FIBER TO BARRACKS EMCS, FORT CARSON, CO SBA ACCEPTANCE S SP1753888663J
Department of Defense · $2,344,078 · Mar 30, 2026
BUILDING LR-167 LEASE OPTION YEAR 1 FUNDING TASK ORDER
Department of Defense · $1,520,267 · Jan 14, 2026
DE05092-0P B44401 REPAIR RCX
Department of Defense · $1,776,462 · Sep 29, 2025
PKB - B398 REPAIR MOTOR GENERATOR SET AND CONTROL PANEL
Department of Defense · $298,107 · Sep 22, 2025
BUILDING 399 POWER DISTRIBUTION UNITS (PDUS) ARE AT THE END OF THEIR LIFE CYCLE. CUSTOMER REQUESTS TO REPLACE TWO (2) PDUS IN THE WHITE HOUSE COMMUNICATIONS AGENCY IN ROOM 204I AND 204K.
Department of Defense · $299,343 · Sep 22, 2025
PKB - BUILDING MANAGEMENT SYSTEM UPGRADE B399
Department of Defense · $1,048,549 · Sep 22, 2025
THE PURPOSE OF THIS PROJECT IS TO REPAIR 11 CES METER PITS IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW).
Department of Defense · $369,496 · Sep 15, 2025
PKB - THIS PROCUREMENT REQUIRES THE REMOVAL AND REPLACEMENT OF ONE (1) AIR HANDLING UNIT (AHU), AHU #19 SERVING ROOMS 230 AND 230A LOCATED ON THE SECOND FLOOR OF BUILDING 399, IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW).
Department of Defense · $762,942 · Sep 1, 2025
PKB-B47 REPLACE HVAC COILS AND DAMPER MOTOR
Department of Defense · $324,085 · Aug 21, 2025
B399 - REPLACE HVAC UNITS 2-5 PHASE 2
Department of Defense · $758,663 · Aug 6, 2025
PROVIDE ALL NECESSARY WORK NEEDED TO MEET CURRENT MISSION REQUIREMENTS AS OUTLINED IN THIS STATEMENT OF WORK (SOW).
Department of Defense · $444,738 · Apr 28, 2025
PKB - DEMOLISH AND REPLACE EXISTING BOILERS AND HVACS IN B353/354, AND 355 IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW).
Department of Defense · $436,159 · Apr 17, 2025
BASE PERIOD - RECURRING LR167 LEASE
Department of Defense · $1,520,267 · Jan 14, 2025
PKB - INSTALLATION OF TEMPORARY BOILER AT B20 JOINT BASE ANACOSTIA BOLLING FOLLOWED BY FULL BOILER AND PUMP REPLACEMENT.
Department of Defense · $727,325 · Dec 11, 2024
810043G-2P BLDG. 900 REPLACE COOLING
Department of Defense · $2,441,102 · Oct 3, 2024
RENOVATE ROOMS 141,142, AND RESTROOMS IN FACILITY 415 (BASE EXCHANGE) IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW).
Department of Defense · $289,816 · Oct 1, 2024
PKB-THE PROCUREMENT REQUIRES THE REPLACEMENT OF EXISTING 12-INCH AND 8-INCH DOMESTIC WATER LINES AND VALVES ON THE WEST SIDE OF B168 WITH C900 PIPING, IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW).
Department of Defense · $640,194 · Sep 11, 2024
PKB-PROJECT TITLE: MINI JOC VII ELECTRICAL, PLUMBING, HEATING, AC IDIQ
Department of Defense · $10,000,000 · Sep 11, 2024
PKB - B3617 INSTALL CHILLER AND REPLACE PUMPS AND HVU
Department of Defense · $820,144 · Sep 9, 2024
PKB-THE DEMO AND REPLACEMENT OF THREE (3) ROOFTOP AIR HANDLING UNITS FROM THE SITE AT B418 IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW).
Department of Defense · $283,071 · Sep 6, 2024
PKB - CONTRACTOR SHALL REMOVE AND REPLACE FOUR (4) AIR HANDLING UNITS (AHUS) ON THE FIRST FLOOR OF BUILDING 399 IN ACCORDANCE WITH (IAW) THE STATEMENT OF WORK (SOW).
Department of Defense · $563,369 · Sep 5, 2024
PROVIDE ALL NECESSARY WORK NEEDED TO RENOVATE THE FACILITY TO MEET CURRENT MISSION REQUIREMENTS AS OUTLINED IN ACCORDANCE WITH THE STATEMENT OF WORK (SOW).
Department of Defense · $1,095,050 · Aug 29, 2024
PKB - PROVIDE ALL NECESSARY WORK NEEDED TO RENOVATE THE FACILITY TO MEET CURRENT MISSION REQUIREMENTS, TO COMPLETE THE REPLACEMENT OF THE HVAC SYSTEM B417 JBAB AS OUTLINED IN THE STATEMENT OF WORK (SOW)
Department of Defense · $2,869,540 · Jul 31, 2024
Researching this competitor? BidCatch doesn't just show you what they won — it sends you the open bids in your trade every morning, before they're awarded. Free for 14 days, then $49.99/month.
Search open bids