HEALTH, EDUCATION AND RESEARCH ASSOCIATES, INC.

Federal contract awards won by HEALTH, EDUCATION AND RESEARCH ASSOCIATES, INC. (UEI CNRUY7QK1FN4), 2017–2019 — public record from USAspending.

Showing awards with a value or ceiling of $250K+ active within the last 5 years. Need older history or smaller awards? Tell us what you need — we expand by request.

10
awards
1
expiring in 12 months
1
agency

Teaming snapshot

teams under 2 primes.

From subcontract reports primes file with USAspending/FSRS.

Category award history

9 category awards to a new vendor (same agency and NAICS code, not this contract's own history) — latest: CIVIL DESIGN & ENGINEERING INC took Department of Health and Human Services 541330 work from HEALTH, EDUCATION AND RESEARCH ASSOCIATES, INC. (May 31, 2025).

Agencies buying from HEALTH, EDUCATION AND RESEARCH ASSOCIATES, INC.

What HEALTH, EDUCATION AND RESEARCH ASSOCIATES, INC. has provided

Awards

IGF::OT::IGF C105112 - AE SERVICES - BLDG. 35 - REPLACE WATER PIPING, BETHESDA, MD.
Department of Health and Human Services · $461,095 · Aug 15, 2018
IGF::OT::IGF - ("OTHER FUNCTIONS") C105883 - DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD - ARCHANA BHASIN THE CONTRACTOR SHALL PROVIDE THE LABOR, MATERIALS, EQUIPMENT, AND SUPERVISION TO ACCOMPLISH THE FOLLOWING: BASE: DESIGN SERVICES FOR BUILDING 10 CRC SUITE B2-3701 - ELECTRON MICROSCOPY CORE, NHLBI, NIH CAMPUS, BETHESDA, MD: BASE: $329,098.22 ACCEPTED OPTIONS: D. CHANGE ORDER REVIEW DURING POST-DESIGN AS PROPOSED BY HERA $1,452.50 AWARDED WITH BASE OPTIONS NOT REQUESTED, AND PROVIDED BY CONTRACTOR: OPTION 1 (ALTERNATE 1) - ADDITIONAL ON-BOARD DESIGN REVIEW. EXPECTED AWARD DATE IS 120 DAYS AFTER ISSUING NTP. $3,496.34 OPTION 2 (ALTERNATE 2) - ADDITIONAL POST-DESIGN CONFERENCE CALLS. EXPECTED EXERCISE DATE IS 330 DAYS AFTER ISSUING NTP. $10,505.86 OPTIONS NOT ACCEPTED: A. COST ESTIMATE AT 65% CONSTRUCTION DOCUMENTS. $9,662.28 B. CREDIT TO 100% CD COST ESTIMATE IF 65% COST ESTIMATE IS ACCEPTED. -$2,690.60 C. COST ESTIMATE AT FINAL CDS. $4,136.98 OPTIONS TO THIS TASK ORDER WILL ONLY BE EXECUTED IF NIH DETERMINES THAT THE WORK IS NEEDED. THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE THE OPTIONS THROUGH A UNILATERAL MODIFICATION AT ITS OWN DISCRETION. POP: WORK TO BE PERFORMED: 08/03/2018 - 11/30/2019 TASK ORDER: 08/03/2018 - 02/28/2020 PRICE: BASE: $329,098.22 OPTION D: $1,452.50 TOTAL: $330,550.72 DELIVER TO: NIH CAMPUS, BLDG. 10, BETHMC PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLAN CAN # 8034167, NHLBI TAS::75 8 0872::TAS 08027220181DA0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.
Department of Health and Human Services · $547,319 · Aug 2, 2018
IGF::OT::IGF - TAS::75 0838::TAS - C104673 - TASK ORDER - AE SERVICES - MECHANICAL ROOMS ADDITION/UPGRADE, BUILDING 13, SUITES G2414A, G363A, G327,&B2 BASEMENT; HAKAN BARDAKCI; SEE ATTACHED SOW. BASE - PROVIDE PROFESSIONAL SERVICES FOR ALL ARCHITECTURAL AND ENGINEERING DISCIPLINES, MATERIAL AND LABOR NECESSARY TO PROVIDE A SET OF CONSTRUCTION DOCUMENTS TO FACILITATE THE CONSTRUCTION OF THE SUBJECT PROJECT. THIS PROJECT WILL ACCOMMODATE 4000 SF MECHANICAL ROOM SPACE WHICH WILL SUPPORT GENERAL PURPOSE LABORATORIES, BIO-SAFETY LEVEL LABORATORIES, SHARED ANALYTICAL LABORATORIES, AND SUPPORT SPACES. THE AE TEAM WILL NEED TO REVIEW ALL PROJECT'S HOT WATER, CHILLED WATER, DHW AND OTHER UTILITIES AND AIR DISTRIBUTION REQUIREMENTS AND WILL NEED TO PROPOSE A DESIGN TO ENSURE ALL PROJECT HAVE SUFFICIENT UTILITIES. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $427,787.99. 1. REVIEW OF AS-BUILT DRAWINGS. A. BEFORE DESIGN, THE A/E SHALL COMPILE AND REVIEW THE NECESSARY AS-BUILT DRAWINGS. THE A/E SHALL THEN FIELD VERIFY THE EXISTING CONDITIONS. 2. SUBMITTALS AND DELIVERABLE. A. THE A/E SHALL MAKE FOUR (5) DESIGN SUBMITTALS AT THE FOLLOWING STAGES: DESIGN DEVELOPMENT (35%), REVISED DESIGN DEVELOPMENT (35%), CONSTRUCTION DOCUMENTS (65%), CONSTRUCTION DOCUMENTS (100%), AND CONSTRUCTION DOCUMENTS (FINAL). B. PROVIDE AN UPDATED CONSTRUCTION SCHEDULE WITH EACH SUBMISSION. C. SEE NIH DRM FOR DETAILED REQUIREMENTS. 3. ATTEND PROGRESS/REVIEW/USER MEETINGS. 4. SURVEY ALL EXISTING CONDITIONS NECESSARY TO ACCOMPLISH THE PROJECT. A. THE A/E SHALL PERFORM FIELD SURVEYS THAT IDENTIFY EXISTING CONDITIONS TO ASCERTAIN ITEMS NECESSARY TO ACCOMPLISH THE PROJECT. THIS MAY INCLUDE MEASUREMENTS AND METERING OF THE EXISTING UTILITIES WITHIN THE SCOPE OF WORK PRIOR TO DEMOLITION, TO VERIFY THE DESIGN CONDITIONS WILL BE OBTAINABLE. THIS SOW SPECIFICALLY INCLUDES MINIMUM OF (5) DAYS OF I. ELECTRICAL METERING. II. ENGINEERING ANALYSIS. III. CHILLED WATER SUPPLY ANALYSIS. IV. PRE-DEMOLITION READINGS OF SUPPLY AND EXHAUST AIR ARE SPECIFICALLY REQUIRED. 5. PROVIDE AN UPDATED ESTIMATED CONSTRUCTION CONTRACT PRICE PER DESIGN DOCUMENT REVIEW SUBMISSION. 6. PROVIDE POST DESIGN CONSTRUCTION ADMINISTRATIVE SERVICES. A. CONSTRUCTION CONTRACTOR BID WALK ASSISTANCE. B. CONSTRUCTION INSPECTION. C. ATTEND PROGRESS MEETINGS. D. RESPONSES TO REQUEST FOR INFORMATION (RFIS). E. CONSTRUCTION SUBMITTAL REVIEW. F. REVIEW, TRACK, AND MAKE RECOMMENDATION FOR CONSTRUCTION CHANGE ORDERS. G. COMMISSIONING. THE PERIOD OF PERFORMANCE TO COMPLETE THE SCOPE OF WORK IS FROM 09/27/2017 TO 03/15/2019. DELIVER TO: NIH CAMPUS, BUILDING 13 PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS CAN # 8030643, ORF TAS::75 0838::TAS; 08023820175DB0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.
Department of Health and Human Services · $1,363,336 · Sep 25, 2017
IGF::OT::IGF - TAS::75 0838::TAS - C102574 - TASK ORDER - AE SERVICES - NINDS RENOVATION, BUILDING 13, SUITES G2406, G0408,G355, G363B, G363C, G363D, G363F, G6; HAKAN BARDAKCI; SEE ATTACHED SOW. BASE - PROVIDE PROFESSIONAL SERVICES FOR ALL ARCHITECTURAL AND ENGINEERING DISCIPLINES; MATERIAL AND LABOR NECESSARY TO PROVIDE A SET OF CONSTRUCTION DOCUMENTS TO FACILITATE THE CONSTRUCTION OF THE SUBJECT PROJECT. BASE IS PROPOSED FOR THE TOTAL AMOUNT OF $193,637.26. 1. REVIEW OF AS-BUILT DRAWINGS. A. BEFORE DESIGN, THE A/E SHALL COMPILE AND REVIEW THE NECESSARY AS-BUILT DRAWINGS. THE A/E SHALL THEN FIELD VERIFY THE EXISTING CONDITIONS. 2. SUBMITTALS AND DELIVERABLE. A. THE A/E SHALL MAKE SIX (6) DESIGN SUBMITTALS AT THE FOLLOWING STAGES: DRAFT PRELIMINARY REPORT (15%), FINAL PRELIMINARY REPORT (15%), DESIGN DEVELOPMENT (35%), CONSTRUCTION DOCUMENTS (65%), CONSTRUCTION DOCUMENTS (100%) AND CONSTRUCTION DOCUMENTS (FINAL). ALL CHANGES MADE BETWEEN THE 65% TO 100% SUBMISSION AND THE 100% TO THE FINAL SUBMISSIONS SHALL BE INDICATED BY THE A/E WITH A CLOUDED BUBBLE. B. SEE NIH DRM FOR DETAILED REQUIREMENTS. 3. ATTEND PROGRESS/REVIEW/USER MEETINGS. 4. SURVEY ALL EXISTING CONDITIONS NECESSARY TO ACCOMPLISH THE PROJECT. A. THE A/E SHALL PERFORM FIELD SURVEYS THAT IDENTIFY EXISTING CONDITIONS TO ASCERTAIN ITEMS NECESSARY TO ACCOMPLISH THE PROJECT. THIS MAY INCLUDE MEASUREMENTS AND METERING OF THE EXISTING UTILITIES WITHIN THE SCOPE OF WORK PRIOR TO DEMOLITION, TO VERIFY THE DESIGN CONDITIONS WILL BE OBTAINABLE. THIS SOW SPECIFICALLY INCLUDES MINIMUM OF (5) DAYS OF I. ELECTRICAL METERING. II. ENGINEERING ANALYSIS. III. CHILLED WATER SUPPLY ANALYSIS. IV. PRE-DEMOLITION READINGS OF SUPPLY AND EXHAUST AIR ARE SPECIFICALLY REQUIRED. 5. PROVIDE A PROFESSIONAL COST ESTIMATE AT THE 65% SUBMISSION, AND UPDATED COST ESTIMATE AT THE 100% AND FINAL SUBMISSIONS. OPTION 1 IS DEEMED NOT NECESSARY BY THE GOVERNMENT AND WILL NOT BE EXERCISED AT THIS TIME. PER THE SCOPE DISCUSSION WITH PO, IT IS DETERMINED THAT TASK IS NOT RELATED TO THE BASE AND THEREFORE IT IS A SEPARATE TASK. OPTION 1 IS PROPOSED FOR THE TOTAL AMOUNT OF $31,674.44. OPTION 1 - PROVIDE A/E SERVICES TO DESIGN A COMMON CORRIDOR THAT WILL BE CONNECTING TO ROOM G327 AND WILL CONNECT THIS NEW ARE TO THE OTHER COMMON CORRIDORS AND EXITS. OPTION 2 WILL BE EXERCISED IF AND WHEN THE NEED IS DETERMINED BY THE GOVERNMENT, AND FUNDS BECOME AVAILABLE. OPTION 2 IS PROPOSED FOR THE TOTAL AMOUNT OF $46,227.62. OPTION 2 - PROVIDE POST DESIGN CONSTRUCTION ADMINISTRATIVE SERVICES TO DESIGN A COMMON CORRIDOR THAT WILL BE CONNECTING TO ROOM G327 AND WILL CONNECT THIS NEW ARE TO THE OTHER COMMON CORRIDORS AND EXITS. A. CONSTRUCTION CONTRACTOR BID WALK ASSISTANCE. B. CONSTRUCTION INSPECTION. C. ATTEND PROGRESS MEETINGS. D. RESPONSES TO REQUEST FOR INFORMATION (RFIS). E. CONSTRUCTION SUBMITTAL REVIEW. F. REVIEW, TRACK, AND MAKE RECOMMENDATION FOR CONSTRUCTION CHANGE ORDERS. G. COMMISSIONING. OPTION 3 IS NOT ON THE SOW BUT PROPOSED BY THE CONTRACTOR, AND IT IS DEEMED NOT NECESSARY AT THIS TIME BY THE GOVERNMENT; THEREFORE IT IS NOT ACCEPTED. OPTION 3 IS PROPOSED FOR THE TOTAL AMOUNT OF $22,527.91. OPTION 3 - PROVIDE A/E SERVICES TO CONVERT THE STORAGE ROOM TO MECHANICAL SPACE. NOTE: SINCE OPTION 1 PER SOW IS REJECTED AND WILL NOT BE EXERCISED, OPTION 2 PER SOW WILL BECOME OPTION 1 ON THIS TASK ORDER. THE PERIOD OF PERFORMANCE TO COMPLETE THE SCOPE OF WORK IS FROM 09/25/2017 TO 01/27/2019. DELIVER TO: NIH CAMPUS, BUILDING 6B PRODUCT SERVICE CODE: C1JZ PRODUCT/SERVICE DESCRIPTION: ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS CAN # 8029709, ORF TAS::75 0838::TAS; 08023820175DB0 DUNS # 176126324 ALL OTHER TERMS&CONDITIONS REMAIN IN EFFECT.
Department of Health and Human Services · $289,330 · Sep 21, 2017