BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.
Federal contract awards won by BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC. (UEI Y4ZPM3CNMSQ6), 2019–2026 — public record from USAspending.
Showing awards of $250K+ active within the last 5 years. Need older history or smaller awards? Tell us what you need — we expand by request.
31
awards
$386,191,435
total value
2
agencies
Agencies buying from BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC.
What BRYANT'S LAND AND DEVELOPMENT INDUSTRIES, INC. sells
Awards
LAND MANAGEMENT INTEGRATED RESOURCES (LMIR) BPA
Department of Agriculture · $50,000,000 · Jul 23, 2026
CONTRACT FOR DISASTER RECOVERY SERVICES TO PROVIDE EMERGENCY REMOVAL AND DISPOSAL OF HAZARDOUS DEBRIS DEPOSITED FROM HURRICANE HELENE ON FEDERAL-OWNED LANDS AND WATERS AT MULTIPLE CRITICAL SITES ON THE CHEROKEE NATIONAL FOREST. DEBRIS INCLUDES HAZARD
Department of Agriculture · $961,102 · May 18, 2026
SOUTH-ATLANTIC REGION CONSTRUCTION MATOC: INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ) CONTRACT TO PERFORM SUBSEQUENT TASK ORDERS FOR HIGHWAY, STREET, AND/OR BRIDGE CONSTRUCTION SERVICES, POTENTIALLY WITH INCIDENTAL DESIGN SERVICES AND/OR DESIG
Department of Transportation · $60,000,000 · Apr 10, 2026
THE PROPOSED WORK INCLUDES EMERGENCY HAZARDOUS DEBRIS REMOVAL ON FEDERAL LANDS TO MANAGE IMMEDIATE THREATS TO PUBLIC HEALTH AND SAFETY, PROTECT THE LOCAL ECONOMY, AND MINIMIZE THE INTRODUCTION OF CONTAMINANTS INTO THE NEARBY WATERWAY. INCLUDES APPROP
Department of Agriculture · $2,821,082 · Mar 10, 2026
SOUTH REGION CONSTRUCTION MATOC: INDEFINITE DELIVERY, INDEFINITE QUANTITY (IDIQ) CONTRACT TO PERFORM SUBSEQUENT TASK ORDERS FOR HIGHWAY, STREET, AND/OR BRIDGE CONSTRUCTION SERVICES POTENTIALLY WITH INCIDENTAL DESIGN SERVICES AND/OR DESIGN-BUILD SE
Department of Transportation · $60,000,000 · Feb 10, 2026
PROJECT NC NP BLRI 2K13; NC NP BLRI 2K14 THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 316.4, 325.8 AND 325.9. THE WORK INCLUDES BRIDGE RAIL REPLACEMENT CONCRETE REPAIR, RIPRAP PLACEMENT, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, CULVER
Department of Transportation · $17,007,296 · Jan 6, 2026
EMERGENCY ROAD REPAIRS TO 1.73 MILES OF ROAN MOUNTAIN ROAD INCLUDING MILLING, PATCHING AND OVERLAYS.
Department of Agriculture · $607,738 · Aug 11, 2025
NC ERFO NP BLRI 2024-1(9) THE PROJECT CONSISTS OF ROADWAY EXCAVATION, EMBANKMENT CONSTRUCTION, CULVERT REPLACEMENT, PAVEMENT PATCHING, REESTABLISHING SLOPE, BACKFILLING WITH FALLEN SOIL, TURF ESTABLISHMENT AND TOPSOIL, STONE MASONRY WORK, AND OTHE
Department of Transportation · $2,631,167 · Jul 1, 2025
PROJECT NC NP GRSM 10S(1): THE PROJECT CONSISTS OF PLACING A THIN LIFT ASPHALT CONCRETE PAVEMENT OVERLAY ON NEWFOUND GAP ROAD FROM MP 20.9 TO 27.9, ASSOCIATED PARKING AREAS, AND PULL-OFFS. THE WORK INCLUDES PERFORMING ASPHALT PAVEMENT MICRO-MILLING
Department of Transportation · $4,704,100 · May 8, 2025
PROJECT TN NP GRSM 21(1): THE PROJECT CONSISTS OF ASPHALT CONCRETE PAVING OF COSBY GOVERNMENT QUARTERS AND RANGER STATION ACCESS ROAD. THE WORK INCLUDES REPLACING ROCK CREEK BOTTOMLESS ARCH/STRUCTURAL PLATE, DRAINAGE IMPROVEMENT, SHOULDER AND DITCH
Department of Transportation · $6,072,761 · Oct 31, 2024
NC MATOC ROAD MAINTENANCE AND CONSTRUCTION CONTRACT
Department of Agriculture · $49,999,000 · Sep 30, 2024
SACC II MULTIPLE AWARD INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) CONSTRUCTION CONTRACT - BRYANT'S LAND DEVELOPMENT
Department of Agriculture · $49,999,999 · Sep 10, 2024
PROJECT MS NP SER PMS FY23(2) THE PROJECT CONSISTS OF THE PAVEMENT PRESERVATION OF ROADWAYS AND PARKING AREAS. THE WORK INCLUDES PAVEMENT MICRO SURFACING; THIN-LIFT OVERLAY; FULL DEPTH PATCHING; AND OTHER MISCELLANEOUS WORK.
Department of Transportation · $1,450,035 · Sep 5, 2024
PROJECT LA ERFO FW SBN 2020-2(1) THE PROJECT CONSISTS OF THE REPAIR AND REPLACEMENT OF THE DAMAGED INFRASTRUCTURE CAUSED BY A SIGNIFICANT STORM EVENT IN AUGUST 2020. THE WORK INCLUDES BOTH DESIGN AND CONSTRUCTION WORK RELATED TO PLAN, DESIGN, MANA
Department of Transportation · $1,999,941 · Aug 6, 2024
PROJECT NP-GRSM 10N(3), 19(1), 107(1): SCHEDULE A - LAKEVIEW DRIVE EAST (SWAIN COUNTY, NC). WORK INCLUDES PERFORMING FULL DEPTH RECLAMATION WITH CEMENT STABILIZATION AND CONSTRUCTING ASPHALT CONCRETE PAVEMENT OF 6.41 MILES OF LAKEVIEW DRIVE EAST AN
Department of Transportation · $18,742,586 · May 25, 2023
PROJECT NP-BLRI PVT PRES FY 22(1): THE PROJECT CONSISTS OF THIN LIFT ASPHALT OVERLAY OF ROADWAYS, OVERLOOKS, AND PARKING AREAS ALONG THE BLUE RIDGE PARKWAY FROM MP 394.67 TO MP 469.50. THE WORK INCLUDES ASPHALT PATCHING, CRACK CLEANING AND SEALING
Department of Transportation · $3,682,908 · Jan 3, 2023
PROJECT NP SER BMS FY22(1) THE PROJECT CONSISTS OF PREVENTIVE MAINTENANCE REPAIRS ON 19 BRIDGES WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES THE REPAIR OF DETERIORATED EXPANSION JOINTS, ASPHALT PAVEMENT CRACK SEALING AND FILL
Department of Transportation · $1,924,744 · Sep 6, 2022
PROJECT NP BLRI 2J18, 2R21 THE PROJECT CONSISTS OF PERFORMING MAINTENANCE REPAIRS ON FOUR BRIDGES ON THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPLACEMENT OF BRIDGE BEARINGS, AND OTHER MISCELLANEOUS WORK.
Department of Transportation · $1,618,058 · Sep 1, 2022
PROJECT NP-GRSM 11(4): THE WORK IN SCHEDULE A INCLUDES THE REPLACEMENT OF THE TUNNEL DRAINAGE SYSTEM AND CHASES, REPAIRING CRACKED, SPALLED, AND DELAMINATED AREAS OF THE TUNNEL WALL, PERMANENT PAVEMENT MARKINGS, WALL DELINEATORS, DRAINAGE IMPROVEM
Department of Transportation · $9,821,057 · Aug 23, 2022
PROJECT TN ERFO FS 2019-1(1): THE PROJECT CONSISTS OF SLOPE STABILIZATION REPAIRS OF A 0.17-MILE SEGMENT OF HALLS TOP ROAD (FS-207). THE WORK INCLUDES CONSTRUCTION OF ROCK FILLED GABION WALLS SYSTEM, DRAIN DIP CONSTRUCTION, AGGREGATE ROADWAY RESURF
Department of Transportation · $485,143 · Aug 11, 2022
PROJECT AL CE BW T LAKES(1): THE PROJECT CONSISTS OF THE PAVEMENT REHABILITATION FOR LOCK 5 PARK AND LOCK 8 PARK INCLUDING ACCESS ROADS AND PARKING AREAS. THE WORK INCLUDES ASPHALT PAVEMENT OVERLAY, PLACING SHOULDER MATERIAL, FULL DEPTH PATCH SPO
Department of Transportation · $1,313,275 · Aug 4, 2022
PROJECT VA ERFO NPS BLRI 2020-1(2): THE PROJECT CONSISTS OF SLIDE REPAIR AT MP 119.7 AND MP 127.9. THE WORK INCLUDES SLOPE STABILIZATION REPAIRS WITH SOIL NAIL SYSTEM AND SHOULDER RECONSTRUCTION AT MP 119.7, A MECHANICALLY STABILIZED EARTH WALL A
Department of Transportation · $2,570,575 · Apr 26, 2022
PROJECT NP-GRSM 17(1): THE PROJECT CONSISTS OF RESURFACING CLINGMANS DOME ACCESS ROAD, INCLUDING PARKING AREAS AND PULL-OFFS, WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES ASPHALT PAVEMENT PATCHING, REMOVAL OF EXISTING PAVEMENT
Department of Transportation · $2,549,083 · Jan 13, 2022
PROJECT TN ERFO NP GRSM 2020-1(1): THE PROJECT CONSISTS OF REPAIRING STORM DAMAGE ON TOWNSEND ENTRANCE ROAD WITHIN THE GREAT SMOKY MOUNTAINS NATIONAL PARK. THE WORK INCLUDES REMOVING A PAVED PULL-OFF, CONSTRUCTING A ROCKERY, PLACING AND GROUTING RI
Department of Transportation · $596,533 · Nov 4, 2021
PROJECT NP SER PMS FY20(1) THE PROJECT CONSISTS OF PAVEMENT PRESERVATION TREATMENT IN THE ANDREW JOHNSON NATIONAL HISTORIC SITE. THE WORK INCLUDES MICRO SURFACING AND OTHER MISCELLANEOUS WORK.
Department of Transportation · $331,407 · Aug 10, 2021
Researching this competitor? BidCatch doesn't just show you what they won — it sends you the open bids in your trade every morning, before they're awarded. Free for 14 days, then $49.99/month.
Search open bids